HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT 7-19-18SCANNED
BY
Planning & Development Services
Building &(Code Reguietion Division
2300 Virginia Ave
Fora Pierce, FL 34982
772-462-2172 Fox 772-462-W3
CONSTRUCTION SOIL TREATMENT
l3 ��.�
a�� Or
PERMIT #: % O 7 JOB ADDRE SS Ll �-
BUILDER/CONTRACTOR: 3 MI
PEST CONTROL CONTRACTOR: EVI T- -BUO TERMITE & PEST CONTROL INC.
PEST CONTROL LICENSE #: J6175775 -
We, the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet if area treated: /�0
Percentage of solution: .o5"1u
Date of Treatment: / k
._Foot ng
11t Treatment
Re -Treat
Driveway
1st Treatment
Re -Treat
Other
11t Treatment
Re -Treat
Note: There must be a completed form for i
site to be picked up by the Inspector at time
fee charged.
Chemicals used: DOMINION 2L
Total gallons used: CEOa
Time of Treatment: - -- - & (go-,
._..Slab•'.
.Sl_ist Treatment
Re -Treat
Pools
1st Treatment
for Final Inspection
I
Fe- of Exterminator
Wined treatment or re -treatment and this fonn must be on the job
Inspection or the scheduled Inspection w11I fall and a re -Inspection
FOCID4.2.6 Certificate of Protective Treatment for prevention of termites A weather res/stant jobsite posting board
shall be provided to receive duplicate Treatment Certificates as each required protective treatment Is completed,
providing a copy for the person the permit Is issued to and another copy for the bullding permit files. the Treatment
Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area
treated, chemical used, percent concentratlan and number of gallons used, to establish a verifiable record of
protective treatment, If the soil chemical barrier method for termite prevention is used, final exterlor treatment shall
be completed prior to final building approval
St Lucie County requires for the final inspection for (CO, a Permanent Sticker to he placed on
the electrical panel box cover, plstinng all the treatments and dates of applications.
7/24/201A