HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT 2-21-19From fax5616880909 1.161.688.0909 Thu Feb 21 10:04:15 2019 MST Page 1 of 1
N 0" ��,Fz
—1w.09-3
By
Ludle ()011'1�1I
St Lucie County Inspections RECEIVED
2300 Virginia Avenue
Ft Pierce, FL 34982 FEB 2 12019
(722) 462-2172
ST. Lucie County, Permitting
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT # C 1 � -jOB ADDRESS 2680 Conifer. Dr Fort Pierce FL 34951-2940
BUILDER CrIO Homes
PEST CONTROL CONTRACTOR HomeTeam Pest Defense, Inc,
PEST CONTROL LICENSE # JF0001886
We, the undersigned, hereby certify that we .have pretreated the above -described construction for subterranean.
termites in accordance with the standards of the National pest Control Association.
Square feet of area treated: 24 Chemicals used: Sentricon Alw.a s .Active HD
Percentage of solataon:
Total gallons used:
Date of treatment: 02/20/20 Time of treatment: .AM
* Footing.
FI BC104.2.6 Certificate of Protective Treahneut for prevention of terrrsites.
®1 St Tr6atment
A tiacather resistant jobsite posting board shall be provided to rePeive
duplicate. res.'s nt Gerlifcates as eacli required protcctiVO trei<tment is
El Re -treat
completed, providing a copyfor the person thepoermit Ls "sued t4 and
l.,er the building permit files. The Treatment Certfzcate shall
❑ Slab
❑ 1 st Treatment
'notcopyfor
provide the product used, ideality of the applicator, time and date of the
treatment; site location, area weared, chemical used, percent concentration
❑ Re -treat
and number of gallons used, to establish a verifiable record of protective
If the. soil chemical barrier method for termite prevention is used,
❑Driveway
treatment.
final exterior irealnrent shall be completed prior to final building approval.
❑ 1 st Treatment
❑ Re -treat
St 1,nde County requires for the final inspection for CO, a Permanent
panel box cover, listing all the.
POQ�S
Sticker to be placed on the electrical
treatments and dates of applications.
l st Treatment
❑ Re -[rent
❑ I st Treatment
Signature of cxterfninator
❑ Re -treat
Z Perimeter for Final Inspection
NOTE: There must be a completed forin for each required treatment or re -treatment and thisforni must be on the
inspection or the scheduled inspection Hillfail and a
job site to be picked up by
the inspector at tune of each
re -inspection fee charged.