Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT 10-30-18:t Planning & Dellopment services Building& Codeegu lotion Division 23o® V1 1nie Ave Fort Pierce, FL 34982 172-4 62-2a72- Fox 772-462-6443 C O i J S T !? ►_J C: Z 1 cil 1. J L A, PERMIT JOB AD BUILDER/CONTRA(; I UK: CT -A -BUG TERMITE & PEST CONTROL INC. PEST CONTROL CONTRACTOR: PEST CONTROL LICENSE #: J5175775 We, the undersigned, hereby that we have pretreated the above described eiI on for subterranean termites in accordance the standards of he National Pest Control Association. tion. Square feet if area treated: O � Percentage of solution: •05% /�, Date of Treatment:—4/2-0/ Chemicals used: DOMINION 2L Total gallons used: Z Time of Treatment: 3 �O ' Footing Slab 15t Treatment 11t Treatment —Re-Treat Re -Treat _Driv way Pools 1st Treatment 1st Treatment A-T t Re -Treat Other Perimeter for Final Inspection tment Re -Treat ure of Exterminator Date Sioe Note: There must be a completed form for each requlred treatment or re -treatment and this form must be on the job site to be picked up by the Inspector at time of each inspection or the scheduled Inspectlon will fall and a re-Inspectlon fee charged. FBC ,®4.2.6 Certifcate of Protective Treatment far prevention of termites A weather resistant jobsite posting board shall be provided to receive duplkate Treatment Certificates as each requlred protective treatment Is completed, providing a copy for the person the permit is Issued to and another copy for the bullding permit files, The Treatment Certificate shall provide the product used, Identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention Is used, final exterior treatment shall be completed prior to final bullding approval, St Lucie County requires ffor the ffana� BnsPecta®n for (SOP a permanent St�ckeu� t® �e placed ®n the e9ectriica0 panel box coverP 61eting a0l the treatments and dates of applications- Rcviscd 7/24/203.4