HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT10/15/2018 10:16AM 7723348877 Taylor Pest Managemt PAGE 01/01
90ANNED
By
St Lucia Coin '
CpSt Lucie County Insm
2300 "Virginia .Avenue
Ft Pierce, FL 34982
0(772) 4624172
RECEIVED
OCT 15 2018
ST. Lute Qounty, Permitting
CERTIFICATE OF TERMITE TREATMENT
CONSTRUC TON SOIL TREATMENT
PERMIT #l�oZ � o �2� JOB
BUtLri]Eit o�1-��� .VI/ i477�
.PEST•CONTROLCONI'ltACTOR 71;1lr o✓L i ,4� 'i�l-1 7
PEST CONTROL LICENSE .#
0,e> (5 dl'5 L -
We, the undersigned, hereby certify that we have pretreated the above -described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet of area treated: 251-
Percentage of solution: ' 0 S-/ ,
Date of treatment: 9 - 2'1 J 1
Woodug .
1st Treatment
Ro-treat
❑ Slab
❑ 1st Treatment
0 Re -treat
❑ Driveway.
❑ t st Treatment
1❑ Re -treat
Q Pools
❑ 1st Treatment
❑ Re -treat
❑ Other
❑ 1st Treatment
❑ Re -treat
Chemicals used: ;549 1>1 T r
Total gallons used: , .30
Time of Treatment:
FBC104.2.6 Cerdj"irate of Protective Dvatment for prevention of termites.
A weather resistant jobsire posting board shall be provided to receive
duplicate Treatment Certificates as each required protective treatment is
completed, providing a copy for the person the permit is issued to and
another copy for the building permit files. The Treatment Certificate shall
provide the product used, identity of the applicator, time and date of the
treatment, site location, area treated, chemical used percent conceruradon
and number of gallons used, to establish a veritable record of protective
treatment. If the soil chemical barrier method for termite prevention is used,
final exterior treatment shall be completed prior ro faud building approval.
St Lucie County requires for the final inspection for CO, a Permanent
Sticker to be placed on the electrical panel box cover, listing all the
treatments and dates of applications.
❑ Perimeter for Final Inspection
ti
Signature of externninator
NOTE:
There must be a completed form for each required treatment or re -treatment and this form`rnrtst be on
the job site to be ,picked" up by the inspector at tune of each inspection or the scheduled inspection will
fail and a re -inspection fee changed.
Revised 6113102 &ng