HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT 5-17-19U'ANNED
Imy
01)o
Planning & Development Services
Building & Code Regulation Division
23004 irginia Ave
�rce,
Fort Pi FL 34982
0�
772-462-2172 Fax 772-462-6443
CERTIFICATE OF'
CONSTRUCTIO
PERMIT #: 1803-0680
TREATMENT
SOIL TREATMENT
JOB ADDRESS: 18503 MACH ONE DR. FORT PIERCE FL
BUILDER/CONTRACTOR: RK DAVIS CONSI
PEST CONTROL CONTRACTOR: EVICT
PEST CONTROL LICENSE #: JB175775
We, the undersigned, hereby certify that we have
subterranean termites in accordance with the star
Square feet if area treated: 220
Percentage of solution:.05%
Date of Treatment: 2018
Footing
1st Treatment
Re -Treat
Driveway
15t Treatment
Re -Treat
Other
1st Treatment
Re -Treat
Note. There must be a completed form for each re4
site to be picked up by the inspector at time of each
f a �hnr�nrl
TERMITE & PEST CONTROL INC.
ated the above described construction for
of the National Pest Control Association.
Chemicals used: DOMINION 2L
Total gallons used: 125
Time of Treatment: 2;30
Slab
15t Treatment
Re -Treat
Pools
1st Treatment
nator Date
ie' nt or re -treatment and this form must be on the job
or the scheduled inspection will fail and a re -inspection
F8C104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistant jobsite posting board
shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed,
providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment
Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area
treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of
protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall
be completed prior to final building approval.
St Lucie County requires for the final inspect! on for CO, a Permanent Sticker to be placed on
the electrical panel box cover, listing all the treatments and dates of applications.
Revised 7/24/2014