Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT 3-21-18Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT #: I %1 L(-173 IJOB ADDRESS: BUILDER/CONTRACTOR: Vgdaa -+ 1e2A-0 e PEST CONTROL CONTRACTOR BUG TERMITE & PEST CONTROL INC. PEST CONTROL LICENSE #: JB175775 RECEIVED MAR '21 2018 Permitting Department St. Lucie County We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: rz Percentage of solution: •05�°i'o/ Date of Treatment:.. _Footing ­�__ist Treatment Re -Treat Driveway 1st Treatment Re -Treat Other 1st Treatment Re -Treat Chemicals used: DOMINION 2L Total gallons used: 0 2 d Time of Treatment: 0); rO- _Slab Treatment Re -Treat Pools 1st Treatment Re -Treat Peri:r for Final Inspection tivig,ture of Exterminator I Dat (Vote. There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the Inspector at time of each inspection or the scheduled Inspection will fail and a re-inspectlon fee charged. FBC104.2.6 Certificate of Protective Treatment for prevention of termites A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certlficates as each required protective treatment Is completed, provlding a copy for the person the permit Is issued to and another copy for the building permit files The Treatment Certificate shall pro vide the product used, Identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CQ, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/2412014