Loading...
HomeMy WebLinkAboutSKIRTING VENTILATIONi r dun®� � A -.- Atlantic Supply FSI aldrti► inches of ventilation per vent panels that add i ventilation per lineal foot average 280 NO ventec 9.8 sq. Inches of ventilsti y top rail design providers 2.5 sq. Ineal foot. Atlanta suPplies p81 1 additional 4.2 sq. Inches of of panel In height. Therefore, an panel will provide an additional n per panel used. M PLE: Typical 14' x 70' Name = 165' lineal feet set at 28' height i Top Flail Vent: 165 lineal feet x 2.50 sq. Inches! per foot = 412.5 sq. inches 124 Pm. 28" vent panel: 124 pcs, x 9.8 sq. inches per PC,' = Total Ventilation sq. Inches Total Venblation sq. ft. 1 .2 M, inches 1627.7 sq, fthes 1627.7 sq, inches 1144 — 11.3 .sq. ft.-of ventilation STEP A: MWH BACK RAIL 1. Determine a plea for mounting. Platy botwm edge of back rag below bottom edge of the home. This locadon must offer code support for attaching and wit d load pressure for panels and ra'tia. 2. Keep the back rail swot sad lewl Soap a chalk ltncaround the home to guide the top edge of the back tad. 3. Corot pxevving or nailiog method for brck rah: Startoa the badc aide of the home. Poaidoa serrjws ox mils in the waves of the doe: Scmw/wd to allow Er a clearance -of 1/16' kom the back rail sndace. Note: avoid tightly srrtwing or ne&g back fail. A 1/16" cleswce d[aws for nomad expansion and contraction with temperature dmr- Place a screw or nail in cW4 outer got 4. provide a 1/2" gap between each back rail section for nOMd thermal expansion. To install around comer, rda to Step E.-. PASO A: IOTALB EL RIBL DB AMYQ 1. Detamine un Wpr Para d Mona]& Cologne d boide inferior &L riot de alioyo junto abajo del borde infest de is Curse. MU ubieacidn debe ofreca un apoyu £acne qua pesrnlw' elavar bs rieTa y soportar h predda pot togas de Aento en lo$ p?IMCI. 2. 1Vleate V derecho d rid de sogorte y a Hive. Mu+que una kne& con at cordd entizado ahodedor de 12 Casa pat► guiaf el boide superior del rid de apoya 3. Mdtodo Co=m paa claw el rid de apoyo: Cos ic= en It Farce poswnor de It rue. Cologne los claws en el Centro de Is mom pars chvos.lowudaualos cbtvosydeje wra holgura de Z116' dude h stgw4cie del tiel de apoya Now: No clove miry Ajuatadamente el eel de spoyo. Una holguta de 1/16" con la; cabez'z dd ckm rMid'i el esP260 tuff =te Para absorber " ezpansldn y contrzed6n normaks res duntts de los can►bio's de tcmperatosa. Coloquc IN clavos en ranuras alw as. 4. Dqe un eapado de IM eatm cads saeadn de rid de VT. Pus tenet en cuent a Is aq=slm *mka normal. i Para instalar d prodvcto alrodcdor de be esquirtas,loonvulte el Paso l:. "'UP s0 o MO UW BOTTOM RAIL 1. Ground prcgaradOo, prepars the ground so that it is smooth, fro Of looms dumps, clods or protruding obstacles. Guard against uneven settling of newly anvated vMd by mounting the bottom rail on treated (T X2") hrmbm 2. Mark the ground location dira * below the outside, bottom edge. of the home. Use a level or plumb bob to dew dris location at each corner: 3. Snap a chalk line Of stretch s utylon string between each Corner to 0& the bottom rail. 4. Position the botcrnm Rail with the back kg toward the inside of the chalk hoe perimeter 5. Dave ground sp'dceaevery 19 ioches 7W*acts ofholes _ in the bottom tad. They are located inside the chatmA and on the back leg, Grovad spikes may be driven in either hole at intervals of 19 inches- nark. You also tr. 6. IneWladon on eomv Use a 31e masonry my &M a hole for a 3/16" may, &=w as plastic eieeve- (19i1 and screw materials are avadvibk at most hwwue stores.) To jot & around comer, tefa to Step E. PASO B: MOKWB DEL RIEL INFERIOR 1. Popracidu del Paso de tier. Prepare el * de manta qua eati uniforme, sin rotas suehas, tarronea os obs&*s que sobmam an del play pro* 1, instaladda contra el wentuaiento no unUb me enpisos w1in excavadoa, montarrdo d CW Wukr CO uns On do tnadem txabtda (2" s 21. 2. Marque 1< ubk1d6n en d Pico di:ectamcnee abajo dd borde inferiot OOM de la Casa. Use un nivd o una pioimada Para deteradm esta.ubkickin en cada csgdm, 3; MWP Una Itrtea Con rordd enfMdo o Colo gve uoa were& de 006n entre cad& esgt m Para guitar et iel de apoyo. 4. ColoqueduddesppconlepsndempaldohiLdadintexiordd pedmetro marcado pot is Linea de eiza. 5. Intmdusca lw ckm gcvesoe an d Oso a cWt 19 pulgadas. En d nel inferior se propordonsn dos conjuntos de agujems. &too se encuentmn deotro del canal, err la pata de soporte. Los clavos gruesus para el piso se pueden clavar a travels de cualquicra de los agujecos a una distaaeia de 19 pulgadas entre si. - . 6 Instalac'ida en pism de concreto. Use = claw de 3/4" pity - mroposterfa. Ad rnismo se puede taladrar un aguicro pars. pn rornillo de 3/16H tipo Molly colt arch pldstica. (Los matcdales' de clavos y los tomillos estdn disponibles en la mayorfa de ;Jas - ferreterfas). .. Para hutdar el producto dWedor do Im esquiras, consulte el pas I E. I STE-P C: PANEL INSTALLATION I. Beginning 2e away from the Iowesr corner of the home; measure ;ham the ground up to 1-W above the bottom edge of the back rail. (If the temperature is below 40%with frozen ground, measure to 3" above the back raj edge.) Z. Measurements on dapiagggtound should be taken May 16" (width of panel). 3. Cut the bottom of each panel to angle with, the gro=& Each cue panel section should align 90' to the bottom edge of the home. Use aviation snips or a power saw (with a fine toothed saw blade 6mcd barkrwards) for cutting: i 4. Punch lock tabs eve► a &* the top and bottom edge of cut panel sections (or outside portion. of each. panel. face roar 13" WOW) -A, Malin Fu (SL-8) Snap Lock ich tool is recommended. Consult your skirting supplier for obtaining this tool. Tabs are to be positioned outward to catch on the hooked edge of the rails. . S. Interlock panels and insw into the bottom rail. Begin with the first panel inserted into the bottom. rail. Locktabs should snap past the hooked edge -of the bottom rail:Imert next paaetaectiod into '- the interlock hooks along the vertical edge of the panels. Sat each - panel sceureiy into the bottom raii. Repeat interlocking panels". ; forming about a 12-foot section. Resume panel cut and intedock method. To install around corner, refer to Step L. PA Cn d"i iNSTALAWN DE LOS PANELES 1. Comettzando a 2e de la esquina inferior mils baja do is casa, mida _ _desde la supuliicie del pim halm I.W. aaiba del horde inferior de} riei de apo) ' (Si la tomperatura ambiente durante la iint2laci6n es inferior a los 407 y elpiso esti congelado, mida hasty 3" arriba dd borne del riel de apop). . 2. Las mediciootes en phos con dest&e! deben hacerse a cads 16° (ancho dei panel). 3. Corte Is pane inferior de Cady panel en dngulo eegn el dcadwd del piss Cada secd6n de panel cortado debe estar a escuadm (9(') con of horde inferior de la can. Use tijeras de hoja[atem o una sierra eldctirica (coy una hop de oorfo de dknte fuio aolocada 21 revrss) PM oortar los Paneles. 4. Perfore lay lengtietas de cierre cads 4°alp larp del bottle superior e inferior de lao secdonts de paneles conados. Se recomienda el use de una punzonadom de maw M*o (SL-8) Snap Lock punch. Cotisulte con su proveedor de cenefas sobro c6mo obtener oft herramienm. Las leMetm deben colocatse ha& afuem a fin da power eugaeclm el borde de gancbo de los rieles. S. Engaache los panelcs c inauddmalos en el del infrior. Comienee con el primer panel inauclucido en el del inferior. Las leng,etas de ciem deben engancharse hasta mtis A del borde con gaucho del riel de apoyo. Introduzca la siguiente secci6n de panel en los ganchos de enclawniento a to largo del borde vertical de los pantiles. Asiente cad& panel firmementa en el del inferior. Replt� el caclavamiento de 105 pantiles hasty format una secci6n de apadrna4mente 12 pies. Reanude el eorte de los panelcs y el rrretndo de enckavarn ieuto. Para instalar el producan en las esquinas, consulte el paso E. STEP D: INTERLOCK FRONT RAIL WITH BACK RAIL 1. Start swapping one end of the front top rail into the back top- rail; Creating -the interlock. Push the front top rail] upward, its entire length until the front top rail cornpletely interlocked with the back rail. 2. Overlap 1" each top rail section. To install around corner, tefer to Step E. i PASO D: ENCLAVAMIEM DEL RIEL FRONTAL CON EL RIEL DE APOYO 1. Comience engaachando un edremo del riel frontalsuperior en el rici superior de apoyo, pats format el mecanismo de enclavamiento. Empuje el riel superior de apor hacia. arriba en toda su longitud hasta que el riel frontal superior este completaments enganchado en el riel de spoyo. Z. Traslapo I" calla seed6A del riel superior - Pam installu el producto ea Ins esquinas, comulte el peso E. 1 P E: CORNER INSTALLATION 1. Top back rail — Make a V vertical slit from the top. Top interlock hook should be completely cut through. Notch 45' on bottom curved leg. 2. Bottom rail — Notch the back portion with snips, as illustrated. Bend around a corner and attach to the ground. 3. Panels — Cut panel to proper height. Detemoine point of corner bend; bend over it table edge, forming a wriform a4e. 4. Top fmat rail — Notch at both the top and bottom books of the fimnt rail, as Mustrated. Bend around the corner and .dt into the interlock with the top back rail Refer to Step D. POUR PMNOTCHED 70P FRONT RAILS ARE INCLUD91D IN TRIM PAKO PAWO IMSTALACi[IN DEL PRODLICTO EN LAS ESClUINAS 1. RW superior de apop — Haga un Corte vertical de 1" desde laparte superior. El gaucho superior de enclavamiento debe cortarse completameate. HW una muesca a 45' en la pate crww& inferior. 2. Riel inferior — Corte la porcibn posterior coy diem de hojalatero- segdn- se- muestra-en la Austracidn, Ddblelo alrededor de una esquiwa y clavelo al piso. 3. Paneles — Corte el panel a la altura apropiada. Determine el panto de dobles: doble el panel sobrc el borde de una mesa, Para format uo drrgalo recto. 4. Riel &ooatel superior— Corte log 9111609 superior a ioferim del riel frontal, se& se Bustra en la *a, We la pieza alrededor de la esquina y enonchda en el endavamiento con el riel superior de apoyo. Consaite el Paso D. .- EN EL CONJUN70 TRIM PAK SE INCLUYEN CUATRO RIFLES SUPERIORES FRONTALES YA COR11ADOS, nVrh_J tnara lumenr rnr r nn n d4r+n ftnn r .....�•.�....... �... ......• ....,... —.