Loading...
HomeMy WebLinkAboutFBC ENERGY CONSERVATION 5-10-18Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 772462-2165 Fax 772462-6443 FBC ENERGY CONSERVATION CODE Duct Sealing Certification Prescriptive and Performance Method SCANNED By S r ' / 1 /� �] �]) �1 Date: 1 Permit #: Il Iy `! ` /' Lot #: Contractor: r J G 1 �1' d—� 1 Address: 61 06[e• r q' Construction: 0,15ost Construction Test ❑ Rough -in Test V `e-fC., 1 4 f: 3 y Test Conditions: Date: Time: Indoor Temperature (F): Outdoor Temperature (F): -�0-) X $' 0 Floor Area (ft2): Primary Location of Supply Ductwork Primary Location of Return Ductwork Total Leakage Test (Outside) Z' Duct Leakage: ❑ Default ❑ Prop. Leak Free d1proposed On = o Test Pressure: —'Zr (Pa) Baseline Duct Pressure (optional) (Pa) Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: Pf Pass ❑ Fail Installed Pa Sq .9 O 7.4f ZI 2 7 b� Total Leakage (cfm). j I 2 Total Leakage per 100 sgft: CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sqft. MAY 10 2018 Permitting Departmen - I St. Lucie County, FL Testing Company f % Company Name: !//G/ �L— Address: I hereby certify that the above Duct Sealing Leakage results demonstrate compliance with 5th Edition FBC Energy Conservation requirements in accordance with Section R403.2.2. ,o / Signature: v Printed Name: AICAAce— License/Certificate #: