Loading...
HomeMy WebLinkAbout0804-0166 BUILDING PERMITCode Compliance Division 2300 Virginia Avenue Ft. Pierce, FL 34982 Phone: (772) 462-1553 Fax: (772) 462-1148 hftp:/Istiucleco.gov/ce Issued: 07/01 /2008 Job Location: 7659 PELICAN POINTE DR Permit Type: Building Residential (SFR) Job Description: S/D BUILDING PERMIT SCABYE® St Lucie County Page 1 Conf M 646 Permit #: SLC- 0804-0166 City: JENSEN BEACH NEW CONSTRUCTION OF A 3 STORY SINGLE FAMILY RESIDENCE 3 BEDROOM 3 1/2 BATH Contractor SANTOS DONALD Lot: 3 Block: Parcel: 3522-700-0007-000/0 SANTOS CONSTRUCTION CO (772) 336-3388 469 SW ROSEWOOD CV PORT ST LUCIE, FL 34986 Property Owner MARY DIMEO JR) (772) 283-9464 627 MADISON AVE STUART, FL 34996 Setbacks Left: 10.00 Right: 16.00 Front:25.10 Rear: 57.53 Zoning: HIRD Number of Units: 1.00 Floors: 3 Buildings: 1 Square Footage: 6,444.00 Minimum Floor Elevation: Flood Map: 303G Flood Zone: VE Elev: 10 Permit holder acknowledges through acceptance of this permit that separate permits must be obtained as required by the Florida Building Code including those for all electric, plumbing, mechanical, roofing, and structural work. Further, he/she acknowledges responsibility to comply with all requirements of the 2004 Florida Building Code. NOTICE: In addition to the requirements in this permit, there may be additional restrictions applicable to this property that may be found in the records of this County, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. s:553.79(10), F.S. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR BUILDING IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. s.713.135, F.S. Christopher Lestrange Building Official Date For Automated Inspections, Call (772) 462-1261 For Questions, Call (772) 462-2172 St. Lucie County Land Development Code Section 11.05.01 (A) (2) states; Building. Permits shall expire and become null and void if work authorized by such Building. Permit is not commenced, having called for and received a satisfactory inspection, within six (6) months from the date of issuance of the permit, or if the work is not completed within 18 months (permit by contractor) or 24 months (permit by owner) from the date of issuance of the Building Permit.