Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT�f��laL •. COUNTY F L O R 1 D A �`✓ i I SCANNED By St Lucie C001V Planning & Development Services Building & Code.; Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172, Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT , 2 - D3E 70B ADDRESS: I �a-Q r PERMIT #. a�.s BUILDER/CONTRACTOR: C. �r PEST CONTROL CONTRACTOR: EVICT -A -BUG TERMITE & PEST CONTROL IN PEST CONTROL LICENSE #: JB175775 on for We, the undersigned, hereby certify that we have ada standards of the Nat otreated the ove nal Pest Control Association. on. subterranean termites in accordance with the s Square feet if area treated: 1d e' Percentage of solution: •05°/° Date of Treatment: _L l� I Footing Y 1st Treatment Re -Treat Driveway 1st Treatment Re -Treat Other 1st Treatment Re -Treat Chemicals used: DOMINION 2L Total gallons used: % Time of Treatment: Slab is' Treatment Re -Treat Pools 1st Treatment Re -Treat PerimpMr for Final Inspection / '� I ure of Exterminator D to Note: There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each /nspectlon or the scheduled Inspection will fail and a re-inspecdOn fee charged. F8arY04.2.6 CertJficate of Protective Treatment for preventlon of termites A weather treatments tcompletedboard shall be provided to receive duplicate Treatment Cert/ficates as each required protects provlding a copy for the person the permit is issued to and another copy for the building permit tiles The Treatment Certlflcate shall provide the product used, ldent/ty of the applicator, time and date of the treatment, site locatlon, area ncentration and number of gallons used, to etblIsh a venflabe reord Of treated, chemical used, percente soil chern cal bar /er method for termite preventlon isaused, final ell nor treatment shall protective treatment be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revisod 7/24/2014