HomeMy WebLinkAbout0804-0166 BUILDING PERMITCode Compliance Division
2300 Virginia Avenue
Ft. Pierce, FL 34982
Phone: (772) 462-1553 Fax: (772) 462-1148
hftp:/Istiucleco.gov/ce
Issued: 07/01 /2008
Job Location: 7659 PELICAN POINTE DR
Permit Type: Building Residential (SFR)
Job Description:
S/D
BUILDING PERMIT SCABYE®
St Lucie County
Page 1
Conf M 646 Permit #: SLC- 0804-0166
City: JENSEN BEACH
NEW CONSTRUCTION OF A 3 STORY SINGLE FAMILY RESIDENCE 3 BEDROOM 3 1/2 BATH
Contractor SANTOS DONALD
Lot: 3 Block: Parcel: 3522-700-0007-000/0
SANTOS CONSTRUCTION CO (772) 336-3388
469 SW ROSEWOOD CV PORT ST LUCIE, FL 34986
Property Owner MARY DIMEO JR) (772) 283-9464
627 MADISON AVE STUART, FL 34996
Setbacks Left: 10.00 Right: 16.00 Front:25.10 Rear: 57.53 Zoning: HIRD
Number of Units: 1.00 Floors: 3 Buildings: 1 Square Footage: 6,444.00
Minimum Floor Elevation: Flood Map: 303G Flood Zone: VE Elev: 10
Permit holder acknowledges through acceptance of this permit that separate permits must be obtained as required by the Florida Building Code
including those for all electric, plumbing, mechanical, roofing, and structural work. Further, he/she acknowledges responsibility to comply with all
requirements of the 2004 Florida Building Code.
NOTICE: In addition to the requirements in this permit, there may be additional restrictions applicable to this property that may be found in the
records of this County, and there may be additional permits required from other governmental entities such as water management districts, state
agencies, or federal agencies. s:553.79(10), F.S.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR
BUILDING IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. s.713.135, F.S.
Christopher Lestrange
Building Official
Date
For Automated Inspections, Call (772) 462-1261
For Questions, Call (772) 462-2172
St. Lucie County Land Development Code Section 11.05.01 (A) (2) states; Building. Permits shall expire and
become null and void if work authorized by such Building. Permit is not commenced, having called for and
received a satisfactory inspection, within six (6) months from the date of issuance of the permit, or if the work is
not completed within 18 months (permit by contractor) or 24 months (permit by owner) from the date of issuance
of the Building Permit.