Loading...
HomeMy WebLinkAboutSEPTIC LAYOUTWz z I"' Q Q J � St Lucie County Health Department) Environmental Health Division Site Plan Approved for Construction; Supersedes All Previous Site Plans fd OSTDS #56 & Well # ` Date: Reviewer: SvfMEV BY St L Llkn County PRESSURE PIPE 2" 0 SCH 40 PVC W/1/2" HOLES AT 4' O.C. (TYP.)- ESTABLISH VEGETATIVE COVER NATIVE BACKFILL , 15-4" INFILTRATOR SYSTEMS INC. QUICK4 STANDARD CHAMBER TYPICAL BED DETAIL SECTION VIEW A `C •,ryuej �� LOCATION MAP _;oQO= � • ':2y; 0 7 10 NOT TO SCALE �.z m �= s 9:C110fl 25. TOVW 31 SOUTH. RANGE 10 EAST ® 2 12 13 Sipj'•. `� r 1 H 43 14 EADODJl1 WAY 4 13 16 is it it it { 47 � 42 da q Y V 41 .� 17 1e 40 39 g s iD 33 30 26 21 POND K 31 25 22 33 32 24 23 � I TYPICAL LEGEND Q SET 5/B- IR/CAP LB 3591 IPE CONC. DRAINAGEEASEMENT G.V.GATERON VALVE GATE LA.E — LIMITED ACCESS EASEMENT COV. —COVERED P.P. — .POWER POLE LM.E —LAKE MAINTENANCE EASEMENT ELEV _ ELEVATION BLDG. BUILDING LM.A.E. — LAKE MAINTENANCE ESMT. — EASEMENT N.R. — NOT RADIAL ACCESS EASEMENT U.E. — UTILITY EASEMENT NO I.D.— NO IDENTIFICATION DENOTES PROPOSED ELEVATION uuas nouns 00.00 W.M. WATER METER Y.D. — YARD DRAIN K— DIRECTION OF FLOWeero"erou FUR. —FLOOR A/C — AIR CONDITIONER ow 00 DENOTES EXISTING ELEVATION FIN. —FINISHED C.B. —CATCH BASIN msn+e uvn P.I. -POINT OF INTERSECTION PROP. PROPOSED NG.V. — GATE VALVE ono o.e�a+au. o. „uot P.C. — POINT OF CURVATURE TYP.— TYPICAL P.C.0 — POINT OF COMPOUND CURVATURE R. — RADIUS tF.H. —FIRE HYDRANT P.R.C. — POINT OF REVERSE CURVE R,P. — RADIUS POINT �— STORM MANHOLE P.T. — POINT OF TRANSITION LP. — LIGHT POLE Q — SANITARY MANHOLE O.E. — OVERHANG EASEMENT C.O. — CLEANOUT CENTERLINE ELF_ — BUFFER EASEMENT M.H. - MANHOLE O.R.B. — OFFICIAL RECORDS BOOK SAN. - SANITARY [p WATER SERVICE C m PG. — PAGE ALUM. — ALUMINUM L — ARC LENGTH P,C,p,—PERMANENT CONTROL POINT it!QLL m Q — DELTA (CENTRAL ANGLE) P.R.M.—PERMANENT REFRENCE MONUMENT > e < ONNom v ♦O, v mEd SEPTIC SIZING PER TABLE I, ESTIMATED SEWAGE FLOWS: `_ 2 RESIDENTIAL* 4 BEDROOMS WITH 2,251-3,300 SQ.FT. OF BUILDING AREA = 400 GALLONS G) y PER DAY (GPD) FOR EACH ADDITIONAL 750 SF OR FRACTION THEREOF, I— a 3 ci INCREASE BY 60 GPD BUILDING SF = 4,086 THEREFORE FLOW = 520 GPD z FROM TABLE II, SEPTIC TANK AND PUMP TANK CAPACITY: O; AVERAGE SEWAGE FLOW — 520 GPD SEPTIC TANK MINIMUM EFFECTIVE CAPACITY — 1,350 GALLONS ; FROM TABLE III, DRAINFIELD SIZING (ASSUME TRENCH SYSTEM) FINE SAND, SLIGHTLY LIMITED — MAXIMUM SEWAGE RATE — 0.80 GAL/SF/DAY 520 GPD / .80 GAL/SF/DAY = 650 SF OF TRENCH AREA REQUIRED THEREFORE, UNOBSTRUCTED AREA REQUIRED = 650 X 1.5 = 975 SF o a 0 zo o a po 3" EXISTING GRADE `� w M., t102 � a PROPOSED TOP, OF SEPTIC FIELD 9.55 _ PROPOSED BOTTOM NOTES; SEPTIC FIELD 1. ALL ELEVATION SHOWN ARE IN OF OF NAVD 88 DATUM. 24„8.55 2. FEMA FLOOD —ZONE X. WSWT 6.55