Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
FBC ENERGY CONSERVATION CODE
Planning « Development Services; Building & node Regulation Division 2300 Virginia Ave, Rm 201; Fort Pierce, FL 34982 772-462-2165 Fax 772-462-6443 FBC ENERGY CONSERVATION CODE R402.4.1.2 House Infiltration Test (Blower Door) Certification Prescriptive and Performance Method Date: �'I �� Permit #: j7/2--f OC-71 Contractor: H a<1D✓1 Job Address: f dewci*r Cc Construction: New Construction — Complete ( ) Existing — After Addition House Infiltration Teg Results SLC Climate Zone 2 LA CFM (50) _ 2,R Test Date• l© E Volume = ACH (50) = CFM (50) x 60 / Volume = '�— Mechanical Ventilation required less than 3 ACH Passing results must be & ACH (50) or less ().;IPass ( ) Fail FBC, Energy R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Texting shall be conducted with a blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. FBC, Residential R303.4 Mechanical ventilation. Where the air infiltration rate of a dwelling unit is less than 3 air changes per hour when tested with a blower door at a pressure of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation the dwelling unit shall be provided with whole -house mechanical ventilation in accordance with Section M1507.3. Testing Company Company Name q;-70 GQ ac � (13 )vJ Address: ao/o" vi I le 7-L 1 32225 I hereby rtify that the ab ve House Infiltration results demonstrate compliance with FBC Energy Conservation requir ments in accord ce with Section R402.4.1.2 Climate Zone 2. Printed Nam License/Certification #: '.Tanning & Development Services 7 `�,Ading & Code Regulation Division 2300 Virginia Ave, Rm 201 1J Fort Pierce, FL 34982 uZ 772-462-2165 Fax 772-462-6443 FBC ENERGY CONSERVATION CODE Duct Sealing Certification Prescriptive and Performance Method Date: �0 9 �$ Permit#: I �I (�?L� _.,.� Lot#: 7� Contractor. �'I u r'�y1 Address: J %�� .(� Z jrn Construction: 5irPost Construction Test ❑ Rough -in Test Test Conditions: d p �p Date: �8 / �0 Floor Area (ft2): O� Time: 3 31262M Primary Location of Supply Ductwork L Indoor Temperature (F): Primary Location of Return Ductwork Af'HC Outdoor Temperature (F): Total Leakage Test (Outside) Duct Leakage: ❑ Default ❑ Prop. Leak Free ❑ Proposed On = 3 Test Pressure: '-2.5 (Pa) Baseline Duct Pressure (optional) (Pa) Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: yPass ❑ Fail Installed Pa tat 53 Total Leakage (cfm): • �9 Total Leakage per 100 sgft: 2 9 al CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sgft. Testing Company 7 s� q'S%a a nc� Company NW6-__ G Address: JgC'IcsorivrI ( r- L 322�$ certify that the ove Duct Sealing Leakage results demonstrate compliance with 5t^ Edition FBC Energy Conservation requirements in accordance with R403.2.2. _.�..�._._. 1y uj w 1 Printed �e.:---Icrfil'eS License/Certificate #: