Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
LETTER-SITE BEAM INSTALLMENT
Palm Harbor Homes March 5, 2018 To: Building Department Bruce Bussell Engineering Manager Palm Harbor Homes, Inc. 605 South Frontage Road Plant City, Florida 33563-9934 Phone: 813-752-1368 ExL756 Fax 1: 813-754-8675 Fax 2:813-719-3689 E-Mail: bbussell@palmharbor.com RE: Palm Harbor Home, Serial Number #21054, Model 340TL30622A Savanna Club, Site 7026 Dear Plans Examiner, The site -beam, which was 'installed by Palm Harbor Homes, and is approved by HUD, Manufactured Home Construction & Safety Standards, is constructed to receive on -site additions that are built and designed by others to accommodate such amenities as carports, sheds, and screen rooms. The on -site structure must be designed by a Florida, registered, engineer, to the Florida Building Code and all local codes. This plant - installed site beam is of adequate design for this purpose as long as tie downs and piering are per page 1 of Section 11, Misc. & Final, Inspection section of the installation manual (attached). The attached details, EW-216.2 and PA69-EW-31, are approved by the Manufactured Home Construction & Safety Standards. And, the design loads for the plant -installed site beam, as well as the supporting structure and anchorage are from the FBC and ASCE 7. I can be of further assistance at the above contact information. Sincerely yours, Bruce Bussell Engineering Manager Palm Harbor Homes CONTRACTOR CCU Option 1: using 2x4 let4n into dadoed 2x6 wall stud Metal Flat Roof Penal—N Secure Roof Panel Header Into 2k4 as approved by the manuf wtunses — Roof Panel Header — Lap W Lap Caulk Typ.Truss 2)c4 ;#3 S-P-F LaWn Fasten Into each wail stud with a as. 0.131x3' nalls. or 6-ea 711W 11W5ga staples. Alt.- 4-M3' screws approved sheathing Le.: Thermoply. Thermosheath OSS or Plywood. Option 2: using 2x4 installed on top of sheathing and exterior wall studs Typ. Roof Parrot--N Secure hoof Panel Header Into 2k4 as approved by the manufacturers Installation Instructions. Roof Panel Header Sllicone Lap Re Lap., RW— xro oeW —a 35 lohn C. Doeden, PR K2 EnOin8srin9, lrtc. Aiurninum flat stock shaped around 2c4 and secured h10 soffit and sheathing w/ metal screws. 2u4 03 s-P-F Fasten into each weg stud with 4 ea. tif8 W screws. approved sheathing I.e.: Thermoply. The OSB or Ptfamod. APPROVED PFS Corporation PALM HARBOR HOMES, INC. Madison, WI -1 15303 DAL -AS PARKWAY SUITE 800 AD0ISON. TX 75001 OCT 0 3 2000 Screen room and Carport adechment n�m 09/18/00 Factory prep options. Na HUD HUD Manufactured Home Construction & WIND ZONE 2 & 3 E1N — 216.2 GQo-r I L s PERIMETER, PIERS AND FOOTERS AWNING UNIT LOAD @ SPACING WIDTH WIDTH 8'-U'o.c. R 16 12 140" / 160" 4440 #. 61, . 180, 4788 # 6-9" 16' 140"1 160" 4886 # 5'-7" 180, 5236 # 6-2" 20' 140"1160" 5334# 6-1" 180" 5684 # 4'-9" SECTION 11—MISCELLANEOUS AND FINAL INSPECTIONS Index 11.1. AWNING, CARPORTS, PORCHES, UTILITY ROOMS, ETC. Additional structures such as awnings, carports, patio covers or attachments to a Palm Harbor Home have not typically been taken into consideration nor calculated into the design for roof or wind loads. Any additions made to the Home must be self-supporting and shall not interfere with weatherproofing (i.e. shingles, flashing, gutters, siding). However, some Palm Harbor homes have an option to be ordered with a factory installed receiver designed to take the loads of an add -on. In this case, refer to the detail for information on specific nstruction-and-requirementsi• FACTORY INSTALLED DOUBLE SECTION HOME �_ RECEIVER / BY OTHERS SITE INSTALLED BY OTHERS Perimeter piers and_footer notes: 1. Spacing for 16, x 16 is based on 2000 psf soil bearing capacity. 2. Refer to palm harbor homes installation manual for footers required for the loads given @ 8'-0" O.C. Notes: SITE AWNING WIDTH I 186" MAX. 16'-0" MAX. - WZ-1 UNIT WIDTH 16'-0" MAX. - WZ-3 114 6' MAXIMUM INSET WZ 2&3 REQUIRE ANCHOR AND VERTICAL TIE @ 5'-4' o.c, MAX. @ 6-0- O.C. MAX. 186' MAX. UNIT WIDTI WZ 2&3 REQUIRE TIE -DOWN ENGINEERING VECTOR SYSTEM (OR EQUAL) OR ANY QUALIFYING SYSTEM SPECIFICALLY APPROVED FOR PALM 1. Vertical tie connections have been factory installed to handle the uplift and overturning load from the 'main unit along with the additional load from the awning, connection to the main unit. (brackets @ 5'-4" o.c. max.) 2. The factory installed receiver is designed to handle the additional uplift and downward loads from the connection of the awning to the main unit. 3. The awning roof and roof support away from the main unit must be designed (by others) to carry all loads to the ground. The design of the awning connection along with weatherization (by others) must be designed to carry the appropriate load into the factory -installed receiver. The design must be according to the loads and requirements of the IRC 2003 for exposure V. 4. Factory installed members were designed for awning loads based on 90 mph (3 second gust) winds for wind zone 1, 120 mph (3 sec. gust) winds for wind zone 2, and 140 mph (3 sec. gust) winds for wind zone 3. This is in accordance with IRC 2003, exposure V. 5. For approved lateral load resisting systems' installation requirements and number required, refer to other pages in the Palm Harbor Homes installation manual. 6. No stabilizer plates are required at anchors loaded in direct (in -line) pull. 7. . This design is for 140" minimum floor width and 186" maximum floor width on the main units and for 20 psf roof live load in'all wind zones. 8. Maximum pier height including I-beam for wind -zone. 1 is 52" and minimum height is 31". Pier heights for wind zones 2 and 3 are based on vector system design. Section 11, Misc. & Final Inspection Page I cOPYRIGHT © 2006 BY PALM HARBOR HOMES, rNC. All Rights Reserved DESIGN OF HANDRAIL SYSTEM BY -FABRICATOR AND SHALL COMPLY WITH PARAGRAPH R312.1.1 THRU R312.1.3 OF THE 6TH EDITION (2017) OF THE FLORIDA BUILDING CODE RESIDENTIAL AND PARAGRAPH 1607.8 OF THE 5TH EDITION FLORIDA BUILDING CODE IN ADDITION TO ANY REQUIREMENTS HEREIN. 4" SPHERE CANNOT \\\\ 11111 PASS THROUGH P. ARti'% ••��GENSF %�' 1\1o.46043 � - 3.� LIIVTE ►BL + CK' yj 2 1/4" x•12" x 48" LONG I� PRE -CAST CONCRETE TREADS W/ (2) 3/8" DIA REBAR (TYP)—\ 4" CONCRETE SLABS �T. INSTALL MAXI -HAND RAILING PER MANUFACTURER'S SPECS 1 PASS THROUGHNOT 4" AND 2 1/4" ROWS OF 8" x 16" SOLID SPLIT FACE BLOCK W/ 3/8" MORTAR HEAD & BED JOINTS (2) WALLS STANDARD.SPLIT FACED BLOCK STEP / LANDING DETAIL SCALE: NTS