HomeMy WebLinkAboutFBC ENERGY CONSERVATION 5-10-18Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
772462-2165 Fax 772462-6443
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
Prescriptive and Performance Method
SCANNED
By
S
r ' / 1 /� �] �]) �1
Date: 1 Permit #: Il Iy `! ` /' Lot #:
Contractor: r J G 1 �1' d—� 1 Address: 61 06[e• r q'
Construction: 0,15ost Construction Test ❑ Rough -in Test V `e-fC., 1 4 f: 3 y
Test Conditions:
Date:
Time:
Indoor Temperature (F):
Outdoor Temperature (F):
-�0-) X
$' 0
Floor Area (ft2):
Primary Location of Supply Ductwork
Primary Location of Return Ductwork
Total Leakage Test (Outside) Z'
Duct Leakage: ❑ Default ❑ Prop. Leak Free d1proposed On = o
Test Pressure: —'Zr (Pa)
Baseline Duct Pressure (optional) (Pa)
Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: Pf Pass ❑ Fail
Installed Pa Sq .9
O 7.4f ZI 2 7 b� Total Leakage (cfm). j I 2
Total Leakage per 100 sgft:
CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sqft.
MAY 10 2018
Permitting Departmen - I
St. Lucie County, FL
Testing Company f %
Company Name: !//G/ �L— Address:
I hereby certify that the above Duct Sealing Leakage results demonstrate compliance with 5th Edition FBC Energy Conservation requirements in accordance with
Section R403.2.2. ,o /
Signature: v Printed Name: AICAAce— License/Certificate #: