Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT 7-19-18SCANNED BY Planning & Development Services Building &(Code Reguietion Division 2300 Virginia Ave Fora Pierce, FL 34982 772-462-2172 Fox 772-462-W3 CONSTRUCTION SOIL TREATMENT l3 ��.� a�� Or PERMIT #: % O 7 JOB ADDRE SS Ll �- BUILDER/CONTRACTOR: 3 MI PEST CONTROL CONTRACTOR: EVI T- -BUO TERMITE & PEST CONTROL INC. PEST CONTROL LICENSE #: J6175775 - We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: /�0 Percentage of solution: .o5"1u Date of Treatment: / k ._Foot ng 11t Treatment Re -Treat Driveway 1st Treatment Re -Treat Other 11t Treatment Re -Treat Note: There must be a completed form for i site to be picked up by the Inspector at time fee charged. Chemicals used: DOMINION 2L Total gallons used: CEOa Time of Treatment: - -- - & (go-, ._..Slab•'. .Sl_ist Treatment Re -Treat Pools 1st Treatment for Final Inspection I Fe- of Exterminator Wined treatment or re -treatment and this fonn must be on the job Inspection or the scheduled Inspection w11I fall and a re -Inspection FOCID4.2.6 Certificate of Protective Treatment for prevention of termites A weather res/stant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment Is completed, providing a copy for the person the permit Is issued to and another copy for the bullding permit files. the Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentratlan and number of gallons used, to establish a verifiable record of protective treatment, If the soil chemical barrier method for termite prevention is used, final exterlor treatment shall be completed prior to final building approval St Lucie County requires for the final inspection for (CO, a Permanent Sticker to he placed on the electrical panel box cover, plstinng all the treatments and dates of applications. 7/24/201A