Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutPRODUCT APPROVAL ROOFING UNDERLAYMENTFlorida Building Code Cinlir
Page 1 of 2
BCIS Home I Log In I User Registration
Florida
Product ApprovalUSER: Public User
a
Product APProval Menu > Emlj t or Application
FL #
Application Type
Code Version
Application Status
Comments
Archived
Product Manufacturer
Address/Phone/Email
Authorized Signature
Technical Representative
Address/Phone/Email
Quality Assurance Representative
Address/Phone/Email
Category
Subcategory
Compliance Method
Florida Engineer or Architect Name k
the Evaluation Report
Florida License
Quality Assurance Entity
Quality Assurance Contract Expiratioi
Validated By
,5(;ANNED _
BY �Q
at Lucre CountR.
� a
)pits Submit surcharge Stats & Facts Publications I F8C Staff BCIS Site Map i Links IH'Search j
r'o r {ale
ST. LUCIE COUNTY
BUILDING DIVISION
RFEVIFVycar
POP,CORP01 r .es�
> Application List > Application Detail
FL16048-R6
Revision
2017
Approved
Tri-Built Materials Group, LLC
PO Box 70,
Rutherford; NJ 07070
(800) 516-1485
david.ruiz@tribuiltmg.com
David Ruiz
david.ruiz@tribuiltmg.com
DATE 1 (S
PLANS AND PE�fil':91T
Pr1UST SE KEPT ON JOB OR
No lNSPEC:TI©N WILL V32 MADE
THESE PLANS AND ALL PROPOSED WORK
ARE SUNECT'i O ANY CORRECTIONS
REQUIRED BY FIELD INSPE OTORS THAT
WAY BE NECESSARY IN ORDER TO
COMPLY WITH All A11PLIMULL c E0.
David Ruiz
250 Route 17 North
East Rutherford, NJ 07073
(201) 842-2449
david.ruiz@tribuiltmateriaisgroup.com
Roofing
Underlayments
CONMLED FASTENERS OR ATTACHMENTS
ARE THE RESPONSIBILR OF THE
CONTRACTOR OF RECORD
Evaluation Report from a Florida Registered Architect or a Licensed
Florida Professional.Engineer
❑, Evaluation Report - Hardcopy Received
o developed Robert Nieminen
PE-59166
UL LLC
Date 07/18/2020
John W. Knezevich, PE
Validation Checklist - Hardcopy Received
Certificate of Independence FL16048 R6 COI 2017 01 COI Ni minen pdF
Referenced Standard and Year (of Standard) Standard Year
ASTM D1970 2015
ASTM G155 2005
FM 4474 2011
FRSA/TRI April 2012 (04-12) 2012
UL 1897 2012
Equivalence of Product Standards#
Certified By
P
Sections from the Code
hops://www.floridabuilding.org/pr/pr_app dtl.aspx?param=wGEVXQwtDgtFPmdYiND... 1/12/2018
Florida Building Code Onlirr--
Page 2 of 2
Product Approval Method
Date Submitted
Date Validated
Date Pending FBC Approval
Date Approved
Summary of Products
Method 1 Option D
09/25/2017
10/01/2017
10/03/2017
12/12/2017
FL #
Model, Number or Name
Description
16048.1
TRI-BUILT Roof Underlayments
Self -adhering, modified bitumen roof underlayments
Limits. oP Use
Approved for use in HVHZ: No
Installation Instructions
FL16048 R6 II 2017 09 FINAL ER TRI-
Approved for use outside HVHZ: Yes
Impact Resistant: N/A
BUILT UNDERLAYMENTS FL16048-R6 odf
Design Pressure: +N/A/-150
Verified By: Robert Nieminen PE-59166
Created by Independent Third Party: Yes
Other: 1.) The design pressure noted herein pertains to use
Evaluation Reports
of foam -on the systems overtop the self -adhering
FL16048 R6 AE 2017 09 FINAL ER TRI-
underlayment for one particular application. See ER Section
BUILT UNDERLAYMENTS FL16048-R6 odf
5.6.4 for details. 2.), Refer to ER Section 5 for other Limits of
Created by Independent Third Party: Yes
Use.
The State of Florida is an AWEBD emplc
Under Florida law, email addresses are pu
electronic mail to this entity. Instead, conta
Section 455.275(1), Florida Statutes, effectiv
they have one. The emaiis provided may be
supply a personal address, please provide the I
rti Us :: 2601 61air Stone Road Tallahassee R 32399 Phone: 850-487-1824
yl r. Copyright 2007-2013 Stare of Florida :: Privacy Statement :: Accessibility Statement ::. Refund Statement
blic records. If you do not wantyour e-mail address released in response to a public -records request, do not send
ct the office by phone or by traditional mail. If you have any questions, please contact 850.487,1395. 'Pursuant to
e'.Octnber 1, 2012, licensees licensed under Chapter 455, F.S. must provide the Department with an email address if
dsed for official communication with the licensee. However email addresses are public record. If you do not wish to
)epartment with an email address which an be made available to.the public. To determine if you are a licensee under
Chapter 455, F.S., please click here .
Product Approval Accepts:
Credit•
Safe
security AIETRrQs
https://www.floridabuilding.org/prlpr_app_dtl.aspx?param=wGEVXQwtDgtFPmdYiND:.. 1/12/2018
VTRINITYIERD
EVALUATION: REPORT
TRI-BUILT Materials Group, LLC
PO Box_70
Rutherford, NJ 07070
(800) 516-1485
EXTERIOR RESEARCH & DESIGN, LLC.
Certificate ofAuthorization #9503
353 CHRISTIAN STREET, UNIT#13
OXFORD, CT 06478
(203) 262-9245
ation Report A42960.10.12-116
FL16048-R6
Date of Issuance:10/25/2012
Revision 6: 09/25/2017
SCOPE:
This Evaluation Report is issued under Rule L620-3 and the applicable rules and regulations governing the use of
construction materials in the State of Florida! The -documentation submitted has been reviewed by Robert Nieminen,
P.E. for use of the product under the Florida Building Code and Florida Building Code, Residential Volume. The
products described herein have been evaluated for compliance with the 6t" Edition (2017) Florida Building Code
sections noted herein.
DESCRIPTION: TRI-BUILT Roof Underlayments
LABELING: Labeling shall be in accordance
herein.
CONTINUED COMPLIANCE: This Evaluation Rep(
Quality Assurance documentation changes,
this Evaluation Report by the named clier
changes or the referenced Quality Assuranc
Evaluation Report relative to. updated Code
ADVERTISEMENT: The Evaluation Report num
advertising literature. If any portion of the I
INSPECTION: Upon request, a copy of this ent
its distributors and shall be available for insr;
This Evaluation Report consists of pages 1 th
Prepared by:
Robert J.M. Nieminen, P.E.
Florida Registration No. 59166, Florida DC4ANE198
the requirements the Accredited Quality Assurance Agency noted
is valid until such time as the named product(s) changes, the referenced
provisions of the Code that relate to the product change. Acceptance of
constitutes agreement to notify Robert Nieminen, P.E. if the product
documentation changes. Trinity) ERD requires a complete review of this
quirements with each Code Cycle.
?r preceded by the words "Trinity I ERD Evaluated" may be displayed in
duation Report is displayed, then it shall be done in its entirety.
Evaluation Report shall be provided to the user by the manufacturer or
,tion at the job site at the request of the Building Official.
iueh 6.
The facsimile seal appearingsvas authorized by Robert Nieminen,
P.E. on 99/25/2017. This does not serve as an electronically signed
documenL
CERTIFICATION OF INDEPENDENCE:
1. Trinityl ERD does. not have, nor does it intend to acquire or will it acquire, a financial interest in any company manufacturing or
distributing products it evaluates.
2. Trinity I ERD is not owned, operated or controlled by any company manufacturing or distributing products it evaluates.
3. Robert Nieminen, P.E. does not have nor will acquire, a financial interest in any company manufacturing or distributing products for
which the evaluation reports are being issued.
4. Robert Nieminen, P.E. does not have, nor will acquire, a financial interest in any other entity involved in the approval process of the
product.
5. This is a building code. evaluation. Neither Trinity ERD nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any
project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained
specifically for that purpose.
I
�PTRINrrYJERD
ROOFING COMPONENT EVALUATION:
I. SCOPE:
Product Category: Roofing
Sub -Category: Underlayment
Compliance Statement: TRI-BUILT Roof Underlayments; as produced by TRI-BUILT Materials Group, LLC, have
demonstrated compliance with the following sections of the 6th Edition (2017) Florida Building Code through testing
in accordance with the following Standards. Compliance is subject to the Installation Requirements and Limitations /
Conditions of Use set forth herein.
2. STANDARDS:
i
Section Property Standard Year
1504.3.1 Wind Resistance FM 4474 2011
1504.3.1 Wind Uplift UL 1997 2012
1504.6 Accelerated Weathering ASTM G155 2005
1507.2.4 / 1507.1.1,1507.2.9.2 Physical Properties ASTM D1970 2015
1507.3.3 Physical Properties FRSA/TRI April 2012 (04-12) 2012
3. REFERENCES:
EntitV Examination Reference Date
ERD (TST6049) Physical Properties 540540.02.13-1 02/19/2013
ERD (TST6049) Physical Properties S40540.11.13 11/19/2013
ERD (TST6049) ) Physical Properties 540540.03.14 03/26/2014
ERD (TST6049) Physical Properties S44870.04.14-2 04/02/2014
ERD (TST6049) Physical Properties S44870.04.14-3 04/02/2014
ERD (TST6049) Physical Properties S44870.04.14-1 04/10/2014
ERD (TST6049) Physical Properties S44870.04.14-4 04/10/2014
ERD (TST6049) Physical Properties S43530.02.14-1-R1 05/14/2014
ERD (TST6049) Physical Properties $43530.05.14 05/28/2014
ERD (TST6049) Physical Properties 540540.10.14 10/31/2014
ERD (TST6049) Physical Properties SC7645.02.15 02/13/2015
ERD (TST6049) Accelerated Weathering SC8520.04.15 05/27/2015
ERD (TST6049) Wind Resistance SC14045.05.17-R1 06/07/2017
UL, I.I.C. (QUA9625) Quality Control Multiple-Listing'R16814 12/10/2015
UL, LLC. (QUA9625) Quality Control Service Confirmation Exp, 07/18/2020
4. PRODUCT DESCRIPTION:
4.1 Tri-Built Sand-R SA Shingle) Underlayment is a self -adhering, glass -mat reinforced, sand -surfaced, SBS
modified bitumen roof underlayment, with a 36-inch sheet width; meets ASTM D1970.
4.2 Tri-Built S/A HT TU Underlayment is a self -adhering, non -woven polyester fabric surfaced, SBS modified
bitumen roof underlayment;meets ASTM D1970 and FRSA/TRI April 2012.
4.3 Tri-Built Smooth HT S/A Underlayment is a self -adhering, glass -mat reinforced, film -surfaced, SBS
modified bitumen roof underlayment; meets ASTM D1970.
S. LIMITATIONS:
5.1 This is a building code evaluation. Neither Trinity IERD nor Robert Nieminen, P.E. are, in any way, the
Designer of Record for any project on which this'Evaluation Report, or previous versions thereof, is/was
used for permitting or design guidance unless retained specifically for that purpose.
5.2 This Evaluation Report is not for use in FBC HVHZ jurisdictions:
5.3 Fire Classification is not part of this Evaluation Report; refer to current Approved Roofing. Materials
Directory for fire ratings of this product.
Exterior Research and Design, I.I.C. Evaluation Report A42960.10.12-R6
Cei#lcote ofAuthorizatlon #95o3 6' EDITION (2017) FBC NON-HVHZ EVALUATION FL16048-R6
TRI-BUILT Roof Underlayments; (800) 516-1485 Revision 6: 09/25/2017
Page 2 of 6
TRINITY J ERD
5.4 TRI-BUILT Roof Underlayments may be used with any prepared roof cover where the product is
specifically referenced within FBC approval documents. If not listed, a request may be made to the
Authority Having Jurisdiction for approval based on this evaluation combined with supporting data for the
prepared roof covering.
5.5 Allowable Roof Covers:
'
f t .TABLE L ;ROOF COVER_OPTIONS
Underlayment
Asphalt
Shingles
Nail -On Tile
Foam -On Tile
Metal
Wood Shakes
Slate
& Shingles
Tri-Built Sand-R SA Shingle
Underlayment
Yes
No
No
No
Yes
Yes
Tri-Built S/A FIT TU
Yes
Underlayment
Yes
I
Yes
See 5.5.1
Yes
Yes
Yes
EU I f Smooth HTS/A)
---
,_Underlayment �,
f Yes '
I
No
No
y Yes";
Yes
K Yes-.
5.5.1 "Foam -On Tile" is limited to use of the following Approved tile adhesives / underlayment rnmhinntinnc
TABLE 1A:-ALLOWABLE
TILEADHESIVE UNDERLAYMENT COM_ BIN_ ATIONSl
Adhesive
Florida
Product Approval
Underlaymerits
ICP Adhesives Polyset° AH-160.
I
FL6332
Tri-BuiltS/A HT TU Underlayment
DowTlleBondT°-
FL22525
Tri-BuiltS/A HT TU Underlayment
5.6 Allowable Substrates:
5.6.1 Direct -Bond to Deck:
Tri-Built Sand-R SA Shingle .0
Underlayment applied to:
➢ Plywood; ASTM D41 prirr
primed Southern Yellow F
While not required over plywi
recommends priming the dec
TRI-BUILT Materials Group, I
OSB prior to installation of the
5.6.2 Bond -to -Insulation:
Tri-Built Sand-R SA Shingle Ui
Underlayment applied to:
Dens Deck Prime; SECURC.
Tri-Built S/A HT TU Underlayment or Tri-Built Smooth HT S/A
?d plywood; OSB; ASTM D41 primed OSB; Southern Yellow Pine; ASTM D41
ne; ASTM D41 primed structural concrete.
od, OSB or Southern Yellow Pine substrates, TRI-BUILT Materials Group, LLC
: if the final roof cover is not slated for installation within 24 hours. Note:
.0 requires tongue-and_groove board decking be covered with plywood or
self -adhering underlayment.
Tri-Built S/A HT TU Underlayment or Tri-Built Smooth HT S/A
Gypsum -Fiber Roof Board.
For installation under mechanically attached prepared roof coverings, insulation shall be attached per
minimum requirements of the prepared roof covering manufacturer's Product Approval. For installations
under foam -on tile systems '(Tri-Built S/A HT TU Underlayment only), insulation attachment shall be
designed by a qualified design professional and installed based on testing of the insulation/underlayment
system in accordance with FM 4474, Appendix D or TAS 114, Appendix J.
1 Refer to Tile Manufacturer's or Adhesive Manufacturer's Florida Product Approval for Overturning Moment Resistance Performance.
Exterior Research.and Design, LLC. Evaluation Report A42960.10.12-R6
CertTicate of Authorization N9503 6r" EDITION (2017) FBC NON-HVHZ EVALUATION FL16048-R6
TRI-BUILT Roof Underlayments; (800) 516-1485 Revision 5: 09/25/2017
Page 3 of 6
v�
�J'
TRINITY J ERD
5.6.3 Bond to Mechanically Attached Base Laver: `
Tri-Built Sand-R SA Shingle Underlayment, Tri=Built S/A HT TU Underlayment or Tri-Built Smooth HT S/A
Underlayment applied to:
5.6.4
➢ ASTM D226, Type I or II
For installations under mi
minimum codified requin
Underlayment only), base
12).
does not address wind uplift I
the underlayment forms part
underlayment systems that ar
applications. Maximum Des
allowable wind loads, and refl
per FBC 1504.9 has already bE
FBC 1609 for determination of
#1
Maximum Desigl
Deck:
Primer:
Underlayment:
#2
Maximum Desier
Deck:
Primer:
Underlayment:
#3
Maximum Desier
Deck:
Deck Preparation
Primer:
Underlayment:
#4
Maximum Design
Deck:
Base Sheet:
Underlayment;
tally attached prepared roof coverings, base layer shall be attached per
s. For installations under foam -on tile systems (Tri-Built S/A 'HT TU
shall be attached per minimum requirements of FRSA/TRI April 2012 (04-
W11L 3Vstems In roam-Un Tile Applications: FRSA/TRI April 2012 (04-12)
;istance of all underlayment systems beneath foam -on tile systems, where
f the load -path. The following wind uplift limitations apply to direct -deck
not addressed in FRSA/TRI April 2012 (04-12) and are used in foam -on tile
n Pressure is the result of testing for wind load resistance based on
:ts the ultimate passing pressure divided by 2 (the 2 to 1 margin of safety
n applied). Refer to FRSA/TRI April 2012 (04-12), Appendix A, Table 1A or
esign wind pressures.
Min. 15/32-inch plywood to meet project requirements to satisfaction of Authority
Having Jurisdiction.
(Optional) ASTM D41 or RESISTO EXTERIOR PRIMER
Tri-Built S/A II HT TU Underlayment, self -adhered.
Pressure =-67.5 psf:
Structural concrete to meet project requirements to satisfaction of Authority Having
Jurisdiction.
Soprema Elastocol 60oc
Tri-Built S/Ai HT TU Underlayment, self -adhered.
Pressure = -150.0 psf:
Min. 15/32-inch APA-rated BCX plywood (may be installed C-side up) to meet project
requirements to satisfaction. of Authority Having Jurisdiction.
Plywood shall be thoroughly cleaned to remove dust and debris that may inhibit
adhesion. All sheathing fasteners shall be driven flush with the surface. All sharp
splinters and, wood projections shall be removed/sanded.
(Optional) RESISTO EXTERIOR PRIMER
Tri-Built S/A HT TU Underlayment, self -adhered, shall be thoroughly roll using hand
roller and/or weighted roller to ensure there are no voids, and ensure there are no
voids/bridging at side and end -laps:
Min. 19/32-inch plywood to meet project requirements to satisfaction of Authority
Having Jurisdiction. .
Soprema Sopra-G or Modified Sopra-G mechanically attached with nails (FBC 1517.5.1)
and tin caps (FBC 1517.5.2) spaced 6-inch o.c. at the 4-inch laps and 6-inch o.c. in three,
equally spaced rows in the center of the sheet.
Tri-Built S/A HT TU Underlayment; self -adhered.
Exterior Research and Design, I.I.C. Evaluation ReportA42960.10.12-R6
Certificate ofAuthorizotion #9503 6' EDITION (2017) FBC NON-HVHZ EVALUATION FL16048-R6
TRI-BUILT Roof Underlayments; (800) 516-1485 Revision 6: 09/25/2017
Page 4 of 6
I
(-)o
TRINITY I ERD
5.6.4.1 For mechanically attached Base Sheet, the maximum design pressure for the selected assembly shall meet
or exceed that required unde I FRSA/TRI April 2012 (04-12), Appendix A, Table 1A.
Alternatively, the maximum design pressure for the selected assembly shall meet or exceed the Zone 1
design pressure determined in accordance with FBC 1609. In this case, Zones 2 and 3 shall employ an
attachment density designed by a qualified design professional to resist the elevated pressure criteria.
Commonly used methods are ANSI/SPRI WD1, FM Loss Prevention Data Sheet 1-29 and Roofing
Application Standard RAS 117. Assemblies marked with an asterisk* carry the limitations set forth in
Section 2.2.10.1 of FM Loss Prevention Data Sheet 1-29 (January 2016) for Zone 2/3 enhancements.
5.7 Exposure Limitations:
Tri-Built Sand-R SA Shingle Underlayment or Tri-Built Smooth HT S/A Underlayment shall not be left
exposed for longer than 30-days after installation.
Tri-Built S/A HT TU Underlayment shall not be left exposed for longer .than 180-days after installation.
5.8 Tile Slippage Limitations (TAS 103 per FRSA/TR1 April 2012 (04 12)):
When loading roof tiles on the underlayment in direct -deck tile assemblies, the maximum roof slope shall
be as follows. These slope limitations can only be exceeded ,by using battens during loading of the roof
tiles.
TABLE 2. TILE SLIPPAGE.LIMITATIONS FOR DIRECT -DECK TILE INSTALLATIONS ,
Underlayment
Tile Profile
Staging Method
Maximum
Slope
Flat
Max. 10-tile stack
6:12
Lugged
Max.10-tile stack
5:12
Max. 10=tile stack (bottom 2-tile stack
shall be inverted, followed by 81iles high 6:12
on slope, as shown below)
Tri-built S/A HTTU
Underlayment
iLugged
i
r
Exterior Research and Design, LLC. Evaluation Report A42960.10.12-R6
Certificate of Authorization #9s03 6T"EDITION (2017) FBC NON-HVHZ EVALUATION FL16048-R6
TRI-BUILT Roof Underlayments; (800) 516-1485 Revision 6: 09/25/2017
Page 5 of 6
S. INSTALLATION: TRINITY j ERD
6.1 TRI-BUILT Roof Underlayments shall be installed in accordance with TRI-BUILT Materials Group, LLC
published installation requirements subject to the Limitations set forth in Section 5 herein and the
specifics noted below.
6.2 Re -fasten any loose decking panels, and check for protruding nail heads. Sweep the substrate thoroughly
to remove any dust and debris prior to application, and prime the substrate (if applicable).
6.3 Tri-Built Sand-R SA Shingle Underlavment Tri-Built S/A HT TU Underlavment or Tri-Built Smooth HT S/A
Underlavment•
6.3.1 Shall be installed in compliance with the requirements for ASTM D1970 underlayment in FBC Table
1507.1.1 for the type of prepared roof covering to be installed.
6.3.2 Non -Tile applications:
While priming is optional, TRI-BUILT Materials Group, LLC recommends priming the deck if the final roof
cover is not slated for installation within 24 hours.
Apply sheet parallel to the roof edge. Roll out approximately 10 ft of membrane and peel back the first 3
ft of release film.
Adhere the exposed part to the substrate and unroll the remaining membrane as far as possible.
Once the entire length of membrane is in place, peel -off the release film diagonally while holding the
membrane tight. Firmly roll, broom or hand -press the membrane into place to achieve a bond.
Horizontal seams should be minimum 3-inches; configured to shed water. Vertical seams should be 6-
inches and staggered not less than 2-ft from vertical seams in the course below, sealed in accordance with
TRI-BUILT Materials Group, LLC requirements.
When installing at slopes above 8:12, TRI-BUILT Materials Group, LLC recommends back -nailing in the
overlap area at the top of the 'sheet at 12-inch o.c.
For Valleys and Ridges: Cut underlayment into 4 to 6 foot lengths. Peel the release paper and center sheet
over valley or ridge. Drape and press sheet into place, working from the center of the valley or ridge in
each direction. For valleys, apply the sheet starting at the lowest point and work upward.
6.3.3 Tile Applications (Tri-Built S/A! HT TU Underlavment only):
Reference -is made to FRSA/TRI April 2012 (04-12) Installation Manual and Table 1 herein, using the
instructions noted above as a guideline.
For foam -on tile applications, deference is made to Section 5.6.4 herein for wind resistance limitations that
fall outside the scope of FRSA/TRI.April 2012 (04-12).
Tile shall be loaded and staged in a manner that prevents tile slippage and/or damage to the
underlayment. See Table 2 herein, and TRI-BUILT Materials Group, LLC published requirements for the
staging.
7. BUILDING PERMIT REQUIREMENTS:
As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of
this product.
8. MANUFACTURING PLANTS:
Gulfport, MS
9. QUALITY ASSURANCE ENTITY:
UL, LLC —QUA9625; (314) 578-3406; k.chancellor@us.ul.com
- END OF EVALUATION REPORT -
Exterior Research and Design, LLC. Evaluation Report A42960.10.12-R6
Certificate of Authorization #9503 6' EDITION (2017) FBC NON-HVHZ EVALUATION FL16048-R6
TRI-BUILT Roof Underlayments; (800) 516-1485 Revision 6: 09/25/2017
Page 6 of 6