Loading...
HomeMy WebLinkAboutMETAL ROOF INSULLATION INSPECTIONLJk_)_t1 B— _B .... Engineering Consultants, Inc. October 22, 20118 ,CANNED By Lueie COUVO 2237 Woods Edge Circle Orlando FL 32817 772 708 7785 - 772 828 2263 omvermudez@hotmail.com METAL ROOF INSTALLATION INSPECTION WITH STRUCTURAL CERTIFICATION For: Residence at 6 Enclave yr Port$SSuce,`Fl4483' TO: St. Lucie County Building Department Client: Elite Roofing Solutions, Inc. 812 SE Lincoln Ave. Stuart FL. 34994 Permit No. Permit 80011 or a new Snapback Metal Re Roof ♦ 24 Ga. Steel Panels 1" Nail Strip Metal Roof Installation RECENED Nov $ 1018 Permittln St. Lu 9 0epa� " On Octubrel8, 2018 B & B Engineering Inc. was requested by Elite Roofing Solutions, Inc., a License Roofing Contractor to certify the proper installation of the New 24Ga. Steel Panels 1 "Nail Strip Metal Steel Panels. The new metal Re -Roof was installed over the existing 5/8" CDX plywood attached to the trusses structure. "To meet 'the required wind loading as per. ASCE 7-10, Exposure C, the existing plywood shearing was re -nailed to the existing trusses using galvanized steel 8-D ring shank nails at 4" on center edge and 6" center field All were installed properly as per manufactures recommendations, NOA Products approvals, 2017 FBC and St, Lucie County Building Department. Consequently to the best of our knowledge and professional,ability, it is B & B Engineering Inc. opinion that the new 24Ga. Steel Panels 1 "Nail Strip Metal Re -Roof Assembly Installation is structural sound and safe. ' Limitations. Our professional services have been performed, our findings obtained and our opinions prepared in accordance with general accepted structural, engineering principles and practices. This company is not responsible for the conclusions, --opinions or recommendations made by other based on our findings. The scope of the inspection was intended to evaluate the new24Ga. Steel Panels 1 "Nail Strip Metal Re -Roof Assembly Installation to assure. its structural integrity. , The opinionsi submitted in this report are based upon the field inspection on October 20, 2018. Approved,