Loading...
HomeMy WebLinkAboutKSM SOIL COMPACTION REPORTK S. M KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 MELBOURNE (321) 768-8488 FAX (561) 845-8876 C.A.: 5693 RE.: 37293 S.I.: 860 ST. LUCIE (772) 229-9093 SOIL COMPACTION REPORT FAX (772) 589-6469 ASTM D 1557 and ASTM D 2922 DATE TESTED PERMIT # CONTRACTOR JOB LOCATION March 29, 2006 Norman Construction 2171 Brocksmith Road Fort Pierce, Florida SCANNED By :)T LUCE COUNTY JOB # : 602338-1d/JL/cim APR 1 0 2006 ITEM TESTED Compacted Foundation Fill - Retest r TEST LOCATION DEPTH * PEN DRY MAX. DRY PERCENT OF SAMPLE READ DENSITY PROCTOR VALUE COMPACTION 1. S. L 0" - 12" 185 116.0 117'* 98.7 2. S.W. 12" - 24" 180 115.5 1198.3 3. Center 24" - 36" 175 115.0 If97.9 4. N.E. 36" - 48" 185 116.2 if98.9 5. N.W. 48" - 60" 180 115.3 It98.1 Soil Description: Brown Slightly Clayed Fine Sand With Traces of Shell Fragments In Place Moisture: 10.4 Percent Optimum Moisture: 10.7 Percent Max. Dry Density: 117.5 P.C.F. @ Test Locations The 119.01 w I I I I I I E 118.0-I-----I-----i-----I—--}----+----- G I I I I I H 1---- I -----:.I_—1----J-- I I I I I I P , 116.0 ----I —------- —,---- ---- c ► I I I I I F 115.0 I Density & Penetrometer D Readings Indicate the R 114.0 — Degree of Compaction Meets Y I I I I I I Minimum Required 113.04----------i-----�----t--- T- — For Unstaked Foundation 8 9 10 11 12 13 14 * Pen. Readings Taken to Natural Grade. Moisture - % of Dry Weight Respectfully Submitted: RonajGer, Fax 3-2688et 2 omer needs to insert permit # and deliver to building department