Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT 2-21-19From fax5616880909 1.161.688.0909 Thu Feb 21 10:04:15 2019 MST Page 1 of 1 N 0" ��,Fz —1w.09-3 By Ludle ()011'1�1I St Lucie County Inspections RECEIVED 2300 Virginia Avenue Ft Pierce, FL 34982 FEB 2 12019 (722) 462-2172 ST. Lucie County, Permitting CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT # C 1 � -jOB ADDRESS 2680 Conifer. Dr Fort Pierce FL 34951-2940 BUILDER CrIO Homes PEST CONTROL CONTRACTOR HomeTeam Pest Defense, Inc, PEST CONTROL LICENSE # JF0001886 We, the undersigned, hereby certify that we .have pretreated the above -described construction for subterranean. termites in accordance with the standards of the National pest Control Association. Square feet of area treated: 24 Chemicals used: Sentricon Alw.a s .Active HD Percentage of solataon: Total gallons used: Date of treatment: 02/20/20 Time of treatment: .AM * Footing. FI BC104.2.6 Certificate of Protective Treahneut for prevention of terrrsites. ®1 St Tr6atment A tiacather resistant jobsite posting board shall be provided to rePeive duplicate. res.'s nt Gerlifcates as eacli required protcctiVO trei<tment is El Re -treat completed, providing a copyfor the person thepoermit Ls "sued t4 and l.,er the building permit files. The Treatment Certfzcate shall ❑ Slab ❑ 1 st Treatment 'notcopyfor provide the product used, ideality of the applicator, time and date of the treatment; site location, area weared, chemical used, percent concentration ❑ Re -treat and number of gallons used, to establish a verifiable record of protective If the. soil chemical barrier method for termite prevention is used, ❑Driveway treatment. final exterior irealnrent shall be completed prior to final building approval. ❑ 1 st Treatment ❑ Re -treat St 1,nde County requires for the final inspection for CO, a Permanent panel box cover, listing all the. POQ�S Sticker to be placed on the electrical treatments and dates of applications. l st Treatment ❑ Re -[rent ❑ I st Treatment Signature of cxterfninator ❑ Re -treat Z Perimeter for Final Inspection NOTE: There must be a completed forin for each required treatment or re -treatment and thisforni must be on the inspection or the scheduled inspection Hillfail and a job site to be picked up by the inspector at tune of each re -inspection fee charged.