Loading...
HomeMy WebLinkAboutENERGY EFFICIENCY CODEFORM R405-2017 WANN ED rty RESIDENTIAL ENERGY CO ATION CODE DOCUMENTATION CHECKLIST Florida Department of Business and Professional Regulation Simulated Performance) Alternative (Performance) Method Applications for compliance with the 2017 Florida Building Code, Energy Conservation via the residential RECEIVED Simulated Performance method shall include: MAR 1.9 2011 ❑ This Checklist Permitting Dv. St. Lucle COUMVent ❑ A FORM 405 report that documents that the Proposed Design complies with Section R405.3 of the Florida Energy Code. This form shall include a summary page indicating home address, a -ratio and the pass or fail status along with summary areas and types ofcomponents, whether the home was simulated as a worst -case orientation, name and version of the compliance software tool, name of individual completing the compliance report (one page). ❑ An input summary checklist that can be used ,for field verification (usually 4 pages/may be greater). ❑ Energy Performance Level (EPL) Display Card (one page) I ❑ HVAC system sizing and selection based on CCA Manual S or per exceptions provided in Section R403.7 ❑ Mandatory Requirements (five pages) Required prior to CO for the Performance method: ❑ Air Barrier and Insulation Inspection Component Criteria checklist (Table 402.4.1.1 - one page) ❑ A completed Form 2017 Envelope Leakage Test Report (usually one page). Section R402.4 or R402.4.1.2 exceptions may apply. ❑ If FORM R405 duct leakage type indicates anything other than "default leakage" then a completed FORM R405 Duct Leakage Test Report (usually one page). owlOILE COPY 2020-Sep-09 14:14:50 Wri fitaoft�' Right-Suite@Universal201919.0.20 RSU29066 Right -Energy® Florida 2017 Section405.4.1 Compliant Software Page , atjj�:' +mow ...cuments\Wrightsoft HVAC\TBD Wind Trail, PSL.rup - Calc = MJS Front Door faces: N FORM R405-2017 FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Business and Profell sional Regulation - Residential Performance Method Project Name: Basile Residence Builder Name: PSL Prop Street: TBD Wind Trail Permit Office: City, State, Zip: Fort Pierce, FL 34981 Permit Number: Owner: Basile Residence Jurisdiction: St. Lucie Design Location: FL, St Lucie Co Intl County: St. Lucie (Florida Climate Zone 2) 1. New construction or existing New (From Plans) 9. Wall types (1200 ft2) t Insulation (R) Area (ft2) 2. Single family or multiple family Single -Family a. Blk Wall, Stucco Ext, R-4.1 Ext 4.1 1200.00 b. N/A 3. Number of units, if multiple family 1 i c. NIA 4. Number of bedrooms 3 d. N/A 10. Ceiling types (1303 ft2) Insulation (R) Area (ft2) 5. Is this a worst case? Yes a. Attic, Shngls, R-30 Cell Ins, 1/ 30.0 1302.50 6. Conditioned floor area above grade (W) 1302.50 b. N/A Conditioned floor area below grade (ft2) 0 c. N/A 7. Windows (150 ft2) Description Area (ft2) 11. Ducts R Area (ft2) a.Sup: House Attic, Ret: House Attic, AH: House Attic 6.0 271.42 a. U-Factor: Dbl Impact, 0.580 109.20 b. SHGC: 0.24 b. U-Factor: Dbl Impact, 0.650 40.80 12. Cooling systems kBtu/hr Efficiency SHGC: 0.21 a.Split air conditioner 28.0 SEER: 15.5 c. U-Factor: b• SHGC: 13. Heating systems kBtu/hr Efficiency d. U-Factor: a.Electric strip 19.2 AFUE: 100.0 SHGC: b• Area Weighted Average Overhang Depth: 2.352 ft 14. Hot water systems Area Weighted Average SHGC: 0.232 a.Electric conventional (40 gal) Cap: 40 gal EF: 0.96 8. Floor types (1302.50 ft2) Insulation (R) Area (ft2) b.Conservation features a. On Grade Depth, Tile Fir Fnsh 0.0 1302.50 (None) b. N/A c. N/A 15. Credits None Glass/Floor area: 0.115 Total Proposed Modified Loads: 43.75 PASS Total Baseline Loads: 45.10 I hereby certify that the plans and specifications covered by Review of the plans and specifications this calculation are in compliance with the Florida Energy covered b this calculation indicates y ti4 .•��..A �'�., ' Code. compliance with the Florida Energy . G%��Q�-� � Code. Before construction is completed, p,:` f' +++�t• "`� ` �'.- PREPARED BY: this building will be inspected for 5- ,�ti 9/9/2020 compliance with Section 553.908 �* DATE: Florida Statutes. I hereby certify that this buildinXd'e , is incompliance with the Florida En OWNER/AGENT BUILDING OFFICIAL: DATE: DATE: - Compliance requires certification by the air handier unit manufacturer that the air handier enclosure qualifies as certified factory -sealed in accordance with R403.3.2.1. - Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an envelope leakage test report with envelope leakage no greater than 7.0 ACH50 (R402.4.1.2). FILE CVr 2020-Sep-09 14:14:50 Right -Suite® universal 2019 19.0.20 RSU29066 Right -Energy® Florida2017 Section405.4.1 Compliant Software Pa ...cuments\Wrightsoft HVAC\TBD Wind Trail, PSL.rup Calc = MJ8 Front Door faces: N Page 2 FORM R405-2017 Building Input Summary Report PROJECT Title: Basile Residence Bedrooms: 3 Address type: Street address Building Type: FLAsBuilt Bathrooms: 1 Lot#: Owner: Basile Residence Conditioned Area: 1303 Block/Subdivision: # of Units: 1 Total Stories: 1 Platbook: Builder Name: PSL Prop Worst Case: Yes Street: TBD Wind Trail Permit Office: Rotate An le: 0 County: St. Lucie Jurisdiction: St. Lucie Cross Ventilation: No City, State, Zip: Fort Pierce, FL 34981 Family Type: Single -Family Whole House Fan: No New/Existing: New (From Plans) Terrain: Ocean/Lake Year Construct: Shielding: Suburban Comment: CLIMATE IECC Design Temp Int Design Temp Heating Design Daily Temp r' Design Location TMY Site Zone 97.5 % 2.5 % Winter Summer Degree Days Moisture Range FL, St Lucie Cc Intl FL -Fort -Pierce 2 41 90 70 75 486 57 Low BLOCKS # Name Area Volume 1 House 1302.50 ft2 10420.00 fV SPACES # Area Volume Kitchen Occupants Bedrooms Infil ID Finished Cooled Heated 1 Bed 3 153.25 ft2 1226.00 f? No 0 1 1 Yes Yes Yes 2 Bed 2 154.00 ft2 1232.00 f? No 0 1 1 Yes Yes Yes 3 Utility 48.00 ft2 384.00 ft3 No 0 0 1 Yes Yes Yes 4 Clst 6.25 ft2 50.00 ft3 No 0 0 1 Yes Yes Yes 5 6 Bath 60.50 ft2 Master Bed 226.25 ft2 484.00 ft3 No 0 1810.00 ft3 No 0 0 1 1 1 Yes Yes Yes Yes Yes Yes 7 Great Room 237.75 ft2 1902.00 ft3 No 2 0 1 Yes Yes Yes 8 Wardrobe 30.00 ft2 240.00 ft3 No 0 0 1 Yes Yes Yes 9 Master Bath 71.50 ft2 572.00 ft3 No 0 0 1 Yes Yes Yes 10 Kitchen 240.50 ft2 1924.00 f? Yes 2 0 1 Yes Yes Yes 11 Hall 74.50 ft2 596.00 fN No 0 0 1 Yes Yes Yes FLOORS (Total Exposed Area = 1303 sq.ft.) f # Floor Type Space Perimeter R-Value Area Ll-Factor Tile Wood Carpet 1 On Grade Depth, Tile Fir Fnsh Bed 3 26 ft 0 153.25 ft2 0.989 1.0 0 0 2 On Grade Depth, Tile Flr Fnsh Bed 2 20 ft 0 154.00 ft2 0.989 1.0 0 0 3 On Grade Depth, Tile Flr Fnsh Utility 9 ft 0 48.00 ft2 0.989 1.0 0 0 4 On Grade Depth, Tile Flr Fnsh Clst 0 ft 0 6.25 ftz 0.989 1.0 0 0 5 On Grade Depth, Tile Fir Fnsh Bath 1 6 ft 0 60.50 ft2 0.989 1.0 0 0 6 On Grade Depth, Tile Fir Fnsh Master Bed 30 ft 0 226.25 ft2 0.989 1.0 0 0 7 On Grade Depth, Tile Fir Fnsh Great Room 23 ft 0 237.75 ft2 0.989 1.0 0 0 8 On Grade Depth, Tile Fir Fnsh Wardrobe 0 ft 0 30.00 f? 0.989 1.0 0 0 9 On Grade Depth, Tile Fir Fnsh Master Bath 7 ft 0 71.50 ft2 0.989 1.0 0 0 10 On Grade Depth, Tile Fir Fnsh Kitcheh 32 ft 0 240.50 ft2 0.989 1.0 0 0 11 On Grade Depth, Tile Fir Fnsh Hall 0 ft 0 74.50 ft2 0.989 1.0 0 0 ROOF Roof Gable Roof Solar SA Emitt Emitt Deck Pitch f # Type Materials Area Area Color Absor. Tested Tested Insul. (deg) 1 Hip RoofAsph 1456 ft2 Medium 0.75 No 0.90 No 0 27 ATTIC # Type Ventilation Vent Ratio 1 in Area RBS IRCC 1 Full attic Vented 300 1302.50ft2 N N 2020-Sep-09 14:14:50 WrightSoftO Rig ht-Suite®Universal201919.0.20 RSU29066 Right -Energy® Florida2017 Section405.4.1 Compliant Software Page ...cuments\Wrightsoft HVAC\TBD Wind Trail, PSL.rup Calc = MJ8 Front Door faces: N FORM R4n5-217117 CEILING (Total Exposed Area = 1303 sq.ft.) # Ceiling Type Space R-Value U-Factor Area Framing Fraction Truss Type 1 Attic, Shngls, R-30 Cell Ins, 1/2" G Bed 3 i 30 0.034 153.25 ft2 0.10 Wood 2 Attic, Shngls, R-30 Ceil Ins, 1/2" G Bed 2 30 0.034 154.00 ft2 0.10 Wood 3 Attic, Shngls, R-30 Cell Ins, 1/2" G Utility 30 0.034 48.00 ft2 0.10 Wood 4 Attic, Shngls, R-30 Ceil Ins, 1/2" G Clst 30 0.034 6.25 ft2 0.10 Wood 5 Attic, Shngls, R-30 Cell Ins, 1/2" G Bath 30 0.034 60.50 ft2 0.10 Wood 6 Attic, Shngls, R-30 Cell Ins, 1/2" G Master Bed 30 0.034 226.25 ft2 0.10 Wood 7 Attic, Shngls, R-30 Cell Ins, 1/2" G Great Room 30 0.034 237.75 ft2 0.10 Wood 8 Attic, Shngls, R-30 Cell Ins, 1/2" G Wardrobe 30 0.034 30.00 ft2 0.10 Wood 9 Attic, Shngls, R-30 Cell Ins, 1/2" G Master Bath 30 0.034 71.50 ft2 0.10 Wood 10 Attic, Shngls, R-30 Cell Ins, 1/2" G Kitchen 30 0.034 240.50 ft2 0.10 Wood 11 Attic, Shngls, R-30 Cell Ins, 1/2" G Hall 30 0.034 74.50 ft2 0.10 Wood WALLS (Total Exposed Area = 1200 sq.ft.) Adjacent Cavity ' Width Height Sheathing U- Frm. Solar Below Ile # Ornt To Wall Type Space R-Value; Ft In Ft In Area R-Value Factor Frac. Absor. Grade% 1 NE Exterior Blk Wall, Stucco Bed 3 0 111 0 8 0 88.0 ft2 4 0.109 0.22 0.60 0 2 SE Exterior Blk Wall, Stucco Bed 3 0 1 14 6 8 0 116.0 ft2 4 0.109 0.22 0.60 0 3 NE Exterior Blk Wall, Stucco Bed 2 0 11 0 8 0 88.0 ft2 4 0.109 0.22 0.60 0 4 NW Exterior Blk Wall, Stucco Bed 2 0 9 0 8 0 72.0 ft2 4 0.109 0.22 0.60 0 5 NE Exterior Blk Wall, Stucco Utility 0 6 0 8 0 48.0 ft2 4 0.109 0.22 0.60 0 6 NW Exterior Blk Wall, Stucco Utility 0 2 6 8 0 20.0 ft2 4 0.109 0.22 0.60 0 7 SE Exterior Blk Wall, Stucco Bath 0 5 6 8 0 44.0 ft2 4 0.109 0.22 0.60 0 8 SE Exterior Blk Wall, Stucco Master Bed 0 16 6 8 0 132.0 ft2 4 0.109 0.22 0.60 0 9 SW Exterior Blk Wall, Stucco Master Bed 0 13 6 8 0 108.0 ft2 4 0.109 0.22 0.60 0 10 NE Exterior Blk Wall, Stucco Great Room 0 4 0 8 0 32.0 ft2 4 0.109 0.22 0.60 0 11 NW Exterior Blk Wall, Stucco Great Room 0 18 6 8 0 148.0 ft2 4 0.109 0.22 0.60 0 12 SE Exterior Blk Wall, Stucco Master Bath 0 6 6 8 0 52.0 ft2 4 0.109 0.22 0.60 0 13 SW Exterior Blk Wall, Stucco Kitchen 0 18 6 8 0 148.0 ft2 4 0.109 0.22 0.60 0 14 NW Exterior Blk Wall, Stucco Kitchen 0 13 0 8 0 104.0 ft2 4 0.109 0.22 0.60 0 DOORS (Total Exposed Area = 20 sq.ft.) Width Height ✓ # Ornt Door Type Spalce Storms U-Value Ft In Ft In Area 1 NE Fbrgls Door Great Room None 0.127 3 0 6 10 20.4 ft2 WINDOWS (Total Exposed Area = 150 sq.ft.) Wall I Overhang Interior f # Ornt ID Frame Panes NFRC U-Factorl SHGC Impact Area Depth Separation Shade Screening 1 NE 1 Metal Low-E Double Yes I 0.580 0.24 Yes 15.6ft2 4 ft 0 in 1 ft 0 in Blinds 45° outdoor 2 NE 3 Metal Low-E Double Yes 0.580 0.24 Yes 31.2ft2 6 ft 0 in 1 ft 0 in Blinds 45° outdoor 3 SW 9 Metal Low-E Double Yes 0.580 0.24 Yes 15.6ft2 1 ft 0 in 1 ft 0 in Blinds 45° outdoor 4 NW 11 Metal Low-E Double Yes 0.580 0.24 Yes 31.2ft2 1 ft 0 in 1 ft 0 in Blinds 45° outdoor 5 SW 13 Metal Low-E Double Yes 0.580 0.24 Yes Yes 15.6ft2 1 ft 0 in 40 2 1 ft 0 in Blinds 45° outdoor GARAGE # Floor Area Ceiling Area Exposed Wall Perimeter Avg. Wall Height Exposed Wall Insulation 1 0 INFILTRATION Scope ethod SLA C M 50 ELA EqLA ACH ACH 5 1 Wholehouse Simplified 0.000357 1216 ; 66.87 125.6 0.53 7.00 HEATING SYSTEM ✓ # System Type Subtype Efficiency Capacity Block Ducts 1 Electric strip AFUE: 100.0 19.2 kBtu/hr 1 s s#1 COOLING SYSTEM l # System Type Subtype Efficiency Capacity Air Flow SHR Block Ducts 1 Split air conditioner SEER: 15.5 28.0 kBtu/hr 933 cfm 0.70 1 s s#1 HOT WATER SYSTEM f # System Type Subtype Location EF Cap Use SetPnt Conservation 1 Electric conventional 0.96 40 gal 60 gal 120 °F None 2020-Sep-09 14:14:50 rr oft wr hts® Right-Suite®UnNersal201919.0.20 RSU29066 Right -Energy® Florida2017 Section405.4.1 Compliant Software ...cuments\Wrightsoft HVAC\TBD Wind Trail, PSL.rup Calc = MJ8 Front Door faces: N Page 4 GC)DRA DAt)r,_7(147 DUCTS --------- Supply --------- --------- Return --------- Air CFM 25 Percent HVAC # # Location R-Value Area Location Area Leakage Type Handler Out Leakage QN RLF Heat Cool 1 House Attic 6.0 271 ft2 House Attic 93 ftz Default Leakage House Attic (Default) 6.00 1 1 TEMPERATURES Programmable Thermostat: Y Ceiling Fans: , Cooling [ X ]Jan [ X] Feb [ X] Mar [ X] Apr [ X] May [ X] Jun [ X] Jul [ X] Aug [ X] Sep [ X] Oct [ X] Nov [ X] Dec Heating [ X ]Jan [ X] Feb [ X] Mar [ X] Apr [ X] May [ X] Jun [ X] Jul [ X] Aug [ X] Sep [ X] Oct [ X] Nov [ X] Dec Venting [ X ]Jan [ X] Feb [ X] Mar [ X] Apr [ X] May [ X] Jun [ X] Jul [ X] Aug [ X] Sep [ X] Oct [ X] Nov [ X] Dec Thermostat Schedule: Florida Building Code, 6th Edition Hours Schedule Type 2017 1 2 3 4 5 6 7 8 9 10 11 12 Cooling (WD) AM 75 75 75 75 75 75 75 75 75 75 75 75 PM 75 75 75 75 75 75 75 75 75 75 75 75 Cooling (WEH) AM 75 75 75 75 75 75 75 75 75 75 75 75 PM 75 75 75 75 75 75 75 75 75 75 75 75 Heating (WD) AM 72 72 . 72 72 72 72 72 72 72 72 72 72 PM 72 72 72 72 72 72 72 72 72 72 72 72 Heating (WEH) AM 72 72 72 72 72 72 72 72 72 72 72 72 PM 72 72 72 72 72 72 72 72 72 72 72 72 2020-Sep-09 14:14:50 . �� Q " Right -Suite® Universal 2019 19.0.20 RSU29066 Right -Energy@ Florida 2017 Section405.4.1 Compliant Software pages eura�L ;:• t ...cuments\Wrightsoft HVAC\TBD Wind Trail, PSL.rup Calc = MJB Front Doorfaces: N FORM R405-2017 ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD ESTIMATED ENERGY PERFORMANCE INDEX = 97 The lower the EnergyPerformance Index, the more efficient the home. 1. New home or addition 2. Single-family or multiple -family 3. Number of units, if multiple -family 4. Number of bedrooms 5. Is this a worst case? (yes/no) 6. Conditioned floor area (ft2) 7. Windows, type and area* a. U-Factor: b. Solar Heat Gain Coefficient (SHGC): c. Area (T) 8. Skylights a. U-Factor: b. Solar Heat Gain Coefficient (SHGC): 9. Floor type, insulation level a. Slab -on -grade (R-value): b. Wood, raised (R-value): c. Concrete, raised (R-value) 10 Wall type and insulation: a. Exterior: 1. Wood frame (Insulation R-value): 2. Masonry (Insulation R-value): b. Adjacent: 1. Wood frame (Insulation R-value): 2. Masonry (Insulation R-value): 11. Ceiling type and insulation level a. Under attic (R-value): b. Single assembly (R-value): c. Knee walls/skylight walls (R-value) d. Radiant barrier installed 1. New (From Plans 2. Single -Family 3. 1 4. 3 5. Yes 6. 1302.50 Db74m act(Avg), 0.599 7b. 6.23 7c. 150 8a 8b. 9a. 0.0 9b. 9c. 12. Ducts, location & insulation level a. Supply ducts: R 6.0 b. Return ducts: R 6.0 c. AHU location: House Attic 13. Cooling systems Capacity 28.0 a. Split system: SEER 15.50 b. Single package: SEER c. Ground/water source: SEER/COP d. Room unit/PTAC: EER e. Other: 14 15 10a1. 10a2. 4 16 10b1. 10b2. 11 a. 30.0 11 b. 11 C. 11 d. Heating systems Capacity 19.2 a. Split system heat pump: HSPF b. Single package heat pump: HSPF c. Electric resistance: COP 100.00 d. Gas furnace, natural gas: AFUE e. Gas furnace, LPG: AFUE f. Other: Water heating systems a. Electric resistance: EF 0.960 b. Gas fired, natrual gas: EF c. Gas fired, LPG: EF d. Solar system with tank: EF e. Dedicated heat pump with tank: EF f. Heat recovery unit: HeatRec% g. Other: HVAC credits claimed (Performance Method) a. Ceiling fans: b. Cross ventilation: c. Whole house fan: d. Multizone cooling credit: e. Multizone heating credit: f. Programmable thermostat: Yes *Label required by Section 303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT. I certify that this home has complied with the Florida Building Code, Energy Conservation,through the above energy saving features which will be installed (or exceeded) in this ome before final inspection. Otherwise, a new EPL Display Card will be completed based on installed Code compliant fea S. Builder Signature: Date: Address of New Home: TBD Wind City/FL Zip: Fort Pierce, FL 34981 2020-Sep-09 14:14:50 wrllcglf7tSoftll Right -Suite® U niversal 2019 19.0.20 RSU29066 Right -Energy® Florida2017 Section405.4.1 Compliant Software Page �ura•ti� w•..e ice, ...cuments\Wrightsoft HVAC\TBD Wind Trail, PSL.rup Calc = MJ8 Front Door faces: N FORM R405-2017 Florida Building Code, Energy Conservation, 6th Edition (2017) Mandatory Requirements for Residential Performance, Prescriptive and ERI Methods ADDRESS: TBD Wind Trail PERMIT #: Fort Pierce, FL 34981 MANDATORY REQUIREMENTS - See individual code sections for full details. SECTION R401 GENERAL R401.3 Energy Performance Level (EPL) display. card (Mandatory). The building official shall require that an energy performance level (EPL) display card be completed and certified by the builder to be accurate and correct before final approval of the building for occupancy. Florida law (Section 553.9085, Florida Statues) requires the EPL display card to be included as an addendum to each sales contract for both presold and nonpresold residential buildings. The EPL display card contains information indicating the energy performance level and efficiencies of components installed in a dwelling unit. completed and signed by the builder The building official shall verify that the EPL display card accurately reflects the plans and specifications submitted to demonstrate compliance for the building. A copy of the EPL display card can be found in Appendix RD. R402.4 Air leakage (Mandatory). The building thermal envelope shall'be constructed to limit air leakage in accordance with the requirements of Sections R402.4.1 through R402.4.5. Exception: Dwelling units of R-2 Occupancies and multiple attached single family dwellings shall be permitted to comply with Section C402.5. R402.4.1 Building thermal envelope. The building thermal envelope shall comply with Sections R402.4.1.1 and R402.4.1.2. The sealing methods between dissimilar materials shall allow for differential expansion and contraction. R402.4.1.1 Installation. The components of the building thermal envelope as listed in Table R402.4.1.1 shall be installed in accordance with the manufacturer's instructions and the criteria listed in Table 402.4.1.1, as applicable to the method of construction. Where required by the code official, an approved third party shall inspect all components and verify compliance. R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate not exceeding seven air changes per hour in Climate Zones 1 and 2, and three air changes per hour in Climate Zones 3 through 8. Testing shall be conducted in accordance with ANSI/RESET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105(3)(f) (g), or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. Exception: Testing is not required for additions, alterations, renovations, or repairs, of the building thermal envelope of existing buildings in which the new construction is less than 85 percent of the building thermal envelope. During testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures. 2. Dampers including exhaust, intake, makeup air, backdraft and; flue dampers shall be closed, but not sealed beyond intended infiltration control measures. 3. Interior doors, if installed at the time of the test, shall be open. 4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. 5. Heating and cooling systems, if installed at the time of the test, shall be turned off. 6. Supply and return registers, if installed at the time of the test, shall be fully open. R402.4.2 Fireplaces. New wood -burning fireplaces shall have tight -fitting flue dampers or doors, and outdoor combustion air. Where using tight -fitting doors on factory -built fireplaces listed and labeledin accordance with UL 127, the doors shall be tested and listed for the fireplace. Where using tight-figging doors on masonry fireplaces,the doors'shall be listed and labeled in accordance with UL 907. R402.4.3 Fenestration air leakage. Windows, skylights and sliding glass doors shall have an air infiltration rate of no more than 0.3 cfm per square foot (1.5 L/s/m2), and swinging doors no more than 0.5 cfm per square foot (2.6 Us/m2), when tested according to NFRC 400 or AAMAMIDMA/CSA 101/I.S.2/A440 by an accredited, independent laboratory and listed and labeled by the manufacturer. Exception: Site -built windows, skylights and doors. 2020-Sep-09 14:14:50 liVQ'fghtgaf O Right -Suite® Universal201919.0.20 RSU29066 Right -Energy® Florida 2017 Section405.4.1 Compliant Software Page aurarm�.i,+L,j ...cuments\Wrightsoft HVAC\TBD Wind Trail, PSL.rup Cale = MJ8 Front Door faces: N FORM R405-2017 MANDATORY REQUIREMENTS -(Continued) R402.4.4 Rooms containing fuel -burning appliances In Climate Zones 3 through 8, where open combustion air ducts provide combustion air to open combustion fuel burning appliances, the appliances and combustion air opening shall be located outside the building thermal envelope or enclosed in a room, isolated from inside the thermal envelope. Such rooms shall be sealed and insulated in accordance with the envelope requirements of Table R402.1.2, where the walls, floors and ceilings shall meet not less than the basement wall R-value requirement. The door into the room shall be fully gasketed and any water lines and ducts in the room insulated in accordance with Section R403. The combustion air duct shall be insulated where it passes through conditioned space to a minimum of R-8. Exceptions: 1. Direct vent apliances with both intake and exhaust pipes installed continuous to the outside. 2. Fireplaces and stoves complying with Section R402.4.2 and Section R1006 of the Florida Building Code, Residential. R402.4.5 Recessed lighting. Recessed luminaires installed in the building thermal envelope shall be sealed to limit air leakage between conditioned and unconditioned spaces. All recessed luminaires shall be IC -rated and labeled as having an air leakage rate not more than 2.0 cfm (0.944 L/s) when tested in accordance with ASTM E283 at a 1.57 psf (75 Pa) pressure differential. All recessed luminaires shall be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering. I SECTION R403 SYSTEMS R403.1 Controls R403.1.1 Thermostat provision (Mandatory). At least one thermostat shall be provided for each separate heating and cooling system. R403.1.3 Heat pump supplementary heat (Mandatory). Heat pumps; having supplementary electric -resistance heat shall have controls that, except during defrost, prevent supplemental heat operation when the heat pump compressor can meet the heating load. R403.3.2 Sealing (Mandatory). All ducts, air handlers, filter boxes and building cavities that form the primary air containment passageways for air distribution systems shall be considered ducts and plenum chambers, shall be constructed and sealed in accordance with Section C403.2.9.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria below. Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC 380 by either individuals as defined in Section 553.993(5) or (7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(f), (g), or (i), Florida Statutes, to be "substantially leak free" in accordance with Section R403.3.3. R403.3.2.1 Sealed air handler. Air handlers shall have a manufacturer's designation for an air leakage of no more than 2 percent of the design air flow rate when tested in accordance with ASHRAE 193. rl R403.3.3 Duct testing. Ducts shall be pressure tested to determine air leakage by one of the following methods: 1. Rough -in test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the system, including the manufacturer's air handler enclosure if installed at the time of the test. All registers shall be taped or otherwise sealed during the test. 2. Post construction test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the entire system, including the manufacturer's air handler enclosure. All registers shall be taped or otherwise sealed during the test. Exceptions: 1. A duct leakage test shall not be required where the ducts and air handlers are located entirely within the building thermal envelope. 2. Duct testing is not mandatory for buildings complying by Section 405 of this code. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. R403.3.5 Building Cavities (Mandatory). Building framing cavities shall not be used as ducts or plenums. R403.4 Mechanical system piping insulation (Mandatory). Mechanical systempiping capable of carrying fluids above 105°F (41°C) or below 55°F (13°C) shall be insulated to a minimum of R 3. R403.4.1 Protection of piping insulation. Piping insulation exposed to weather shall be protected from damage, including that caused by sunlight, moisture, equipment maintenance, and wind, and shall provide shielding from solar radiation that can cause degradation of the material. Adhesive tape shall not be permitted. R403.5.1 Heated water circulation and temperature maintenance systems (Mandatory). Heated water circulation systems shall be in accordance with Section R403.5.1.1. Heat trace termperature maintenance systems shall be in accordance with Section R403.5.1.2. Automatic controls, temperature sensors and pumps shall be accessible. Manual controls shall be readily accessible. R403.5.1.1 Circulation systems. Heated water circulation systems shall be provided with a circulation pump. The system return pipe shall be dedicated return pipe or a cold water supply pipe. Gravity and thermosiphon circulation systems shall be prohibited. Controls for circulating hot water system pumps shall start the pump based on the identification of a demand for how water within the occupancy. The controls shall automatically turn off the pump when the water in the circulation loop is at the desired temperature and when there is no demand for hot water. R403.5.1.2 Heat trace systems. Electric heat trace systems shall comply with IEEE 515.1 or UL 515. Controls for such systems shall automatically adjust the energy input to the heat tracing to maintain the desired water temperature in the piping in accordance with the times when heated water is used in the occupancy. 2020-Sep-09 14:14:50 W'rJ_0fJM0ft" Rig ht-Suite®Universal201919.0.20 RSU29066 Right -Energy® Florida2017 Section405.4.1 Compliant Software Page ►di«S�i�r:+Ty ...cuments\Wrightsoft HVAC\TBD Wind Trail, PSL.rup Calc = MJ8 Front Door faces: N FORM R405-2017 MANDATORY REQUIREMENTS -(Continued) R403.5.5 Heat traps (Mandatory). Storage water heaters not equipped with integral heat traps and having vertical pipe risers shall have heat traps installed on both the inlets and outlets. External heat traps shall consist of either a commercially available heat trap or a downward and upward bend of at least 3 1 /2 inches (89 mm) in the hot water distribution line and cold water line located as close as possible to the storage tank. R403.5.6 Water heater efficiencies (Mandatory). R403.5.6.1 Storage water heater temperature controls. El R403.5.6.1.1 Automatic controls. Service water heating systems shall be equipped with automatic temperature controls capable of adjustment from the lowest to the highest acceptable temperature settings for the intended use. The minimum temperature setting range shall be f rom 100°F to 140°F (38°C to,60°C). R403.5.6.1.2 shut down. A separate switch or a clearly marked circuit breaker shall be provided to permit the power supplied to electric service systems to be turned off. A separate valve shall be provided to permit the energy supplied to the main burner(s) of combustion types of service water heating systems to be turned off. R403.5.6.2 Water heating equipment. Water heating equipment installed in residential units shall meet the minimum efficiencies of Table C404.2 in Chapter 4 of the Florida Building Code, Energy Conservation, Commercial Provisions, for the type of equipment installed. Equipment used to provide heating functions as part of a combination system shall satisfy all stated requirements for the appropriate water heating category. Solar water heaters shall met the criteria of Section R403.5.6.2.1. R403.5.6.2.1 Solar water heating system. Solar systems for domestic hot water production are rated by the annual solar energy factor of the system. The solar energy factor of a system shall be determined from the Florida Solar Energy Center Directory of Certified Solar Systems. Solar collectors shall be tested in accordance with ISO Standard 9806, Test Methods for Solar Collectors, and SRCC Standard TM-1, Solar Domestic Hot Water System and Component Test Protocol. Collectors in installed solar water -heating systems should meet the following criteria: 1. Be installed with a tilt angle between 10 degrees and 40 degrees of the horizontal; and 2. Be installed at an orientation within 45 degrees of true south. R403.6 Mechanical ventilation (Mandatory). The building shall be provided with ventilation that meets the requirements of the Florida Building Code, Residential or Florida Building Code, Mechanical, as applicable, or with other approved means of ventilation, including: Natural, Infiltration or Mechanical means. Outdoor air intakes and exhausts shall have automatic or gravity dampers that close when the ventilation system is not operating. ' R403.6.1 Whole -house mechanical ventilation system fan efficacy. When installed to function as a whole -house mechanical ventilation system, fans shall meet the efficacy requirements of Table R403.6.1. Exception: Where mechanical ventilation fans are integral to tested and listed HVAC equipment, they shall be powered by an electronically commutated motor. R403.6.2 Ventilation air. Residential buildings designed to be operated at a positive indoor pressure of for mechanical ventilation shall meet the following criteria: 1. The design air change per hour minimums for residential buildings in ASHRAE 62.2, Ventilation for Acceptable Indoor Air Quality, shall be the maximum rates allowed for residential applications. 2. No ventilation or air-conditioning system make-up air, shall be provided to conditioned space from attics, crawlspaces, attached enclosed garages or outdoor spaces adjacent to swimming pools or spas. 3. If ventilation air is drawn from enclosed spaces(s), then the walls of the space(s) from which air is drawn shall be insulated to a minimum of R-11 and the ceiling shall,be insulated to a minimum or R-19, space permitting, or R-10 otherwise. R403.7 Heating and cooling equipment (Mandatory). R403.7.1 Equipment sizing. Heating and cooling equipment shall be sized in accordance with ACCA Manual S based on the equipment loads calculated in accordance with ACCA Manual J or other approved methodologies, heating and cooling calculation based on building loads for the directional orientation of the building. The manufacturer and model number of the outdoor and indoor units (if split system) shall be submitted along with the sensible and total cooling capacities at the design conditions described in Section R302.1. This code does not allow designer safety factors, provisions for future expansion or other factors that affect equipment sizing. System sizing calculations shall not include loads created by local intermittent mechanical ventilation such as standard kitchen and bathroom exhaust systems. New or replacement heating and cooling equipment shall have an efficiency rating equal to or greater than the minimum required by federal law for the geographic location where the equipment is installed. TABLE 14403.6.1 WHOLE -HOUSE MECHANICAL VENTILATION SYSTEM FAN EFFICACY FAN LOCATION AIRFLOW RATE MINIMUM CFM MINIMUM EFFICACY (a) CFM/WATT AIRFLOW RATE MAXIMUM CFM Range hoods Any 2.8 cfm/watt Any In -line fan Any 2.8 cfm/watt Any Bathroom, utility room 10 1.4 cfm/watt < 90 Bathroom, utility room 90 2.8 cfm/watt Any For SI: 1 cfm - 28.3 L/min. (a) When tested in accordance HVI Standard 916 2020-Se 0914:14:50 rF7jN/rj �1tSpRight-Suite® Universal 2019 19.0.20 RSU29066 Right -Energy® Florida2017 Section405.4.1 Compliant Software p ...cuments\Wrightsoft HVAC\TBD Wind Trail, PSL.rup Calc = MJ8 Front Door faces: N Page 9 MANDATORY REQUIREMENTS -(Continued) ED R403.7.1.1 Cooling equipment capacity. Cooling only equipment shall be selected so that its total capacity is not less than the calculated total load but not more than 1.15 times greater than the total load calculated according to the procedure selected in Section 403.7, or the closest available size provided by the manufacturer's product lines. The corresponding latent capacity of the equipment shall not be less than the calculated latent load. The published value for AHRI total capacity is a nominal, rating -test value and shall not be used for equipment sizing. Manufacturer's expanded performance data shall be used to select cooling -only equipment. This selection shall be based on the outdoor design dry-bulb temperature for the load calculation (or entering water temperature for water -source equipment), the blower CFM provided by the expanded performance data, the design value for entering wet -bulb temperature and the design value for entering dry-bulb temperature Design values for entering wet -bulb and dry-bulb temperatures shall be for the indoor dry bulb and relative humidity used for the load calculation and shall be adjusted for return side gains if the return duct(s) is installed in an unconditioned space. Exceptions: 1. Attached single- and multiple -family residential equipment sizing may be selected so that its cooling capacity is less than the calculated total sensible load but not less than 80 percent of that load. 2. When signed and sealed by a Florida -registered engineer, in attached single- and multiple -family units, the capacity of equipment may be sized in accordance with good design practice. ED R403.7.1.2 Heating equipment capacity. R403.7.1.2.1 Heat pumps Heat pump sizing shall be based on the cooling requirements as calculated according to Section R403.7.1.1, and the heat pump total cooling capacity shall not be more than 1.15 times greater than the design cooling load even if the design heating load is 1.15 times greater than the design cooling load. R403.7.1.2.2 Electric resistance furnaces. Electric resistance furnaces shall be sized within 4 kW of the design requirements calculated according to the procedure selected in Section R403.7.1 R403.7.1.2.3 Fossil fuel heating equipment. The capacity of fossil fuel heating equipment with natural draft atmospheric burners shall not be less than the design load calculated in accordance with Section R403.7.1. R403.7.1.3 Extra capacity required for special occasions. Residences requiring excess cooling or heating equipment capacity on an intermittent basis, such as anticipated additional loads caused by major entertainment events, shall have equipment sized or controlled to prevent continuous space cooling or heating within that space by one or more of the following options: 1. A separate cooling or heating system is utilized to provide cooling or heating to the major entertainment areas. 2. A variable capacity system sized for optimum performance during base load periods is utilized. R403.8 Systems serving multiple dwelling units (Mandatory). Systems serving multiple dwelling units shall comply with Sections C403 and C404 of the IECCrCommercial Provis ions in lieu of Section R403. rl R403.9 Snow melt and ice system controls (Mandatory). Snow- and ice -melting systems, supplied through energy service to the building, shall include automatic controls capable of shutting off the systemw hen the pavement temperature is above 50°F (10°C), and no precipitation is falling and an automatic or manual control that w ill allow shutoff when the outdoor temperature is above 40°F (4.8°C). R403.10 Pools and permanent spa energy consumption (Mandatory). The energy consumption of pools and permanent spas shall be in accordance with Sections R403.10.1 through R403.10.5. R403.10.1 Heaters. The electric power to heaters shall be controlled by a readily accessible on -off switch that is an integral part of the heater mounted on the exterior of the heater, or external to and within 3 feet (914 mm) of the heater. Operation of such switch shall not change the setting of the heater thermostat. Such switches shall be in addition to a circuit breaker for the power to the heater. Gas -fired heaters shall not be equipped with continuously burning ignition pilots. El R403.10.2 Time switches. Time switches or other control methods that can automatically turn off and on according to a preset schedule shall be installed for heaters and pump motors. Heaters and pump motors that have built-in time switches shall be in compliance with this section. Exceptions: 1. Where public health standards require 24-hour pump operations. 2. Pumps that operate solar- and waste -heat -recovery pool heating systems. 3. Where pumps are powered exclusively from on -site renewable generation. R403.10.3 Covers. Outdoor heated swimming pools and outdoor permanent spas shall be equipped with a vapor- retardant cover on or at the water surface or a liquid cover or other means proven to reduce heat loss. Exception: Where more than 70 percent of the energy for heating, computed over an operation season, is from site -recovered energy, such as from a heat pump or solar energy source, covers or other vapor -retardant means shall not be required. R403.10.4 Gas- and oil -fired pool and spa heaters. All gas- and oil -fired pool and spa heaters shall have a minimum thermal efficiency of 82 percent for heaters manufactured on or after April 16, 2013, when tested in accordance with ANSI Z 21.56. Pool heaters fired by natural or LP gas shall not have continuously burning pilot lights. 2020-Sep-09 14:14:50 WrIghtsoft" Right -Suite® Universal 2019 19.0.20 RSU29066 Right -Energy® Florida 2017 Section405.4.1 Compliant Software Page 10 aurs� ui�rt:.t ...cuments\Wrightsoft HVAC\TBD Wind Trail, PSL.rup Cale = MJ8 Front Door faces: N MANDATORY REQUIREMENTS - (Continued) R403.10.5 Heat pump pool heaters. Heat pump pool heaters shall have a minimum COP of 4.0 when tested in accordance with AHRI 1160, Table 2, Standard Rating Conditions -Low Air Temperature. A test report from an independent laboratory is required to verify procedure compliance. Geothermal swimming pool heat pumps are not required to meet this standard. ❑ R403.11 Portable spas (Mandatory). The energy consumption of electric -powered portable spas shall be controlled by the requirements of APSP-14. 91*040C0]kigal [$1i ELECTRICAL POWER AND LIGHTING SYSTEMS R404.1 Lighting equipment (Mandatory). Not less than 75 percent of the lamps in permanently installed lighting fixtures shall be high -efficacy lamps or not less than 75 percent of the permanently installed lighting fixtures shall contain only high -efficacy lamps. Exception: Low -voltage lighting. R404.1.1 Lighting equipment (Mandatory). Fuel gas lighting systems shall not have continuously burning pilot lights. 2020-Sep-09 14:14:50 411FWright9oft" Right-Suite@Universal201919.0.20 RSU29066 Right -Energy@ Florid Section405.4.1CompliantSoftware Page11 Aurmsiaooii ii" ...cuments\Wrightsoft HVAC\TBD Wind Trail, PSL.rup Calc = MJ8 Front Door faces: N FORM R405-2017 TABLE 402.4.1.1 AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA Project Name: Basile Residence Builder Name PSL Prop Street: TBD Wind Trail Permit Office: City, State, Zip: Fort Pierce, FL 34981 Permit Number: Owner: Basile Residence Jurisdiction: St. Lucie Design Location: FL, St Lucie Co Intl COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA General A continuous air barrier shall be installed in the requirements q building envelope. The exterior thermal envelope sir rmmatele insulation shall not be used as a pp ❑ contains a continuous barrier. Breaks or joints in the 9 air barrier shall be sealed. Ceiling/attic The air barrier in any dropped ceiling/soffit The insulation in any dropped ceiling/soffit shall be aligned with the insulation and any shall be aligned with the air barrier. gaps in the air barrier shall be sealed. ❑ Access openings, drop down stairs or knee wall doors to unconditioned attics paces shall be sealed. Walls The junction of the foundation and sill plate Cavities with corners and headers of frame walls shall be sealed.The junction of the top plate shall be insulated by completely filling the cavity and the top of exterior walls shall be sealed. with a material having a thermal resistance of R-3 ❑ Knee walls shall be sealed. per inch minimum. Exterior thermal envelope insulation for framed walls shall be installed in substantial contact and continuous alignment with the air barrier Windows, skylights doors The space between window/door jambs and framing, framing be ❑ and and skylights and shall sealed. Rim joists are insulated and include an air Rim joists shall be insulated. ❑ Rim joists barrier. Floors (including The air barrier shall be installed at any exposed Floor framing cavity Insulation shall be installed above -garage and edge of insulation. to maintain permanent contact with the underside cantilevered floors) of subfloor decking, or floor framing cavity insulation shall be permitted to be in contact ❑ with the top sideof sheathing, or continuous insulation installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. Crawl space Exposed earth in unvented crawl spaces shall be Where provided in lieu of floor insulation, walls covered with a Class I vapor retarder with insulation shall be permanently attached ❑ overlapping joints taped. to the crawlspace walls. Shafts, penetrations Duct shafts, utility penetrations, and flue shaft openings to exterior or unconditioned space shall ❑ be sealed. Narrow cavities Batts in narrow cavities shall be cut to fit, or narrow cavities shall be filled by insulation that ❑ on installation readily conforms to the available cavity spaces. Garage Air sealing shall be provided between the garage ❑ separation and conditioned spaces. Recessed Recessed light fixtures installed in the building Recessed light fixtures installed in the lighting thermal envelope shall be sealed to the drywall. building thermal envelope shall be air tight ❑ and IC rated. Plumbing and Batt insulation shall be cut neatly to fit around wiring wiring and plumbing in exterior walls, or insulation that on installation readily conforms ❑ to available space shall extend behind piping and wiring. Shower/tub on The air barrier shall be installed behind Exterior walls adjacent to showers and tubs exterior wall electrical or communication boxes or air -sealed shall be insulated. ❑ boxes shall be installed. Electrical/phone The air barrier shall be installed behind box on exterior electrical or communication boxes or air -sealed ❑ walls boxes shall be installed. HVAC register HVAC register boots that penetrate building boots thermal envelope shall be sealed to the subfloor ❑ or drywall. Concealed When required to be sealed, concealed fire sprinklers sprinklers shall only be sealed in a manner that is recommended by the manufacturer. ❑ Caulking or other adhesive sealants shall not be used to fill voids between fire sprinkler cover plates and walls or ceilings. a. In addition, inspection of log walls shall be in accordance with the provisions of ICC-400. WrighftoftO Right -Suite® Universal 2019 19.0.20 RSU29066 Right -Energy® Florida 2017 Section405.4.1 CompliantSofbtiare0-Sep-091 age 10 ae�ra•i�.•..e:.,r.�,., . ...currents\Wrightsoft HVAC\TBD Wind Trail, PSL.rup Calc = MJS Front Door faces: N Page 12 FORM R405-2017 Envelope Leakage Test Report (Blower Door Test) Residential Prescriptive, Performance or ERI Method Compliance 2017 Florida Building Code, Energy Conservation, 6th Edition Jurisdiction: St. Lucie Permit Number: Job Information Builder: PSL Prop Community: Lot: Address: TBD Wind Trail Unit: City: Fort Pierce State: FL Zip: 34981 Air Leakage Test Results Passing results must meet either the Performance, Prescriptive, or ERI Method. ❑ PRESCRIPTIVE METHOD The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour at a pressure of 6.2 inch w.g. (50 pascals) in Climate Zones 1 and 2. ❑The building or dwelling unit shall be tested and verified as having an air leakage rate of not PERFORMANCE or ERI METHOD exceeding the selected ACH(50) value, as shown on FORM R405-2017 (Performance) or R406-2017 (ERI), section labeled as Infiltration, sub -section ACH50. ACH(50) specified on Form R405-2017-Energy Calc (Performance) or R406-2017 (ERI): 7.000 x60 = 10420 = Method for calculating building volume: CFM(50) Building Volume ACH(50) ❑ Retrieved from architectural plans ❑ PASS 0 Code software calculated ❑ Field measured and calculated ❑ When ACH(50) is less than 3, Mechanical Ventilation installation must be verified by building department. R402.4.1.2 Testing. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statues, or individuals licensed as set forth in Section 489.105(3)(f), (g), or (1) or and approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures. 2. Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures. 3. Interior doors, if installed at the time of the test, shall be open. 4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. 5. Heating and cooling systems, if installed at the time of the test, shall be turned off. 6. Supply and return registers, if installed at the time of the test, shall be fully open. Testing Company Company Name: Phone: I hereby verify that the above Air Leakage results are in accordance with the 2017 6th Edition Florida Building Code Energy Conservation requirements according to the compliance method selected above. Signature of Tester: Date of Test: Printed Name of Tester: License/Certification #: Issuing Authority: 2020-Sep-09 14:14:50 =l�1- Wn_gtjtSjD#tb Right -Suite® Universa1201919.0.20 RSU29066 Right -Energy® Florida 2017 Section405.4.1 Compliant Software Page 13 ►ur ��c.�rj,...t.:�i.y ...cuments\Wrightsoft HVAC\TBD Wind Trail, PSL.rup Calc = MJ8 Front Door faces: N FORM R405-2017 Duct Leakage Test Report Residential Perscriptive, Performance or ERI Method Compliance 2017 Florida Building Code, Energy Conservation, 6th Edition Jurisdiction: St. Lucie Permit Number: Job Information Builder: PSL Prop Community: Lot: Address: TBD Wind Trail Unit: City: Fort Pierce State: FL Zip: 34981 Duct Leakage Test Results i 11 System 1 cfm25 System 2 cfm25 System 3 cfm25 Sum of any additional systems cfm25 Total of all systems cfm25 1303 =Qn Total of all Total Conditioned systems Square Footage ❑ PASS ❑ FAIL ❑ 'Prescriptive Method cfm25 (Total) To qualify as "substantially leak free" Qn Total must be less than or equal to 0.04 if air handler unit is installed. If air handler, unit is not installed, Qn Total must be less than or equal to 0.03. This testing method meets the requirements in accordance with Section R403.3.3. Is the. air handler unit installed ❑, YES (<= 0.04 Qn) during testing? ❑ NO (<= 0.03 Qn) ❑ Performance / ERI Method cfm25 (Out or Total) To qualify using this method, Qn must be not greater than the proposed duct leakage Qn specified on Form R405-2017 or R406-2017. Leakage Type selected on Form Qn specified on Form R405-2017 R405-2017 (Energy Calc) or R406-2017 (Energy Calc) or R406-2017 Default Leakage Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC380 by either individuals as defined in Section 553.993(5) or (7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(f), (g) or (i), Florida Statues. 'Testing Company Company Name: Phone: I hereby verify that the above duct leakage test results are in accordance with the 2017 6th Edition Florida Building Code Energy Conservation requirements according to the compliance method selected above. Signature of Tester: Date of Test: Printed Name of Tester: License/Certification #: Issuing Authority: l%1/� a 2020-Sep-0914:14:50 �9 o Rig RSU29066 Rig Florida 2017 Section406.4.1CompliantSoftware Page14 cuments\Wrightsoft HVAC\TBD Wind Trail, PSL.rup Calc = MJ8 Front Door faces: N 4 � s Reference Home Characteristics Basile Residence TBD Wind Trail Fort Pierce, FL 34981 Above -grade Walls (Uo) Above -grade Wall Solar Absorptance Above -grade Wall Infared Emittance Basement Walls (Uo) Above -grade Floors (Uo) Slab Insulation R-Value Ceilings (Uo) Roof Solar Absorptance Roof Infared Emittance Attic Vent Area (ft2) Crawls pace Vent Area (ft2) Exposed Masonry Floor Area (ft2) Carpet & Pad R-Value Door Area (ft2) Door U-Factor North Window Area (ft2) South Window Area (ft2) East Window Area (ft2) West Window Area (ft2) Window U-Factor Window SHGC (Heating) Window SHGC (Cooling) ACH50 Internal Gains * (Btu/day) Water heater gallons per day Water Heater set point temperature Water heater efficiency rating Labeled Heating System Rating and Efficiency Labeled Cooling System Rating and Efficiency Air Distribution System Efficiency Thermostat Type Heating Thermostat Settings Title: TBD Wind Trail, PSL FLBase2017 0.084 0.75 0.90 n/a n/a 0.0 0.030 0.75 0.90 4.34 n/a 260.50 2.0 40.00 0.400 37.50 37.50 37.50 37.50 0.400 0.2169 0.2169 7.00 61212 60.00 120.00 0.95 HSPF = 8.2 SEER = 14.0 0.88 Manual 72.0 (All hours) TMY City: FL —Fort —Pierce