HomeMy WebLinkAboutSEWAGE CONSTRUCTION INSPECTION & FINAL APPROVALCANNED
t Luck- County
STATE OF FLORIDA
DEPARTMENT OF HEALTH
ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM
CONSTRUCTION INSPECTION AND FINAL APPROVAL
RECeNED
APPLICATION #:AP1328818
PERMIT #:56-SF-1823230
APPLICANT: Associated Homes " NOV 1 4'2018
g D
ineparture
AGENT: Atlantic Land Designs of the TC permitting �c„�h�
nlc
Sty
PROPERTY ADDRESS: 4606 Buchanan Dr Fort Pierce, FL 34982
LOT: 24 BLOCK: 36
DOCUMENT # : FI 1227306
DATE PAID:02/14/2018
FEE PAID :515.00
+AR-Pin-3482326
SUBDIVISION:
Indian River Estates ID#:
3402.605-0089-000-7
CHECKED [X] ITEMS ARE NOT IN COMPLIANCE WITH STATUTE OR RULE AND MUST BE CORRECTED.
TANK INSTALLATION
SETBACKS
[ ]
[01]
TANK SIZE [1] 1050.00 [21
[
]
[271
SURFACE WATER
FT
[ ]
[021
TANK MATERIAL Concrete
[
]
[28]
DITCHES
FT
[ ]
[031
OUTLET DEVICE
[
]
[291
PRIVATE WELLS
FT
FT
[ ]
[04]
MULTI -CHAMBERED [L_!j N ]
[
]
[301
PUBLIC WELLS
[ ]
(051
OUTLET FILTER Polylok PL-68
[
]
[31]
IRRIGATION WELLS
FT
[ ]
[061
LEGEND 1. 01-011-09DC3 2,
[
]
[321
POTABLE WATER 30
FT
[ ]
[07]
WATERTIGHT
[
]
[331
BUILDING FOUNDATIONS 7
FT
[ ]
[08]
LEVEL
[
]
[341
PROPERTY LINES 5
FT
[ ]
[09]
DEPTH TO LID
[
]
[351
OTHER
FT
DRAINFIELD INSTALLATION
FILLED / MOUND SYSTEM
[ ]
[101
AREA [1] 504 [2]
SQFT [
]
[36]
DRAINFIELD COVER
[ ]
[11]
DISTRIBUTION BOX HEADER
X [
]
[371
SHOULDERS
[ ]
[121
NUMBER OF DRAINLINES 1. 6.00 2.
[
]
[381
SLOPES
[ ]
[131
DRAINLENE SEPARATION
[
]
[391
STABILIZATION 11/02/2018
[ ]
1141
DRAINLINE SLOPE
[ ]
[151
DEPTH OF COVER
ADDITIONAL INFORMATION
( ]
[161
ELEVATION [ ABOVE / BELOW ]BM
3.00 [
]
1403
UNOBSTRUCTED AREA
[ ]
(171
SYSTEM LOCATION
[
]
[411
STORMWATER RUNOFF
[ ]
[18]
DOSING PUMPS
[
]
[421
ALARMS
[ ]
[19]
AGGREGATE SIZE
[
]
[431
MAINTENANCE AGREEMENT
j
I ]
[201
AGGREGATE EXCESSIVE FINES
[
]
[441
BUILDING AREA
[ ]
[21]
AGGREGATE DEPTH
[
]
[451
LOCATION CONFORMS WITH SITE PLAN
[
]
[46]
FINAL SITE GRADING
FILL / EXCAVATION MATERIAL
[ ]
[47]
CONTRACTOR David Whiteside (Accurate Se
[ ]
[22j FILL AMOUNT
[ ]
[48] '
OTHER INFILTRATOR Quick4 EQ36 (single c
[ ]
[23] FILL TEXTURE
[ ]
[241 EXCAVATION DEPTH
ABANDONMENT
[ ]
[251 AREA REPLACED
[ ]
[49]
TANK PUMPED
[ ]
[261 REPLACEMENT MATERIAL
[ ]
[501
TANK CRUSHED &'FILLED
Comments: Comments are on page 2.
/
St. Lucie CHD
DATE: 09/10/2018
CONSTRUCTION
[ APPROVED
DISAPPROVED ] ° Environmental Specialist 11 B
J Ingram (ENVIRONMENTAL HEALTH)
FINAL SYSTEM
( APPROVED /
St. Lucie CHD
DATE: 11/02/2018
DISAPPROVED ]:
Envifonmental Specialist II Brt
J Ingram (ENVIRONMENTAL HEALTH)
(Explanation of Violatione on following page)
DR 4016, 08/09
(Obsoletes all previous editions which may not
be used)
Incorporated:
64E-6.003, FAC
Page 2 of 3
I
EH Database v 1.0.1 AP1328818
EID1823230
Comments
The system is sized for 4 bedrooms with a maximum occupancy of 8 persons (2 per bedroom), for a total estimated flow of 400
gpd. New ST, outlet filter, and 6x7 long DF installed. No violations, system ok to cover. Contractor notified onsite. Needs final
inspection for mound system and final site grading.
Final system approved. Contractor and building department emailed final approval.
DS 4016, 08/09 (Obsoletes all previous editions which may not be used)
Incorporated: 64E-6.003, PAC Page 2 of 3
EH Database v 1.0.1 AP1328818 EID1823230