Loading...
HomeMy WebLinkAboutLETTER - ENGINEERING° - SCAN N E L, DEVELOPMENT REVIEW St Lucie Count, Project: BEACH AVENUE Type: BUILDING PERMIT Subject: REVIEW COMMENT To: Lydia Galbraith From: Edmund Bas PW-Engineering Division Due Date: February 9, 2018 February 9, 2018 1-1I-)ol5: 1. Beach Avenue shall be extended to the development's access point. The roadway extension shall be constructed with asphalt to match with the existing. A proposed roadway pavement section detail shall be provided for review and approval. 2. A Type T turnaround will be required at the end of the extension of Beach Avenue. 3. The proposed driveway within the road right-of-way shall be constructed of impervious all weather surface material such as asphalt or concrete. 4. The existing street termination signs shall be relocated at the western end of the Type T turnaround. The applicant is advised that prior to executing any work within the road -right-of-way, a Right -Of -Way (ROW) Permit is required. The permit shall be applied after the review and approval of the construction plans. Please contact Ms. Joanne Mitchell at 772-462-2824, email: mitchellj@stlucieco.org of the Engineering Division for the requirements necessary to obtain the permit. 6. The applicant is advised that prior to the issuance of a ROW Permit a Roadway Improvement Agreement (RIA) and the appropriate surety will be required. Please contact Mr. Grant Chambers, P.E. at 772-462-2741, email: chambersg@stluceico.org of the Engineering Division for more information. 7. The applicant is advised that a Driveway Permit will be required for the proposed driveway improvements. Please contact Mr. Baby Thottakara, P.E. at 772-462-2097 for more information.