HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT 7-18-18Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave
Fort Pierce, FL 34982
772-462-2172 Fax 772-462-6443
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT #:
BUILDER/CONTRACTOR:
PEST CONTROL CONTRACTO
PEST CONTROL LICENSE #: i
RECEIVED '
JUL 2 0 2018
Permitting Departmenv
St. Lucie Count
JOB ADDRESS:.31`��„�-
We, the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
iar-e feet if area treated: -I— Chemicals used:
Percentage of solution: -2-30/c)
Date of Treatment:. 7 f /Y41
Footing
1st Treatment
Re -Treat
Driveway
Ist Treatment
Re -Treat
1' Treatment
Re -Treat
Note; There must be a completed form for
site to be picked up by the inspector at time
fee charged. .
Total gallons used:
Time of Treatment:
Slab
15C Treatment
Re -Treat
Pools
lst Treatment
Re -Treat
erimeter for Final Inspection
1
of Exterminator Date
aired treatment or re -treatment and this form must be on the job
inspection or the scheduled inspection will fail and a re -inspection
FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistant jobs/te posting board
shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed,
Providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment
Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area
treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of
Protective treatment. If the soil chemical method for termite prevention is used, final exterior treatment shall
be completed prior to final building approval.
St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on
the electrical panel box cover, listing all the treatments and dates of applications.
Revised 7/24/2014