Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CERTIFICATE OF TERMITE TREATMENT 3-19-18
planning & Deveocpmenit Services Bu00ding & Code RegU000on Division 2300 Virginia Avq • Fort pierce, FL 34982 772-462-2172 Fau 7/72-4a-ws r,EK-T9F9r,ATEW TERMITE TREATMENT 2 - © 7,9-Lt JOB ADD $CANNED BY at Lucie Cots PERMIT # e_ - — BUILDER/CONTRACTOR: ' PEST CONTROL CONTRACT�Dp�.BUGTERMITE &PEST CONTROL INC. PEST CONTROL LICENSE We the undersigned, hereby certify that we have pretreated the ve described construction l Associationor subterranean termites in accordance with the standards of th Square feet if area treated: .I-!1 - Percentage of solution: Date of Treatment: 4411-s- Footing _moist Treatment Re -Treat Driveway Ist Treatment Re -Treat other 1st Treatment Re -Treat chemicals used: DOMINION 2L Total gallons used: Time of Treatment: _Slab Treatment Re -Treat Pools 1st Treatment Re- t Parimr Final Inspection inator e. F4L 5151 L� must be on the Note: There must be a completed insecto�at tirm me of each inspection or the scheduled Inspeceach requIred treatment or re -treatment �on�wl fall and a re-Inspectlon site to be picked up by theP fee charged. or FB C114.2. 6 Certificate of protective Treatment Certificates as each on of eiqulred protetcflve treatmeher nt is tcomplef dboard shall be provided to receive duplicate Treatment permit files, The Treatment providing a copy for the person the permit is Issued to and another copy for the building ate of th Certificate shall provide the en�concentration and numbey of the �ofgaltons usedplicator, time ntodesiabilsh a verifiable reece treatment, tord ofdon, area treated, chemical used, per protective treatment. If the soil chemicala b�rder method for termite prevention is used, final exterior treatment shall be completed prior to final building app St Lucia (�oaan�9 require for the Do�l the treatments Coy and dates ®f ep�{p� �$ ®ne� placed ®as the e0ec ulcer panel bow cover,, Duei�ou�g e0