Loading...
HomeMy WebLinkAboutFIELD DENSITY TESTPhone 954-784-2941 1919 edet'--a"I 954-784-7875 Fax 954-784-7875 & TESTING INC. www.fed-eng.com 250 SW 13th Ave Pompano Beach, FL 33069 Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot 136, Creekside Date: August 8, 2018 Address: 8332 Cobblestone Drive, Fort Pierce, FL Order #: 18DR713 Area Tested: Building Pad Permit #: 17fz- — 01/0 �76 Material Type: Brown Sand with Traces of Shell Tech: BK Client: D.R. Horton, Inc. Address: 1430-Culver Drive NE Compaction-Req.: Palm Bay, FL 32907 95% Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture /o . Compaction Pass 1 Center of Building Pad 12" FL 9.1 103.3 107.0 14.0 96.5% Yes 2 1NW Corner of Building Pad 12" FL 13.01 106.8 107.0 14.0 99.8% Yes 3 SE Corner of Building Pad 12" FL 6.2 106.2 107.0 14.0 99.3% Yes 4 5 6 7 8 9 10 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad and is not a verification, of Soil'Brcaring Capacity. Legend for Elevation: PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: SL = Springline FL = Final Lift Keith LeBlanc, P.E. SG = Subgrade BG = Below Grade Federal Engineering:&Testing-, inc. BC = Basecourse BOF = Bottom of Footing Florida Reg. No.-59394 TOP = Top of Pipe FG = Finished Grade Certificate of Authorization #5471: As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property -of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determihss.ti9 dag�ea of compaction of ti6 tasted layer of material only. A density does not replace a soil bearing capacity determinatiori. These density tests do not certify the underlyin6,i l'matenals below the proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soils -will suppl6rt the proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed tG evaluate'the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work. PAGE 1 of 2 j Pursuant to your request, Fi project on the reverse side. material only. In no way shE performed by the client prior 12" of added fill material. FE added fill material does not it the proposed structure witho conditions below the tested t structure, we recommend pei soil conditions. pacted Soils Method D-6938 Disclaimer eral Engineering ,& Testing, Inc. (FET) has performed a compaction test at the referenced 'he purpose of our test was to determine the degree of compaction of the tested layer of a compaction test replace a soil bearing capacity determination. A soil boring test must be construction to verify subsoil conditions. Our scope of services only included testing the top was not contracted to perform supervision of the building pad preparation. This testing of the ude an analysis of the underlying soil materials to determine if they are capable of supporting settlement. This density compaction test does not warranty any underlying soil materials or �I 12 inches of material. If no soil borings have been performed in the location of the proposed Irming soil borings below all foundation areas of the proposedstructure to verify the underlying Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. No -other analysis is implied or -warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of -the AASHTO T-180lstandard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & .Testing, Inc. shall,be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent, site disturbances due to water erosion, rain waters, construction ' activities, excavations, overgrown, vegetation, traffic andl other disturbances will void this test and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, Ithe public and ourselves, all reports are submitted are the confidential property of clients and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending written approval. It has been a pleasure working with you and we look forward to doing so in the near future. Page 2 of 2