HomeMy WebLinkAboutSKIRTING VENTILATIONi
r
dun®� �
A
-.-
Atlantic Supply FSI aldrti►
inches of ventilation per
vent panels that add i
ventilation per lineal foot
average 280 NO ventec
9.8 sq. Inches of ventilsti
y top rail design providers 2.5 sq.
Ineal foot. Atlanta suPplies p81
1 additional 4.2 sq. Inches of
of panel In height. Therefore, an
panel will provide an additional
n per panel used.
M PLE: Typical 14' x 70' Name = 165' lineal feet
set at 28' height
i
Top Flail Vent:
165 lineal feet x 2.50 sq. Inches! per foot = 412.5 sq. inches
124 Pm. 28" vent panel:
124 pcs, x 9.8 sq. inches per PC,' =
Total Ventilation sq. Inches
Total Venblation sq. ft.
1 .2 M, inches
1627.7 sq, fthes
1627.7 sq, inches 1144 —
11.3 .sq. ft.-of ventilation
STEP A:
MWH BACK RAIL
1. Determine a plea for mounting. Platy botwm edge of back rag
below bottom edge of the home. This locadon must offer code
support for attaching and wit d load pressure for panels and ra'tia.
2. Keep the back rail swot sad lewl Soap a chalk ltncaround the
home to guide the top edge of the back tad.
3. Corot pxevving or nailiog method for brck rah: Startoa the badc
aide of the home. Poaidoa serrjws ox mils in the waves of the doe:
Scmw/wd to allow Er a clearance -of 1/16' kom the back rail
sndace. Note: avoid tightly srrtwing or ne&g back fail. A 1/16"
cleswce d[aws for nomad expansion and contraction with
temperature dmr- Place a screw or nail in cW4 outer got
4. provide a 1/2" gap between each back rail section for nOMd
thermal expansion.
To install around comer, rda to Step E.-.
PASO A:
IOTALB EL RIBL DB AMYQ
1. Detamine un Wpr Para d Mona]& Cologne d boide inferior &L
riot de alioyo junto abajo del borde infest de is Curse. MU
ubieacidn debe ofreca un apoyu £acne qua pesrnlw' elavar bs rieTa
y soportar h predda pot togas de Aento en lo$ p?IMCI.
2. 1Vleate V derecho d rid de sogorte y a Hive. Mu+que una kne&
con at cordd entizado ahodedor de 12 Casa pat► guiaf el boide
superior del rid de apoya
3. Mdtodo Co=m paa claw el rid de apoyo: Cos ic= en It Farce
poswnor de It rue. Cologne los claws en el Centro de Is mom
pars chvos.lowudaualos cbtvosydeje wra holgura de Z116' dude
h stgw4cie del tiel de apoya Now: No clove miry Ajuatadamente
el eel de spoyo. Una holguta de 1/16" con la; cabez'z dd ckm
rMid'i el esP260 tuff =te Para absorber " ezpansldn y
contrzed6n normaks res duntts de los can►bio's de tcmperatosa.
Coloquc IN clavos en ranuras alw as.
4. Dqe un eapado de IM eatm cads saeadn de rid de VT. Pus
tenet en cuent a Is aq=slm *mka normal. i
Para instalar d prodvcto alrodcdor de be esquirtas,loonvulte el Paso l:.
"'UP s0
o
MO UW BOTTOM RAIL
1. Ground prcgaradOo, prepars the ground so that it is smooth, fro
Of looms dumps, clods or protruding obstacles. Guard against
uneven settling of newly anvated vMd by mounting the
bottom rail on treated (T X2") hrmbm
2. Mark the ground location dira * below the outside, bottom edge.
of the home. Use a level or plumb bob to dew dris location
at each corner:
3. Snap a chalk line Of stretch s utylon string between each Corner to
0& the bottom rail.
4. Position the botcrnm Rail with the back kg toward the inside of the
chalk hoe perimeter 5. Dave ground sp'dceaevery 19 ioches 7W*acts ofholes _ in the bottom tad. They are located inside the chatmA and on the
back leg, Grovad spikes may be driven in either hole at intervals of
19 inches- nark. You also
tr.
6. IneWladon on eomv Use a 31e masonry my
&M a hole for a 3/16" may, &=w as plastic eieeve- (19i1 and
screw materials are avadvibk at most hwwue stores.)
To jot & around comer, tefa to Step E.
PASO B:
MOKWB DEL RIEL INFERIOR
1. Popracidu del Paso de tier. Prepare el * de manta qua eati
uniforme, sin rotas suehas, tarronea os obs&*s que sobmam an
del play pro* 1, instaladda contra el wentuaiento no unUb me
enpisos w1in excavadoa, montarrdo d CW Wukr CO uns On do
tnadem txabtda (2" s 21.
2. Marque 1< ubk1d6n en d Pico di:ectamcnee abajo dd borde
inferiot OOM de la Casa. Use un nivd o una pioimada Para
deteradm esta.ubkickin en cada csgdm,
3; MWP Una Itrtea Con rordd enfMdo o Colo
gve uoa were& de
006n entre cad& esgt m Para guitar et iel de apoyo.
4. ColoqueduddesppconlepsndempaldohiLdadintexiordd
pedmetro marcado pot is Linea de eiza.
5. Intmdusca lw ckm gcvesoe an d Oso a cWt 19 pulgadas. En d
nel inferior se propordonsn dos conjuntos de agujems. &too se
encuentmn deotro del canal, err la pata de soporte. Los clavos
gruesus para el piso se pueden clavar a travels de cualquicra de los
agujecos a una distaaeia de 19 pulgadas entre si.
- . 6 Instalac'ida en pism de concreto. Use = claw de 3/4" pity -
mroposterfa. Ad rnismo se puede taladrar un aguicro pars. pn
rornillo de 3/16H tipo Molly colt arch pldstica. (Los matcdales' de
clavos y los tomillos estdn disponibles en la mayorfa de ;Jas
- ferreterfas). ..
Para hutdar el producto dWedor do Im esquiras, consulte el pas I E.
I
STE-P C:
PANEL INSTALLATION
I. Beginning 2e away from the Iowesr corner of the home; measure
;ham the ground up to 1-W above the bottom edge of the back
rail. (If the temperature is below 40%with frozen ground, measure
to 3" above the back raj edge.)
Z. Measurements on dapiagggtound should be taken May 16" (width
of panel).
3. Cut the bottom of each panel to angle with, the gro=& Each cue
panel section should align 90' to the bottom edge of the home. Use
aviation snips or a power saw (with a fine toothed saw blade 6mcd
barkrwards) for cutting: i
4. Punch lock tabs eve► a &* the top and bottom edge of cut
panel sections (or outside portion. of each. panel. face roar 13"
WOW) -A, Malin Fu (SL-8) Snap Lock ich tool is
recommended. Consult your skirting supplier for obtaining this
tool. Tabs are to be positioned outward to catch on the hooked
edge of the rails. .
S. Interlock panels and insw into the bottom rail. Begin with the
first panel inserted into the bottom. rail. Locktabs should snap past
the hooked edge -of the bottom rail:Imert next paaetaectiod into '-
the interlock hooks along the vertical edge of the panels. Sat each -
panel sceureiy into the bottom raii. Repeat interlocking panels". ;
forming about a 12-foot section. Resume panel cut and intedock
method.
To install around corner, refer to Step L. PA Cn d"i
iNSTALAWN DE LOS PANELES
1. Comettzando a 2e de la esquina inferior mils baja do is casa, mida
_ _desde la supuliicie del pim halm I.W. aaiba del horde inferior de}
riei de apo) ' (Si la tomperatura ambiente durante la iint2laci6n es
inferior a los 407 y elpiso esti congelado, mida hasty 3" arriba dd
borne del riel de apop). .
2. Las mediciootes en phos con dest&e! deben hacerse a cads 16°
(ancho dei panel).
3. Corte Is pane inferior de Cady panel en dngulo eegn el dcadwd del
piss Cada secd6n de panel cortado debe estar a escuadm (9(') con
of horde inferior de la can. Use tijeras de hoja[atem o una sierra
eldctirica (coy una hop de oorfo de dknte fuio aolocada 21 revrss)
PM oortar los Paneles.
4. Perfore lay lengtietas de cierre cads 4°alp larp del bottle superior
e inferior de lao secdonts de paneles conados. Se recomienda el use
de una punzonadom de maw M*o (SL-8) Snap Lock punch.
Cotisulte con su proveedor de cenefas sobro c6mo obtener oft
herramienm. Las leMetm deben colocatse ha& afuem a fin da
power eugaeclm el borde de gancbo de los rieles.
S. Engaache los panelcs c inauddmalos en el del infrior.
Comienee con el primer panel inauclucido en el del
inferior. Las leng,etas de ciem deben engancharse hasta
mtis A del borde con gaucho del riel de apoyo. Introduzca
la siguiente secci6n de panel en los ganchos de
enclawniento a to largo del borde vertical de los pantiles.
Asiente cad& panel firmementa en el del inferior. Replt� el
caclavamiento de 105 pantiles hasty format una secci6n de
apadrna4mente 12 pies. Reanude el eorte de los panelcs y
el rrretndo de enckavarn ieuto.
Para instalar el producan en las esquinas, consulte el paso E.
STEP D:
INTERLOCK FRONT RAIL
WITH BACK RAIL
1. Start swapping one end of the front top rail into the back
top- rail; Creating -the interlock. Push the front top rail]
upward, its entire length until the front top rail
cornpletely interlocked with the back rail.
2. Overlap 1" each top rail section.
To install around corner, tefer to Step E.
i
PASO D:
ENCLAVAMIEM DEL RIEL
FRONTAL CON EL RIEL DE APOYO
1. Comience engaachando un edremo del riel frontalsuperior
en el rici superior de apoyo, pats format el mecanismo de
enclavamiento. Empuje el riel superior de apor hacia.
arriba en toda su longitud hasta que el riel frontal superior
este completaments enganchado en el riel de spoyo.
Z. Traslapo I" calla seed6A del riel superior -
Pam installu el producto ea Ins esquinas, comulte el peso E.
1
P E:
CORNER INSTALLATION
1. Top back rail — Make a V vertical slit from the top. Top
interlock hook should be completely cut through. Notch
45' on bottom curved leg.
2. Bottom rail — Notch the back portion with snips, as
illustrated. Bend around a corner and attach to the ground.
3. Panels — Cut panel to proper height. Detemoine point of
corner bend; bend over it table edge, forming a wriform
a4e.
4. Top fmat rail — Notch at both the top and bottom books of
the fimnt rail, as Mustrated. Bend around the corner and .dt
into the interlock with the top back rail Refer to Step D.
POUR PMNOTCHED 70P FRONT
RAILS ARE INCLUD91D IN TRIM PAKO
PAWO
IMSTALACi[IN DEL PRODLICTO
EN LAS ESClUINAS
1. RW superior de apop — Haga un Corte vertical de 1" desde
laparte superior. El gaucho superior de enclavamiento debe
cortarse completameate. HW una muesca a 45' en la pate
crww& inferior.
2. Riel inferior — Corte la porcibn posterior coy diem de
hojalatero- segdn- se- muestra-en la Austracidn, Ddblelo
alrededor de una esquiwa y clavelo al piso.
3. Paneles — Corte el panel a la altura apropiada. Determine el
panto de dobles: doble el panel sobrc el borde de una mesa,
Para format uo drrgalo recto.
4. Riel &ooatel superior— Corte log 9111609 superior a ioferim
del riel frontal, se& se Bustra en la *a, We la pieza
alrededor de la esquina y enonchda en el endavamiento
con el riel superior de apoyo.
Consaite el Paso D. .-
EN EL CONJUN70 TRIM PAK SE
INCLUYEN CUATRO RIFLES
SUPERIORES FRONTALES YA
COR11ADOS,
nVrh_J tnara lumenr rnr r nn n d4r+n ftnn r .....�•.�....... �... ......• ....,... —.