HomeMy WebLinkAboutLETTER REVISIONS TO PROJECT MEET & APPROVEDo�
EDLUND: ITENBAS • BINKLEY
ARCHITECTS,AND'•ABSOCIATES;
Men-ibers of the Amer. ioan institute of Architects r
AR#-AAC000S,B
Date: July 7,'2006
To: Weintraub Building Inspector
Re..IRNB Business` Park Branch
Port St. Lucie, FL:.
To, Whom It May Cpricern:.
We certify that the"following revisions for the,above,refereiiced`project were, made and ;
meet ,"nth our approval.
• 1.,. Triple"2x10•beam at'covered entrance (at inside column) has:been revised-to•(2) 2
x Ws:: 'The (2) 2 x` 10's. are -hung from the gable end'truss with. a- beam hanger
and 20" strap tap-conned'to concrete'beam below.
2.' In,lieu :of hand framing at roof by ,dormer, pre=engineered rooftr iss_ es were used:
3_ 'Air-handlerswere'.moved; see as`built drawing from Colkitt A/C. Air handlers are
suspended with chains in lieu' of threaded. rods.
4. Enclosdd..is. a piperpen'etration' detail;for thru;.firewalt.
If you'have any questions or need'further clarification •please contact us.
esp�ectfu ly subrnitted,
•' i
Jo E..,
Cc �haarsk Construction''
T e e
eiler. -
- }` ; 65 Royal Falrri Pointe Suite D, Vero Beach , FL 329EO
Verc Beach 772/6'69-432`O ceerfieid.Beach 954%429-0996
;,Fax772/669-9206' Fax 964%421-8269