HomeMy WebLinkAboutBLOWER DOOR TEST FORMDate:_
Contractor:
Job Address:
Construction:
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
Phone:772-462.2165 Fax:772-462-6443
BLOWER DOOR TEST FORM
House Infiltration Test Certification
Prescriptive and Performance Method
��En/ED
40s _9 O1B
permitting O
3(. Iucle couR'nent
tv
0 � Permit #• Z2 / -Z -7S`
� 9
wo
(A) New Construction — Complete
( ) Existing — After Addition
House Infiltration jest Results SLC Climate Zone 2
CFM (50) = 1 `7/d Test Date: �' 7—
Volume = Z -7 Ffe /
ACH (50) = CFMi (50) x 60 / Volume = G(
Passing results must be & ACH (50) or less
(Me hanical Ventilation required less than 5 ACH
Pass ( ) Fail
FBC, (Energy
The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per
hour in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a
blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in
Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (1) or an
approved third party. A written report of the results of the test shall be signed by the party conducting the test and
provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building
thermal envelope.
FBC, Residential
Where the air infiltration rate of a dwelling unit is less than 5 air changes per hour when tested with a blower door at a
pressure of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida Building Code, Energyy'onservation
the dwelling unit shall be provided with whole -house mechanical ventilation in accordance with Section A4407.3.
>
Testing Company,
Company Name: Pro Duct Services Address:
1915 Rio Vista dr., Fort Pierce
I hereby certify that the above House Infiltration results demonstrate
compliance with FBC Energy Conson
requirements in accordance With.Section R402.4.1.2 Climate Zone 2.
``�''
�..11
Signature:
Michael Faurot
Printed Name:'be
Q
License/Certification #: 5059122„
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
772462-2165 Fax 772.462-6 3
FBC ENERGY CONSERVATION CODE
Duct Sealing Cef ification
Prescriptive and Performance Method
Date: z o - 1 Permit #: ? / .Z C" -7 S— Lot #::
Contractor: e Address: 2 c) 3 ti��,�' �1 , "0a,21 -14 fy
Construction: Ast Construction Test ❑ Rough4n Test
Test Conditions:
Date: If- - I Floor Area (ft2):
Time: 1,3' a Primary Location of Supply Ductwork
Indoor Temperature (F): '7 5.. Primary Location of Return Ductwork 6--
Outdoor Temperature (F): 9 0
Duct Leakage: ,4efault o Prop. Leak Free
Test Pressure: 7 _& 2C(Pa)
'Baseline Duct Pressure (optional) (Pa)
Duct Press. (Pa) I Flow Ring Fan Press
Tesfing Company
Company Name: Pro Duct Services
o Proposed On =
Total Leakage (cfm):
Total Leakage per 100 so:
CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sgft.
Address: 1915 Rio Vista Dr., Fort Pierce, FI. '
I hereby certify that the above Duct Sealing Leakage results demonstrate compliance with 5L) Edition FBC Energy Conservation requirements in accordance with
Section R403.2.2.
Signature: '✓`��='
Printed Name: Michael Faurot License/Certificate #: 5059122
BUILDING PERFORMANCE INSTITUTE, INC
107 Hermes Road, Suite 210
Malta, NY 12020
(877) 274-1274
www.bpi.org
Michael Faurot
Pi BPI ID#: 5059122
(SEE REVERSE SIDE FOR DESIGNATIONS AND EXPIRATION DATES)
A