Loading...
HomeMy WebLinkAboutTRUSS PLACEMENT PLAN1WILUER"S WARNING' Go COMPONENTS AS DEFINED BY WICA 1 - 1996. 1) FOR THE ERECTION BRACING FOLLOW INSTRUCTIONS STRUCTURAL DATA, NUMBER OF GIRDER AND DESIGN DPARTMENT APPROVES THEM IN ADVANCE BE INSTALLED RAMS HAVE NOT ANALYZED BY RY THEBIL SON STRONG -TIE UNLESS LL HANGERS ARE NSTALL ARING POINTS MUST ERIOR EASTDIAOAST TRUSS 2) BRACING FORTHESTRUCTURE IS HE PLIES AND THE CONNECTION INFORMATION. OTHERWISE NOTED, HANGERS ACCORDING ERECTION INSTALLATION THEPONSIBILITY OF S. DEPARTMENT UERATIIONS OTHE CURRENT SIMPSON STRONG -TIE CATALOG TO INSTALLING ANY TRUSSES! FAILURE FOLLOW INSTRUCTIONS ON THE BCSFBIR SUMMARY ENGINEERED 3)IINSTALL B BRACINGASSTATED ON SEALED ANDORR PAIRSSTO TRUSSES IN 8'-0" WALL HEIGHT V� i Indicates Left End Of Truss On Layout & Engineering Sheets StLucl,�Cowty t it , II 1 �i XI r i I �3 The Architect's or Architect's representative's shop drawing approval is NOT a "double check" of the contractor. The contractor Shall remain responsible for checking field measurements and other construction criteria. Architect's approval covers general roof shape, review of truss strapping, and loading on structure from gravity and uplift loads and their respective locations. �t!���,�'�'�yn�'/n� Approve B 1 -IW1A: kW Date:_ � Braden i Braden A.I.A. P.A. 5r CANT FLT EAST COAST TRUSS 52A5 ST. LUCIE BLVD. FT. PIERCE IT 349646 OFFICE my W-2480 FAX MZ466-5336 USTOMER:Mei-Ry Constructi JOB NAME:Michielsen Res. DDRESS:Lot xxx Nettles Island ITY/CNTYPort St. Lucie/St. Luc t;• 5 'CZ JOB # w MODEL [???] ARAGE u) Q FT 899 ATE 01/29/18 = 61G15S-31.003 (3) (e), EAST COAST TRUSS is M, "Truv Desire Enainrnr• Tra»n art dai,W in..Annre wish me Florida Bnildine Code approving this placement planls), signatured anywhere on this sheet, the stomer or his imasemlive acknowledges met this placement plan complie in the stluctural intent M the project. The astomar also aanowletlges met this approval aumodies EAST )AST TRUSS to manufacture these Busses and deliver them to the project kcated on this drawing. The rushlmer also acknowledges Met hehhe accepts financial :ponsiblllly for any repair, engineering, and labor required due to snore tar than those of EAST COAST TRUSS. signed: DDE =FBC 2017/TP12014 ASCE 7-1 =SIGN CRITERIA =MWFRS CCUPANCY CATEGORY = II KPOSURE = C WF SPEED =170 JILDING TYPE =ENCLOSED EAN HEIGHT =15.00 GRAVITY LOADS >R: DUR FACTOR= 1.0 TCLL - TCDL- BCLL-BCDL 40.0,10.0,0.0,5.0 F: DUR FACTOR= 1.25 :TCLL - TCDL - BCLL - BCDL 20.0,15.0, 0.0,10.0 'NON -CONCURRENT BC LL 10psf UNLESS SHOWN ON ENGINEERED TRUSS DRAWING. ALL GIRDER/COLUMN LOADS MUST BY-PASS FLOOR TRUSS UNLESS SHOWN ON ENGINEERED TRUSS DRAWING. FLOOR TRUSSES SPANNING 20'-0' OR MORE SPREADER BAR SHOULD BE AT LEAST 12 TO 2/31N LENGTH AS THE SPAN OF THE TRUSS BEING SET. REFER TO BCI-81 FOR COMPLETE ERECTION AND SAFETY PROCEDURES. SUPPORT ANY PLANT SHELVES y TRUSS PLACEMENT PLAN