METAL ROOF INSTALLATION INSPECTION WITH STRUCTURAL CERTIFICATION
For: Residence at 6 Enclave yr Port$SSuce,`Fl4483'
TO: St. Lucie County Building Department
Client: Elite Roofing Solutions, Inc. 812 SE Lincoln Ave. Stuart FL. 34994
Permit No. Permit 80011 or a new Snapback Metal Re Roof
♦ 24 Ga. Steel Panels 1" Nail Strip Metal Roof Installation
RECENED
Nov $ 1018
Permittln
St. Lu 9 0epa� "
On Octubrel8, 2018 B & B Engineering Inc. was requested by Elite Roofing Solutions, Inc., a License
Roofing Contractor to certify the proper installation of the New 24Ga. Steel Panels 1 "Nail Strip Metal
Steel Panels.
The new metal Re -Roof was installed over the existing 5/8" CDX plywood attached to the trusses
structure. "To meet 'the required wind loading as per. ASCE 7-10, Exposure C, the existing plywood
shearing was re -nailed to the existing trusses using galvanized steel 8-D ring shank nails at 4" on center
edge and 6" center field All were installed properly as per manufactures recommendations, NOA Products
approvals, 2017 FBC and St, Lucie County Building Department. Consequently to the best of our
knowledge and professional,ability, it is B & B Engineering Inc. opinion that the new 24Ga. Steel Panels
1 "Nail Strip Metal Re -Roof Assembly Installation is structural sound and safe. '
Limitations.
Our professional services have been performed, our findings obtained and our opinions prepared in
accordance with general accepted structural, engineering principles and practices. This company is not
responsible for the conclusions, --opinions or recommendations made by other based on our findings. The
scope of the inspection was intended to evaluate the new24Ga. Steel Panels 1 "Nail Strip Metal Re -Roof
Assembly Installation to assure. its structural integrity. , The opinionsi submitted in this report are based
upon the field inspection on October 20, 2018.
Approved,