HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT 4-16-18SCANNED
BY
St Lucie Countv
Planning &(Development Services
Building & Code Regulation ®ivision
2300 Virginia Ave
• Folly pierce, FL 34982
' 7e2-462-2172 Fax 772-462-6443
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT #: )$02 e 02a JOB ADDRESS: r� ���
BUILDER/CONTRACTOR: ° �� d �MTR4 r
PEST CONTROL CONTRACTOR: EVICT -A -BUG TERMITE & PEST OLC.
PEST CONTROL LICENSE #: J8175775
We, the undersigned, hereby certify that we have pretreated the aboe the Pestribed construction for
Con rol Association.
subterranean termites in accordance withe standards of the Natio
Square feet if area treated: 3 z
�� Chemicals used: DOMINION2L
Percentage of solution: •05°%
Date of Treatment: 6 "
Footing
1st Treatment
Re -Treat
Driveway
1st Treatment
Re -Treat
Other
11t Treatment
Re -Treat
Total gallons used: b q
Time of Treatment:
Slab
21st Treatment
Re -Treat
Pools
11t Treatment
Re -Treat
t—krimeter for Fi I Inspection
Signature of Extermi to
L?tl15-
6le-1i
5 form must be on the job
Note: There must be athe !Inspectompleted r at tirm me of eaceach h requiredtreatment
or the scheduled Inspection Iw111 fall and a re -Inspection
site to be picked up y
fee charged.
EFO CID4.2.6 Certi>icate of Protective Treatment for prevention of termites A weather resistant jobsite posting board
shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed,
providing a copy for the person the permit is issued to and another copy for the building permit tiles The Treatment
Certificate shall pro vide the product used, Identity of the applicator, time and date of the treatment, site location, area
llons used, to
treated, i e treatment
used, f f the soil cent chemical barrier method for tencentration and number of rmite prevention Isaused, final verifiable
for treatment shall
protective titer
be completed prior to final building approval,
St Lucie Caunty requires for the final inspection for CO, a Permanent Sticker to be placed on
the electrical panel Doss cover, listing all the treatments and dates of appllcatiOns.
Rcviscd 7/24/2024