Field Density Tests of Compacted Soils Method D-6938
Project: Proposed Residence Lot 136, Creekside Date: August 8, 2018
Address: 8332 Cobblestone Drive, Fort Pierce, FL Order #: 18DR713
Area Tested: Building Pad Permit #: 17fz- — 01/0 �76
Material Type: Brown Sand with Traces of Shell Tech: BK
Client: D.R. Horton, Inc.
Address: 1430-Culver Drive NE Compaction-Req.:
Palm Bay, FL 32907
95%
Proctor Method: ASTM D-1557
Test
#
TEST LOCATION
Probe
Depth
Elev.
Moist
%
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
/o
. Compaction
Pass
1
Center of Building Pad
12"
FL
9.1
103.3
107.0
14.0
96.5%
Yes
2
1NW Corner of Building Pad
12"
FL
13.01
106.8
107.0
14.0
99.8%
Yes
3
SE Corner of Building Pad
12"
FL
6.2
106.2
107.0
14.0
99.3%
Yes
4
5
6
7
8
9
10
12
13
14
Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer
This is a Compaction Test only on the top 12" of the pad and is not a verification, of Soil'Brcaring Capacity.
Legend for Elevation:
PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by:
SL = Springline FL = Final Lift Keith LeBlanc, P.E.
SG = Subgrade BG = Below Grade Federal Engineering:&Testing-, inc.
BC = Basecourse BOF = Bottom of Footing Florida Reg. No.-59394
TOP = Top of Pipe FG = Finished Grade Certificate of Authorization #5471:
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property -of clients, and authorization for publication of statements,
conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determihss.ti9 dag�ea of compaction of ti6 tasted layer of material
only. A density does not replace a soil bearing capacity determinatiori. These density tests do not certify the underlyin6,i l'matenals below the proposed structure. The results
do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soils -will suppl6rt the proposed structure
without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed tG evaluate'the suitability of the underlying
soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work.
PAGE 1 of 2
j
Pursuant to your request, Fi
project on the reverse side.
material only. In no way shE
performed by the client prior
12" of added fill material. FE
added fill material does not it
the proposed structure witho
conditions below the tested t
structure, we recommend pei
soil conditions.
pacted Soils Method D-6938 Disclaimer
eral Engineering ,& Testing, Inc. (FET) has performed a compaction test at the referenced
'he purpose of our test was to determine the degree of compaction of the tested layer of
a compaction test replace a soil bearing capacity determination. A soil boring test must be
construction to verify subsoil conditions. Our scope of services only included testing the top
was not contracted to perform supervision of the building pad preparation. This testing of the
ude an analysis of the underlying soil materials to determine if they are capable of supporting
settlement. This density compaction test does not warranty any underlying soil materials or
�I 12 inches of material. If no soil borings have been performed in the location of the proposed
Irming soil borings below all foundation areas of the proposedstructure to verify the underlying
Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is
required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is
for determination of the degree of compaction of the tested layer of material only. No -other analysis is implied or -warranted.
Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction
results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations
and 98% of -the AASHTO T-180lstandard for paved areas such as roadways and parking lots. If different specifications are
required, Federal Engineering & .Testing, Inc. shall,be notified.
Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other
areas or dates. Any subsequent, site disturbances due to water erosion, rain waters, construction ' activities, excavations,
overgrown, vegetation, traffic andl other disturbances will void this test and the site must be re -compacted and re -tested prior
to construction.
As a mutual protection to clients, Ithe public and ourselves, all reports are submitted are the confidential property of clients
and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved
pending written approval.
It has been a pleasure working with you and we look forward to doing so in the near future.
Page 2 of 2