Loading...
HomeMy WebLinkAboutLETTER - INSPECTION'a rJ sc NNED pp ryryaaBY St Lurle COUntY Nuelle Engineering Date: 10/17/2015 Donald J. Nuelle P.E. 815 University Boulevard Apt. 301 Jupiter, FL 33458 Cellular 561-629-6975 GHO Homes 590 NW Mercantile Place Port St. Lucie, FL 34986 Attn: Bill Handler Re; Termite Treatment Option Dear Mr. Handler.: Per your request, I have inspected the termite treatment requirements in the FBC and find the baiting method (which is used on all GHO homes) should have been specified on the foundation notes instead of the soil treatment. The soil treatment note is an error and should be omitted. R318.1.7 If a registered termiticide formulated and registered as a bait system is used for subterranean termite prevention, Section R3'18.1.'1 through Section R318.1.6 do not apply; however, a signed contract assuring the installation, maintenance and monitoring of the baiting system that is in compliance with the requirements of Chapter 482, Flofida Statutes, shall be provided to the building official prior to the pouring of the slab, and the system must be installed prior to final building approval If you or any other interested party has any questions or requires additional information please feel free to contact me at any time. Donal J... Nuelle P.E % P.E. # - 04