HomeMy WebLinkAboutENVIRONMENTAL PROTECTION - SELF CERTIFICATIONSi
i
01
Florida Departmenj%JeC
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
RECEIVED Rick Scott
JAN 2 3 2018
� Governor
ST. WgIQ gownty, Parmltting
Carlos Lopez-Cantera
Receipt for Submission
SELF CERTI.
A PROJECT AT A PRIVATE,
01/03/2018
Self Certification File No.: 0360067001EE
File Name:1248 Nettles Blvd Jensen Beach, FL
- Self Certification Repair and Replace - Dock i
TION FOR
TLE-FAMILY RESIDENCE
uatic Preserves)
Lt. Governor
Noah Valenstein
Dear Bruce Jerner: On, 01/03/2018, you used the Florida Department of Environmental
Protection's electronic Self Certification Process to certify compliance with the terms and
conditions of the Federal State Programmatic General Permit (SPGP) Self Certification
Process for a project at private, single-family residence located at:
LAT - Degrees: 27 Minutes: 17 Seconds: 0.6923
LONG - Degrees: -80 Minutes: 13 Seconds: 21.143
SITE ADDRESS: 1248 Nettles Blvd Jensen Beach, FL 34957
COUNTY: St. Lucie
For:
Secretary
MADELLINE COE
1248 NETTLES BLVD Jensen Beach, FL
You have certified that the project you propose to construct at the above location meets all the
conditions of the Self -Certification Process. A project that is built in conformance to those
conditions (attached for reference) will:
1. Qualify for a regulatory exemption under Section 403.813(1)(b) of the Florida Statutes
(F.S.) and Chapter 62-330, Florida Administrative Code (F.A.C.). As such, it is exempt
from the need to obtain a DEP Environmental Resource Permit.;
2. Qualify for Consent by Rule or Letter of Consent (as applicable) under Chapter 253,
F.S. and Chapter 18-21, F.A.C. (and Chapter 258, F.S. and Chapter 18-20, F.A.C., if
applicable), when the project is located on submerged lands owned by the State of
Florida.;
Your Self -Certification is based solely on the info.
applies only to the statutes and rules in effect whe
certification is effective only for the specific proje
constructed, operated, and maintained in conform;
limitations stated in the Self -Certification Process
your plans should be submitted to the Department
being required.
You have acknowledged that this Self
1. Construction of the project is not con
date;
2. site conditions materially change;
3. the terms, conditions, and limitations
4. the governing statutes or rules are air.
Completion of the Self Certification constitutes
personnel to enter the property for purposes of i
nation you provided under this process, and
your certification was completed. The
proposed, and only if the project is
Lce with all the terms, conditions, and
n addition, any substantial modifications in
:)r review, as changes may result in a permit
will automatically expire if -
within one year from the self -certification
Self Certification are not followed; or
before construction of the project.
authorization for Department or Corps
sting for compliance.
Receipt of this Self -Certification constitutes authorization to use sovereignty/state-owned
submerged lands, as required by rule 18-21.005, F.A.C.
The authorization must be visibly posted during ali construction activities.
In waters that are accessible to manatees, obtain information on your mandatory Manatee
Protection sign by clicking here.
i
FEDERAL STATE PROGRAMMATIC GENERAL PERMIT (SPGP)
You have certified that the project you propose to construct at the above location meets all the
conditions of the SPGP Self -Certification Process and will be built in conformance to those
conditions (attached for reference). Your proposed activity as certified is in compliance with
the SPGP program. U.S. Army Corps of Engineers (Corps) Specific conditions apply to your
project, attached. No further permitting for this activity is required by the Corps. In the event
of the transfer of ownership of the property by sale or by any other means, when the structures
or work authorized by this SPGP Self -Certification are still in existence at the time the
property is transferred, the terms and conditions of this SPGP Self -Certification will continue
to be binding on the new owner(s)of the property. Although the construction period for works
authorized by Department of the Army permits is finite, the permit itself, with its limitations,
does not expire. To validate the transfer of this SPGP Self -Certification and the associated
responsibilities associated with compliance with its terms and conditions, the attached transfer
of SPGP Self -Certification request must be completed and submitted to the Department at the
time of transfer of ownership. The address is given below on the attached transfer form. This
SPGP Self -Certification is based solely on the information you provided under this process,
and applies only to the statutes and rules in effect when your certification was completed. You
have recognized that your certification is effective orily for the specific project proposed, and
provided the project is constructed, operated, and maintained in conformance with all the
terms, conditions, and limitations stated in the SPGP Self -Certification Process. This Self -
Certification will not apply if any substantial modifications are made to the project. You agree
to contact the Department for review of any plans to construct additional structures or to
modify the project, as changes may result in a permit !being required. You have acknowledged
that this Self -Certification will automatically expire if 1. construction of the project is not
completed by midnight, July 25, 2021, unless construction commenced or a contract to
construct was executed before July 25, 2021, in which case the time limit for completing the
work authorized by the SPGP ends at midnight, July 25, 2022. However, in no case can
construction continue for more than one year beyond the Self -Certification date; 2. site
conditions materially change; 3. the terms, conditions 1 and limitations of the Self -Certification
are not followed; or 4. the governing statutes or rules are amended before construction of the
project. Completion of the Self -Certification constitutes your authorization for Department or
Corps personnel to enter the property for purposes of inspecting for compliance. If you have
any questions, please contact your local Department District Office. Contact information can
be found at: https://floridadep.gov/water/submerged-lands-environmental-resources-
coordination/documents/district-office-contacts. For further information, contact the Corps
directly at: http://www.saj.usace.army.mil/Missions/R69ulatory.aspx. When referring to your
project, please use the SPGP Self -Certification file number listed above. Authority for review -
an agreement with the U.S. Army Corps of Engineers entitled Coordination Agreement
between the U. S. Army Corps of Engineers (Jacksonville District) and the Florida Department
of Environmental Protection State Programmatic General Permit, Section 10 of the Rivers and
Harbor Act of 1899 and Section 404 of the Clean Water Act.
ADDITIONAL INFORMATION
This Self -Certification Process does not relieve you from the responsibility of obtaining other
permits or authorizations from other agencies (federal, state, Water Management District, or
local) that may be required for the project. Failure too obtain all applicable authorizations prior
to construction of the project may result in enforcement.
I
If you have any problems with the a
(850) 245-8495 or by e-mailing us
Sincerely, Florida Department of
he ERP Coordinator at