PROPOSAL
PROPOSAL SUBMITTED TO: Owner
Date: February 22, 2018
Customer: Floyd Laamanen
Job Name: 1" Snap Lock Nail Strip Standing (Seam Panel Reroof
Job Location: 1094 Nettles Blvd., Jensen Beach, Florida, 34957
Phone: (772) 349-4248
Email: laamanenfm@gmail.com
CGC060247
CCC1330002
Job Description: Reroof — slope roof only
On the slope deck:
• Provide roofing permit
• Provide dumpsters
• Remove existing roofing down to the wood deck
• Replace all bad decking (up to #3 sheets)
• Re -nail deck as required by Hurricane Mitigation Retrofit Manuel (Based on 553.844 F.S.)
• Install ULTRA IiT WINDD WATER SEAL PEEL N STICK underlayment (45 mil)
• Install 2 layers of ULTRA HT WIND WATER SEAL PEEL N STICK membrane in valleys
• Install 1" Snap Lock Nail Strip Standing Seam Panels 032 Gauge ALUMINUM
• Painted Kynar Finish Panels 16"
• Install Bullnose Painted Kynar Finish Drip Edge 90 Degree
• Install Painted Kynar Finish Ridge Cap 3/12 slope
• Install Painted Kynar Finish Valley
• Install Valley Cleat
• Install Painted Kynar Finish Gable Rake
• Install Gable Rake Cleat
• Install Electrical Zipper Deck Boot (#1) if required
• Install Pipe Boots
• Install Gooseneck 4"
• Install Gooseneck 6"
• Install (#1) GEN 2 SOLAR ATTICE VENT 20-watt solar panel (attic ventilation 2,175 s/f)
PRICE: $ 8,000.00
WIND MITIGATION:
Southeast General Contractors Group, Inc.
of $175.00.
Not included:
Gutters
Metal fascia trim
Metal roof structures
Satellite dish removal or replacement
Screens and screen enclosures
Solar heater removal or replacement
Skylights
Truss repair
Additional Items:
plywood:
Fascia:
Second layer removal:
Chimney flashing:
Flashing, step, counter or base:
Gutter removal:
Rafter tail repairs:
Skylight replacement and flashing:
Stucco repair
General Terms and Conditions
will provide a Wind Mitigation Report for an additional fee
Cost $80.00 per sheet labor and material
Cost $18.80 Q/f labor and material
Cost $28.00 ,per square
Cost $225.09 plus stucco if required at $37.50 per s/f
Cost $17.25 �1/f labor and material
Cost $.50
Cost $120.00 each
Cost $475.00 each
Cost $37.50 per square foot
1. Change Orders, contractor may accept a "change order" to the plans, specifications or equipment. In
addition, the total price increased or decreased to reflect the change, and the same shall be in writing and
signed by the Owner and Contractor. Any increase to the contract price shall be paid by the Owner upon
ordering the work called for in such "change order" or upon execution of the change order as required
by the contractor.
2. The Owner is responsible for removing personal items, plants, vehicles, etc. from the work area.
3. Existing gutters will be removed or detached to allow for the installation of the new roofing system.
Contractor will attempt to save the gutters but in the event they are damaged the Owner accepts full
responsibility for said gutters.
4. Customer authorizes the contractor and the material supply companies access to the property. Customer
accepts full responsibility for any unforeseen damage to the walks, driveway, septic tank and drain field,
landscaping etc. to the property except for the following:
5. Due to the rising cost in labor and materials the Owner agree to allow the Contractor to submit for
additional claims coverage to the Insurance Company. Any additional funds received by the Owner will
be released to the Contractor.
6. Labor Warranty 5 year oncto s Group Inp. c shall noaterialt barranty 0e
e held relsponsibfor damage caused by hurricanes,
ted warranty.
Southeast General Contra p,
tropical storms, tornadoes, earthquakes, fires, floods or other causes beyond the reasonable control of the
Contractor. Contractor cannot be held responsible for interior damages,
7. Same as Cash(SAC)Financing (3,6,12,18,24 months) options will require an additional upfront fee.
Standard (1-12) years financing is offered'Iwith no upfront fees. All financing is contingent upon credit
approval. Standard Home Improvement financing offered from 9.99%
��`R for A and A+ credit rating.
- � Improvement loans.
Southeast General Contractors Group Inc partners with EnerBank Imp
8. Quoted price is a cash price which includes all rebates and discounts, an additional 3.5% convenience
fee will be added to payments made by credit card. l supersede any and all Prior
9. Entire Agreement - This Contract, from the time i1trihalThakeexaveshalm incorporated m this Contract
Agreements whether claimed to be oral or m g parties
r prior written matter extrinsic to this Contract shall have
their entire -understanding. No oral statement o
any force or effect.
or and materials complete in accordance with the above specifications, for the
We hereby propose to furnish lab
sum of:
$8,000.00 (Eight Thousand and 00/100 Dollars) with payments to be made as follows.
Deposit: $1,500.00
Due when roof is dried -in: $5,000.00
Due upon Completion: $1,500.00
All material is guaranteed to be as specified. All work to be completed in a workman
extlike ra cost, be executed
er according to
standard practices. Any alteration or deviation from above specifications involving xtra co
only upon written orders, and will become an extra charge over and above the estimate. All agreements are
contingent upon strikes, accidents or delays beyond our control. All agreements
gm � are contingent
days and isstrikes, d
accidents or delays beyond our control. This proposal subject
thereafter at the option of the undersigned.
Authorized
Signature:
xxe" d Date: February 22, 2018
Larry McDonald, President
SOUTHEAST GENERAL CONTRACTORS GROUP, INC.
ACCEPTANCE OF PROPOSAL
The above prices, specifications and conditions are hereby accepted. You are authorized to do the work
as specified. Payment will be made as outlined above.
Accepted:
Date:
Signature: �/ % �✓����v
Signature: Date: