Loading...
HomeMy WebLinkAboutSTEEL STRUCTURES4A�� AC472 STEEL STRUCTURES, LETTER ❑E CERTIFICATI❑N V ULCAN STEEL STRUCTURES, INC Job -Number 25281 Customer Name:R,K. DAVIS C❑NSTRUCTI❑N Job Location; PORT ST, LUCIE, FL 34987 GENERAL NOTES R9ECOU 1, MATERIALS ASTM DESIGNATI❑N NAlrl\W' STRUCTURAL STEEL PLATE -A529 OR A572 GRADE 50 or GRADE 55 COLD FORMED LIGHT GAGE SHAPES A1011 GRADE 55 �u�e , BRACE CABLES A475 EHS 61* HOT ROLLED MILL SHAPES_ ASTM A992 GRADE 50 ROOF AND WALL SHEETS A653 OR A792 GRADE 50 or GRADE 80 I N C BOLTS A307, A325T, AND A490 A307 UNLESS NOTED METAL BUILDING MANUFACTURES ASSOCIATION 2. STRUCTURAL PRIMER SHOP PRIMER PAINT IS A MINIMAL NON -UNIFORM THICKNESS COATING OF A RUST INHIBITIVE RED -OXIDE COLOR PRIMER SATISFYING THE REQUIREMENTS OF TT-P-664. THIS PRIMER IS NOT TO BE CONSIDERED A FINISH COAT AND IS NOT INTENDED FOR LONG TERM EXPOSURE TO THE ELEMENTS. THIS PRIMER IS NOT WARRANTED OR REPRESENTED AS BEING COMPATIBLE DATE: 2/ 7/18 WITH ANY TYPE OF FINISH PAINT SYSTEM. THE PRIMER COAT APPLIED AT THE FACTORY IS SUBJECT TO BLEMISHES, SCUFFS, SCRATCHES AND THE LIKE DURING SHIPPING AND DURING HANDLING AS PART OF THE ERECTION PROCESS. IT IS THE RESPONSIBILITY OF THE ERECTOR TO TOUCH UP ANY SUCH UNDESIRABLE CONDITIONS DURING OR AFTER THE ERECTION PROCESS. DESIGNED BY: JHB OBJECTIONS TO PRIMER APPEARANCE SHALL NOT BE SUBJECT TO REJECTION OR BE CONSIDERED A CAUSE FOR REJECTION. AILED BY: RDP CHECKED BY: JDH DESIGN PARAMETERS C❑MMENTS- BUILDING DESCRIPTION: - NOMINAL WIDTH: 60 feet NOMINAL LENGTH: 60 feet EAVE HEIGHT, BACK S.W: 18 feet EAVE HEIGHT, FRONT S.W:, 18 feet ROOF SLOPE, LEFT: 1,0:12 ROOF SLOPE, RIGHT: 1.0:12 DESIGN LOADS BUILDING CODE: FLORIDA BUILDING CODE 6TH EDITION (2017) - BUILDING FRAME SELF WEIGHT: INCLUDED SNOW ROOF DEAD LOAD: 2.500 psf FLAT ROOF SNOW LOAD Pf 0 psf COLLATERAL LOAD: 1 psf GROUND SNOW LOAD Pg 0.00 psf ROOF LIVE LOAD: 20.00 psf SNOW LOAD IMP. FACTOR 1,00 FRAME -LIVE -LOAD: 12 psf THERMAL FACTOR Ct 1,00 SNOW LOAD, ROOF: 0 psf SNOW EXP. FACTOR Ce : 10 WIND SPEED: (3 SEC GUST) 155 mph (Vi(t) 120.1 Mph (Vasd) INTERNAL PRESSURE COEFF. : 0.18 / -0,18 WIND EXPOSURE: C CLOSURE 'C, 0, P' : Closed RISK CATEGORY : II - Normal SEISMIC PARAMETERS SEISMIC -FORCE RESISTING SYSTEM: STEEL ORDINARY MOMENT FRAME ANALYSIS PROCEDURE :EQUIVALENT LATERAL FORCE PROCEDURE SITE CLASS (ASSUMED) : D SEISMIC IMPORTANCE: 1.00 SEISMIC DESIGN CATEGORY: A DESIGNED SPECTRAL ACCELERATION PARAMETER 'SDS' - (SHORT PERIODS): 0.06 DESIGNED SPECTRAL ACCELERATION PARAMETER 'SD1' - (I SEC PERIODS): 0.05 MAPPED SPECTRAL RESPONSE ACCELERATION: 'SS' - (SHORT PERIODS): 0,06 MAPPED SPECTRAL RESPONSE ACCELERATION: 'Sl' - (1 SEC PERIOD): 0.03 SEISMIC RESPONSE MODIFICATION COEFFICIENT: 'R' -3.5 SEISMIC RESPONSE COEFFICIENT: 'Cs' - 0.02 - TOTAL LONGITUDINAL BASE SHEAR : 0.49 TOTAL TRANSVERSE BASE SHEAR : 0.48 DRAWING RELEASE HIST❑RY DRAWING REVISI❑NS DATE SENT REASON FOR RELEASE REVISI❑ DATE BY I DESCRIPTI❑N C D 3, A325 BOLT TIGHTENING REQUIREMENTS ALL HIGH STRENGTH BOLTS ARE A325T UNLESS SPECIFICALLY NOTED OTHERWISE. STRUCTURAL BOLTS SHALL BE TIGHTENED BY THE TURN -OF -THE -NUT METHOD IN ACCORDANCE WITH THE 14TH EDITION AISC 'SPECIFICATION FOR STRUCTURAL JOINTS USING ASTM A325T OR A490 BOLTS'. PER SECTION 8.1, (SPEC. 16.2) A325T BOLTSMAY BE INSTALLED WITHOUT WASHERS WHEN TIGHTENED BY THE TURN -OF -THE NUT METHOD, ALL HIGH STRENGTH BOLTS, EXCEPT AS NOTED OTHERWISE, ARE SUBJECT TO DIRECT TENSION AND MAY REQUIRE INSPECTION AS DEFINED BY THE APPLICABLE BUILDING CODE OR STANDARD. IT IS THE RESPONSIBILITY OF THE ERECTOR TO ASSURE PROPER TIGHTNESS. 4, BUILDER/C❑NTRACT❑R RESP❑NSIBILITIES THE METAL BUILDING MANUFACTURER'S STANDARD PRODUCT SPECIFICATIONS APPLY AND UNLESS STIPULATED ❑THERWISE IN THE CONTRACT DOCUMENTS, THE METAL BUILDING MANUFACTURER'S DESIGN, FABRICATION, QUALITY CRITERIA STANDARDS AND TOLERANCES WILL GOVERN THE WORK. IN CASE OF DISCREPANCIES BETWEEN METAL BUILDINGS MANUFACTURER STRUCTURAL PLANS AND PLANS FOR OTHER TRADES. THE METAL BUILDING MANUFACTURER'S PLANS SHALL GOVERN. IT IS THE RESPONSIBILITY OF THE BUILDER / CONTRACTOR TO OBTAIN APPROPRIATE APPROVALS AND NECESSARY PERMITS FROM CITY COUNTY, STATE, OR FEDERAL AGENCIES, AS REQUIRED. APPROVAL OF METAL BUILDING MANUFACTURER'S DRAWINGS CONSTITUTES THE BUILDER / CONTRACTOR'S ACCEPTANCE OF THE METAL BUILDING MANUFACTURER'S INTERPRETATION OF THE CONTRACT PURCHASE ORDER. ONCE THE -BUILDER / CONTRACTOR OR A/E FIRM HAS SIGNED MANUFACTURER'S APPROVAL PACKAGE, CHANGES FROM THE PURCHASE ORDER BY THE BUILDER WILL BE BILLED TO THE BUILDER / CONTRACTOR FOR MATERIAL, ENGINEERING AND HANDLING FEES. SUCH CHANGES MAY CAUSE THE PROJECT TO BE MOVED FROM THE FABRICATION AND / OR SHIPPING SCHEDULE. A PENALTY FEE MAY BE CHARGED IF THE PROJECT MUST BE MOVED FROM THE FABRICATION AND / OR SHIPPING SCHEDULE, AS LONG AS THE MANUFACTURER'S DESIGN AND DETAILING APPROACH COMPLIES WITH THE PURCHASE ORDER. THE BUILDER / CONTRACTOR OR A/E FIRM ARE RESPONSIBLE FOR THE OVERALL PROJECT CONDITION. ALL INTERFACE AND-COMPA-T-I-BIL-I-T-Y-CQNGERNING-AN.Y-MATERIALS-NIJLF_URNISHED BY THE MANUFACTURER ARE TO BE CONSIDERED AND COORDINATED BY THE BUILDER / CONTRACTOR OR A/E FIRM. UNLESS SPECIFIC DESIGN-CRITERIA-CONCERNING-THI-S — — -- INTERFACE BETWEEN MATERIALS IS FURNISHED AS PART OF THE PURCHASE ORDER. THE METAL BUILDING MANUFACTURER'S ASSUMPTIONS WILL GOVERN. THE BUILDER / CONTRACTOR IS RESPONSIBLE TO INSURE THAT ALL OTHER PROJECT PLANS AND SPECIFICATIONS COMPLY WITH THE APPLICABLE REQUIREMENTS OF ,ANY GOVERNING BUILDING AUTHORITY. SUPPLYING SEALED ENGINEERING DESIGN DATA AND DRAWINGS BY THE BUILDING MANUFACTURER DOES NOT IMPLY OR CONSTITUTE AN AGREEMENT THAT THE BUILDING MANUFACTURER OR ITS DESIGN ENGINEER IS ACTING AS THE ENGINEER OF RECORD OR DESIGN PROFESSIONAL FOR THE CONSTRUCTION PROJECT. THESE DRAWINGS AND DESIGN DATA ARE SEALED AS TO THE STRUCTURAL SYSTEM FURNISHED BY THE METAL BUILDING MANUFACTURER IN COMPLIANCE WITH ALL REQUIREMENTS OF THE PURCHASE ORDER. THE BUILDER / CONTRACTOR IS RESPONSIBLE FOR SETTING OF ANCHOR BOLTS AND ERECTION OF STEEL BUILDING COMPONENTS IN ACCORDANCE WITH THE METAL BUILDING MANUFACTURER'S 'FOR CONSTRUCTION' DRAWINGS. TEMPORARY SUPPORTS OR BRACING REQUIRED FOR THE BUILDING ERECTION WILL BE THE RESPONSIBILITY OF THE ERECTOR TO DETERMINE, FURNISH, AND INSTALL. THE METAL BUILDING MANUFACTURER DOES NOT WARRANT STRUCTURAL INTEGRITY OF ANY COMPONENTS FIELD MODIFIED OR DESIGNED AND FABRICATED .BY OTHERS. NEITHER DO WE ACCEPT DESIGN RESPONSIBILTY FOR THE EFFECTS NON STANDARD COMPONENTS DESIGNED BY OTHERS MAY HAVE ON THE SYSTEM IN GENERAL. AS TAKEN FROM THE FOURTEENTH EDITION OF THE AISC MANUAL PAGE 16.3-56 PARAGRAPH 7.14 - READS AS FOLLOWS 'THE CORRECTION OF MINOR MISFITS BY MODERATE AMOUNTS OF REAMING, GRINDING, WELDING OR CUTTING, AND THE DRAWING OF ELEMENTS INTO LINE WITH DRIFT PINS, SHALL BECONSIDERED TO BE NORMAL ERECTION OPERATIONS.' SPECIAL NOTES: " BUILDING IS NOT STRUCTURALLY SOUND UNTIL ALL WALL COVERING, ROOF SHEETS, AND PERMANENT BRACING IS INSTALLED. BUILDER / CONTRACTOR IS RESPONSIBLE FOR SUPPORTS OR TEMPORARY BRACING DURING ERECTION,.HE SHALL FURNISH, AND INSTALL THESE TEMPORARY SUPPORTS WHERE NECESSARY. TEMPORARY SUPPORTS ARE NOT PROVIDED BY THE ME=TAL BUILDING MANUFACTURER. OUTSIDE VENDOR ACCESSORY NOTE: BUYER SHALL BE RESPONSIBLE TO COORDINATE, ASSURE AND VERIFY THAT THE STRUCTURE AND CLEARANCES AS PROVIDED BY BUILDING MANUFACTURE ARE COMPATIBLE WITH THE DOOR PROVIDED BY OTHE TUBE SEALAN GUTTER (TRIM VARIES) STANDARD TRIM LAP DETAI NOTE- ALL TRIM CONTAINED ON THIS PROJECT WILL HAVE OURSTANDARD3' LAP AS SHOWN ABOVE. (TRIM STYLE VARIES) PAUL WELCH INC. MECH-ELECT-CIVIL ENG. 1984 BILTMORE ST. #114 PORT SAINT LUCIE, FL 34984>" PAUL WE H R.E. FLA REG N .29945 ; C> tkrjt(on�) THE PROJECT DESIGNER IS NOT THE METAL BUILDING MANUFACTURER, THE METAL BUILDIN DESIGNER OR THE METAL BUILDING ENGINEER. THE ENGINEER WHOSE SEAL APPEARS'ON THE METAL BUILDING PLANS IS A SPECIALTY ENGINEER AND NOT THE PROJECT DESIGNER OR THE PROJECT ENGINEER OF RECORD. THE ENGINEER WHOSE SEAL APPEARS ON THE ' METAL BUILDING PLANS DOES NOT HAVE FAMILIARITY WITH THE PHYSICAL JOBSITE LOCATION AND THEREFORE CANNOT BE IDENTIFIED AS, SERVE AS OR QUALIFY AS THE PROJECT DESIGNER. WALTER E. WOOD P:E. FLORIDA P.E.#-61323 500 . \4UUGANuP.ARK W AY ,;' ��, • �GENse ..0 .' •� o. 6132/3�� STATE OF : Q P,• ° �k' ;cC OR........ R 0 N AX_'r'-lC``'��,. REQUIRED IT12W R = 5/8' c CL 1I 8 _ 1I v a, O o 1ZD d 8' 2' 41 2' -L DETAIL A DiQ= 5/8' c d a - a, a, rn 2' 4' 2' 3 w DETAIL B Dia= 5/8' 6' 3 'I`— w 2° O O po 4' o O I I I 2' LPL 8' I,_0° DETAIL C Dia= 3/4' 8 0 4' 3' k -k -k 8' 2'2' See Plan DETAIL D en M Dia= 3/4' 8 Ld w 3' 0 4' I� f81 — 3' 2 8' 1'-2' DETAIL E Dia= 5/8' See Plan DETAIL F SEE PLANT ' UUT TO 0UCONCRETE L3 SEE PLAN W UUT TO OUT STEEL x - w W PROJECTION • a. • c CONCRETE EDGE AND ANCHOR BOLT PROJECTION WALL PANEL #I2 x 1 1/4' SUS W/WASHER (6' aCJ BASE ANGLE 2'x4'x16GA B Other! WI By Others STD. BASE TRIM NAIL -IN ANCHOR (DTR) a 36' O.C. (BY OTHERS) BASE ANGLE WITH BASE TRIM AND WITHOUT SHEETING NOTCH L L L C L O ANCHOR BOLTS NOTES ANCHOR BOLTS ANCHOR BOLT SUMMARY HEX NUT MANUFACTURER RECOMMENDS USE OF STRAIGHT ROD ANCHOR BOLTS WITH NUT AND WASHER ON BOTH ENDS AS OPPOSED TO J-BOLTS W/FLAT WASHE SEE FOR BUILDING PLANS PROJECTION Dia Pin) CONCRETE LINE Qty Locate (in) Type (in) OR ANCHOR BOLTS WITH HOOKS BECAUSE OF BETTER PERFORMANCE x -- — RESULTS IN CONCRETE FOUNDATIONS. THE TYPE OF BOLT USED FOR 1 O 4 Jamb 5/8' F1554 3.00 THE PROJECT SHALL BE DETERMINED BY THE FOUNDATION ENGINEER w o 20 Endwall 5/8' F1554 3.00 WITH THE BOLT STRENGTH MEETING OR EXCEEDING THAT OF AN J 0 24 Frame 3/4' F1554 3.00 ASTM F1554 GRADE 36 (MIN.) BOLT. HEX NUT W/FLAT WASHE ¢ o r ■ x ■■ TOTAL LENGTH DETERMINED BY FDUNDATICN ENGINEER ■ ANCHOR BOLTS SHALL BE ASTM F1554 GRADE 36 (MIN.) OR GRADE 55 m p� 3• �g X-Bracing io r C F F D D E 22 e B C °9 A CD 6 zC C O N E O O M n C] W Cu I In X N S R D a@ A O 2 I civ B pn0 x D D E o m X-Bracing AT SLAB WITHOUT NOTCH SLAB BEYON FINISHED FLOOR JAMB DEPTH • . 1/2' SECTION 'A -A' 1-3/4' F.O.WIDTH 'A -A' O 3/4' w a 0 J O o o TYP. OVERHEAD DOOR, RECESS DETAIL ANCHOR BOLT PLAN NOTE: All Base Plates @ 100'-0' (U.N.) = 1-3/4' FIELD LOCATED ❑PENINGS QTY: DESCRIPTION: 1 3070 WALKDOOR IN BACK SIDEWALL REVISI❑NS REV. I DESCRIPTION: I lJ iO WALTER E. WOOD P.E. FLORIDA P.E.# 61323 500 VULCAN PARKWAY ADEL, GA 31620 `',,,�t����tUuwuwnrffnyp/f f/ Wo. 61323 -e STATE OF a Q ��.�'•�4OR1�?P••` ORI�GIf/�NAL��/ISIGNATURE REQUIRED DRAWING STATUS VULCAN STEEL STRUCTURES, INC R.K. DAVIS C❑NSTRUCTION C I FINAL ERECTION PROJECT HAMMER HANGAR ANCHOR BOLT PLAN & DETAILS [XI FOR CONSTRUCTION ID 25281 DESIGN:JHB DRAFT: RDP CHECK: BCP- C I FOR APPROVAL PROJECT. DATE: 2/ 7/18 SHEET 1 OF 16 [,I OTHER, EXPLAIN ADDRESS PORT ST. LUCIE, FL 34987 i a T A COLUMN LINE • r IV IV RIGID FRAME: ANCHOR BOLTS & BASE PLATES Frm Col Anc.-Bolt Base_Plate (in) Elev. Line Line Qty Din Width Length Thick (in) 2 A 4 0.750 8.000 10.00 0.500 0.0 • 2 F 4 0.750 8.000 10.00 0.500 0.0 RIGID FRAME: ANCHOR BOLTS & BASE PLATES Frm Col Anc.-Bolt Base -Plate (in) Elev. Line Line Qty Din Width Length Thick (in) 3 A 4 0.750 8.000 10.00 0.500 0.0 3 F 4 0.750 8.000 10.00 0.500 0.0 RIGID FRAME: ANCHOR BOLTS & BASE PLATES Frm Col Anc._Bolt Base -Plate (in) Elev. Line Line Qty Dia Width Length Thick (in) 4 A 4 0.750 8.000 10.00 0.500 0.0 4 F 4 0.750 8.000 10.00 0.500 0.0 BUILDING BRACING REACTI❑NS t Reactions(k ) Panel -Shear -Wall - Col -Wind - -Seismic- (lb/ft) Loc Line Line Horz Vert Horz Vert Wind Seis Note L EW 1 C,D 3.7 3.4 0.1 0.1 F_SW F 2,3 12.0 9.9 0.2 0.2 R EW 4 (h) B SW A 3,2 12.0 9.9 0.2 0.2 [hlRinid-frnme-nt endwnll RIGID FRAME: BASIC -COLUMN REACTIONS (k ) Frame Column -----Dead---- --Collateral- -----Live---- --Wind-Leftl- -Wind_Rightl- Line Line Horiz Vert Horiz Vert Horiz Vert Horiz Vert Horiz Vert 2 A 1.2 2.4 0.4 0.6 4.3 7.2 -23.4 -33.2 -7.4 -20.9 2 F -1.2 2.4 -0.4 0.6 -4.3 7.2 7.4 -20.9 23.4 -33.2 3. A 1.2 2.4 0.4 0.6 4.2 7.0 -22.7 -32.2 -7.2 -20.3 3 F -1.2 2.4 -0.4 0.6 -4.2 7.0 7.2 -20.3 22.7 -32.2 4 A •0.8 2.0 0.1 0.3 1.6 3.8 -10.0 -17.5 -1.5 -11.1 4 F -0.8 2.0 -0.1 0.3 -1.6 3.8 1.5 -11.1 10.0 -17.5 Frame Column -Wind-Right2- --Wind-Longl- --Wind_Long2- -Se.smic_Left Seismtc_Right Line Line Horiz Vert Horiz Vert Horiz Vert Horiz Vert Horiz Vert 2 A -4.5 -11.0 -6.1 -21.6 -6.9 -17.6 -0.1 . 0.0 0.1 0.0 2 F 20.5 -23.2 6.9 -17.6 6.1 -21.6 -0.1 0.0 0.1 0.0 3 A -4.3 -10.6 -5.9 -21.0 -6.7 -17.0 -0.1 0.0 0.1 0.0 3 F 19.9 -22.5 6.7 -17.0 5.9 -21.0 -0.1 0.0 0.1 0.0 4 A -0.7 -5.8 -3.2 -16.1 -3.8 -12.5 0.0 0.0 0.0 0.0 4 F 9.1 -12.3 3.8 -12.5 3.2 -16.1 0.0 0.0 0.0 0.0 ENDWALL COLUMN: ANCHOR BOLTS & BASE PLATES Frm Col Anc._Bolt Base -Plate (in) Elev. Line Line Qty Dia Width Length'Thick (in) 1 A 4 0.625 6.000' 8.000 0.500 0.0 1 C 4 0.625 6.000 8.000 0.500 0.0 1 D 4 0.625 6.000 8.000 0.500 0.0 1 F 4 0.625 6.000 8.000 0.500 0.0 4 E 2 0.625 3.000 6.000 0.134 0.0 4 B 2 ,0.625 3.000 6.000 0.134 0.0 WIND LOADING PRESSURES CHART ((AREA <= 20 SQ.FT. FOR PANELS) MIGLUFOR POSIT vULT)LT)A) vEASD)VENVALE(Vl(VSD(V(V ZONE 1 (ROOF INTERIOR) 23 -55 -33 ZONE 2 (ROOF EDGE) 23 -92 -55 ZONE 3 (ROOF CORNER) 23 -138 -83 ' -ZONE-4-(WALL-INTERIOR)-- ZONE 5. (WALL EDGE) -50-=59__ 50 P30 -67>10 -33 sq. ft. 50 -54>100 sq. ft. 43 -47 -28 NOTE : USE MAXIMUM STATED WALL PRESSURES FOR WINDOWS, LOUVERS, OR ANY OTHER SUCH TYPE ACCESSORY OPENING IN THE METAL BUILDING WALL WHETHER OR NOT THE ACCESSORY IS SUPPLIED BY THE METAL BUILDING MANUFACTURER. DESIGN LOAD DEFINITIONS RIGID FRAME LOAD CASE DEFINITIONS Wind_LI/Wind-Rl = Lateral wind load from the left/right with a negative internal pressure coefficient. Wind_L2/Wind_R2 = Lateral wind load from the left/right with a positive internal pressure coefficient. Wind_Lnl = Longitudinal wind load with a negative internal pressure coefficient. Wind_Ln2 = Longitudinal wind load with a positive internal pressure coefficient. Seismic_L/Seismic_R = Lateral Seismic load from left/right. LWIND#_L#E/ LWIND#_R#E f Longitudinal wind loads for edge zones. F#UNB_SL_L/ F#UNB_SL-R = Unbalanced roof snow load with wind from the left/right. F#PAT_LL # = Pattern live load for continuous beam systems. _ 'Note: Bracing reactions are not already included in combination with -any other load but must be added to basic reactions as desired by the foundation designer.' Collat = Collateral Load Endwall Load Case Definitions 'Rafter Wind_L/ Rafter Wind-R = Lateral wind load from the left/right. Brace Wind_L/ Brace Wind_R = Lateral wind load from the left/right with the bracing loads added. Wind_P/Wind_S = Wind Pressure/Suction due to longitudinal wind. Wind_Ln# = Longitudinal wind load on the roof, Seismic_L/Seismic_R = Lateral Seismic load from left/right. E#UNB_SL_L/ E#UNB_SL_R = Unbalanced roof snow load with wind from the left/right. IE#PAT-LL # = Pattern live load for continuous beam systems.. LWIND#_L/LWIND#_R = Longitudinal wind loads for edge zones. ENDWALL COLUMN: BASIC COLUMN REACTIONS (k ) --Wind_Left2- ' Wind Wind Wind Wind Wind Wind Wind Wind Seis Horiz Vert Vert Frm Col, Dead Collat Live Leftl Rightl Left2 Right2 Press Suct Longl Long2 Left -20.5 Line Line Vert Vert Vert Vert Vert Vert Vert Harz Harz Vert Vert Vert 4.5 -11.0 1 A 0.5 0.1 1.7 -4.7 -2.9 -4.7 -2.9 0.0 0.0 -4.8 -2.7 0.0 -14. -11.0 1 C 1.0 0.2 4.6 -12.4 -7.1 -12.4 -7.1 -7.2 8.0 -12.3 -7.3 0.0 49 -22. 1 D 1.0 0.2 4.6 -7.1 -12.4 -7.1 -12.4 -7.2 8.0 -7.3 -12.3 0.0 -4.1 -10.3 12.3 1 F 0.5 0.1 1.7 -2.9 -4.7 -2.9 -4.7 0.0 -0.0 -2.7 -4.8 0.0 0.1 4 E 0.1 0.0 0.0 0.0 0.0 0.0 0.0 -1.1 1.3 0.0 0.0 0.0 4 B 0.1 0.0 0.0 RO 0.0 0.0 0.0 -1.1 1.3 0.0 0.0 0.0 Seis Frm Col Right Line Line Vert 1 A 0.0 1 C 0.0 1 D 0.0 1 F 0.0 4 E 0.0 4 B 0.0 GENERAL NOTES (1.) APPLICATION OF ENGINEERS SEAL IS FOR METAL BUILDING ONLY AND DOES NOT REPRESENT THE PROFESSIONAL OF RECORD. (2.) FOUNDATION DESIGN AND CONSTRUCTION ARE NOT THE RESPONSIBILITY OF THE METAL BUILDING MANUFACTURER. (3.) ANCHOR BOLTS SHALL BE ACCURATELY SET TO A TOLERANCE OF +/- 1/8, IN BOTH ELEVATION AND LOCATION. (4.) THE BUILDING REACTION DATA REPORTS THE LOADS WHICH THIS BUILDING PLACES ON THE FOUNDATION. THE FOUNDATION IS TO BE DESIGNED BY A QUALIFIED ENGINEER TO SUPPORT THE BUILDING REACTIONS IN ADDITION TO OTHER LOADS IMPOSED BY THE BUILDING USE OR OCCUPANCY WITH RESPECT TO JOB SITE CONDITIONS. (5.) ALL ANCHOR BOLTS TO BE ASTM F1554 GRADE 36 MIN. OR GRADE 55 (UNLESS NOTED) (6.) VALUES GIVEN FOR BENDS AND ANCHOR BOLT TOTAL LENGTHS ARE SUGESTED LENGTHS ONLY. IT IS THE RESPONSIBILITY OF THE FOUNDATION ENGINEER TO DETERMINE THESE VALUES SINCE THEY ARE A FUNCTION OF CONCRETE STRENGTH AS WELL AS OTHER FACTORS. (7J WIND REACTIONS ARE BASED ON Vult. WALTER E. WOOD P.E. FLORIDA P.E.# 61323 500 VULCAN PARKWAY ADEL, GA 31620 ,``,,,,11,d111111111111111 f ql7 - o.61323 •Q - -o • STATE OF `' O�N ALA°E�„1,,���``'`` �0 �O�RIGINAL SIGNATURE REQUIRED REVISIONS DRAWING STATUS CXI FINAL ERECTION C I FOR CONSTRUCTION C I FOR APPROVAL C I OTHER, EXPLAIN VULCAN STEEL STRUCTURES, INC R,K. DAVIS C❑NSTRUCTI❑N REV. DESCRIPTION: DATE DTLR DATE CHKR APPD PROJECT HAMMER HANGAR ANCHOR BOLT DETAILS & REACTIONS ID 25281 DESIGN:JHB I DRAFT: RDP I CHECK: BCP PROJECT ADDRESS PORT ST. LUCIE, FL 34987 DATE: 2/ 7/18 SHEET 2 SPLICE BOLT TABLE Qty Mark Top Bot Int Type Dia Length SP-1 4 4 0 A325 0.750 2.50 SP-2 4 4 0 A325 0.625.2.25 'FLANGE BRACE TABLE FRAMC LINE 2 DID SIDES MARK LENGTH OFFSET 1 FB44.5A 3'-8 1/2' 2'-8' 2 1 FB45.5A 3'-9 1/2' 2'-8' 3 1 FB38.5A 3'-2 1/2' 2'-8' 4 1 FB42A 3'-6" 2'-8' P Ql• 12 TYP. FLANGE BRACE / GIRT C❑NNECTI❑N OFFSET (TYP 1/2'xl 1/4' A30(TYP. U.N.) BOLTS TYP. U.N.) io 0 [-1 0 0 urrci 1/2'xl 1/4' A307 BOLTS 0 0 FLANGE BRACE A SECOND FLANGE SEE FRAME CROSS BRACE IS REQUIRED ,�� IF '(2)' IS NOTED IN THE FLANGE BRACE TABLE. R.F. COLUMN/RAFTER SEE FRAME CROSS SECTION 6 BOLTS TOTAL FOR LOCATIONS. ADDITIONAL HOLES ARE PRESENT FOR ALIGNMENT PURPOSES ONLY RC—R26 W MEMBER TABLE Mark Web Depth Web Plate Outside W x Flange Thk x Lent Start/End Thick Length RF1-1 RF1-2 RF1-3 9.5/28.5 28.5/28.5 27.5/11.5 11.5/11.5 11.5/11.5 11.5/27.5 0.165 0.250 0.188 0.188 0.188 0.188 178.6 31.7 144.9 180.0 180.0 144.9 6 6 6 6 6 6 x x x x x x 1/4' 1/4' 1/4.' 1/4' 1/4' 1/4° x x x x x x 2073 36.9 240.0 82.6 82.6' 240.0 r 12 nside Flange W x Thk x Length 6 x 1/4' x 179.5 6 x 1/4' x 145,8 6 x 1/4' x 179.0 6 x 1/4' x 179.0 6 x 1/4' x 145.8 v R � a �o z e WALTER E. WOOD P.E. FLORIDA P.E.# 61323 500 VULCAN PARKWAY ADEL, GA 31620 L-5' 53-10' 2-5'• 8' `„tttptuuuuquerppn `�i �R E.•. lAi''�•h, +,� '� .,... Q �i- ` CLEARANCE F� GENERAL NOTES: x N❑TICE TO ERECTOR )K -------------------------- (A)It is IMP❑RTANT that for members exceeding 30 ft. in length that a spreader bar be used when lifting, (B)ALL flange braces and wind bracing Must be installed prior to exterior finishes being applied, MAIN FRAME ELEVATI❑N: FRAME LINE 2 REVISI❑NS RFv. I DESCRIPTION: 0.61323 - -' ,o STATE 0 • c ,= ORIGINAL SIGNATURE REQUIRED DRAWING STATUS VULCAN STEEL STRUCTURES, INC RX DAVIS C❑NSTRUCTI❑N E I FINAL ERECTION PROJECT HAMMER HANGAR MAIN FRAME ELEVATION [XI FOR CONSTRUCTION C I FOR APPROVAL ID 25281 DESIGN:JHB I DRAFT: RDP I CHECK: JDH C I OTHER, EXPLAIN PROJECT ADDRESS PORT ST. LUCIE, FL 34987 DATE: 2/ 7/18 SHEET 3 SPLICE BOLT TABLE Qty Mark Top Bot Int Type Dia Length SP-1 4 4 0 A325 0.750 2.50 SP-2 4 4 0 A325 0.625 2.25 'FLANGE BRACE TABLE FRAME LINE 3 rDID SIDES MARK LENGTH OFFSET 1.' 1 FB44.5A 3'-8 1/2" 2'-8' 2 1 FB45.5A 3'-9 1/2' 2'-8' 3 1 FB38.5A 3'-2 1/2' 2'-8' 4 1 FB42A 3'-6' 2'-8' —1 9 lz1' 12 MEMBER TABLE TYP. FLANGE BRACE / GIRT CONNECTION Web Depth Web Plate' Outside Flange Inside Flange OFFS8ET 1/2•x1 1/a• Mark W x Thk x Length W x Thk x Len l Start/End Thick Len th RF2-1 9.5/28.5 0.165 178.6 6 x 1/4' x 207.9 6 x 1/4' x 179.5 A307 BOLTS (TYP. U.N.) (TYP. U.N.) 28.5/28.5 0.250 31.7 6 x 1/4' x 36.9 10 ° RF2-2 27.5/11.5 0.188 144.9 6 x 1/4' x 240.0 6 x 1/4' x 145.8 i 11.5/11.5 0.188 180.0 6 x 1/4' x 82.6 6 x 1/4' x 179.0 RF2-3 11.5/11.5 0,188 180.0 6 x 1/4' x 82.6 6 x 1/4' x 179.0 ..... __.. P 11.5/27.5 0.168 144.9 6 x 1/4' x 240.0 6 x 1/4' x 145.8 elm l 1/2'xl 1/4' A307 BOLTS ° ° A SECOND FLANGE FLANGE BRACE BRACE IS REQUIRED SEE FRAME CROSS IF '(2)' IS NOTED IN THE FLANGE BRACE TABLE. R.F. COLUMN/RAFTER SEE FRAME CROSS SECTION 6 BOLTS TOTAL FOR LOCATIONS. ADDITIONAL HOLES ARE PRESENT FOR ALIGNMENT PURPOSES ONLY RC-R26 WAS rtr'-5' 53-10' 2-5- CLEARANCE GENERAL NOTES: X NOTICE TO ERECTOR )K -------------------------- (A)It is IMPORTANT that for members exceeding 30 ft, in length that a spreader bar be used when lifting. (B)ALL flange braces and wind bracing Must be installed prior to exterior finishes being applied, MAIN FRAME ELEVATION; FRAME LINE 3 REVISIONS C 3 FINAL ERECTION [X3 FOR CONSTRUCTION I I FOR APPROVAL 13 OTHER, EXPLAIN 1; r y 12 VULCAN STEEL STRUCTURES, INC PROJECT HAMMER HANGAR ID 25281 PROJECT PORT ST. LUCIE, FL 34987 ADDRESS J WALTER E. WOOD P.E. FLORIDA P.E.# 61323 500 VULCAN PARKWAY ADEL, GA 31620 �Q` :• �,�cENsF �• Oj. . o.61323 STA EOF SIONA _71- ORIGINAL SIGNATURE REQUIRED R,K, DAVIS CONSTRUCTION MAIN FRAME ELEVATION DESIGN: JHB I DRAFT: RDP I CHECK: J] DATE: 2/ 7/18 1 SHEET 4 SPLICE BOLT TABLE Qty Mark Top Bot Int Type Dia Length SP-1 4 4 0 A325 0.625 2.25 FLANGE BRACE.TABLE 'FRAME LINE 4- DID SIDES MARK LENGTH 1OFFSET 1 1 FB43.5A 3'-7 1/2" 2'-8' Ql' 12 21 GENERAL NOTES: x N❑TICE TO ERECTOR -------------------------- (A)It is IMP❑RTANT that for members exceeding 30 ft. in Length that a spreader bar be used when lifting. (B)ALL flange braces and wind bracing must be installed prior to exterior finishes being applied. TYP. FLANGE BRACE / GIRT C❑NNECTI❑N MEMBER TABLE Mark Web Depth Web Plate OFFSET 2'-8• rL 12'xl 1/4• (TYP. U.N.) A307 BOLTS (TYP. U.N.) Start/End Thick Len - RF3-1 RF3-2 9.4/19.4 19.4/19., 22.4/22.4 22.4/22.4 0.120 0.165 0.165 0.135 182.9 26.6 93.8 240.0 i ° i iL4�3 ° ° i RF3-3 22.4/22.4 0,135 240.0 �.R 1/2'xl 1/4' A307 BOLTS ° ° A SECOND FLANGE FLANGE BRACE BRACE IS REQUIRED p)�� SEE FRAME CROSS IF '(2)' IS NOTED IN THE FLANGE BRACE TABLE. R.F. COLUMN/RAFTER SEE FRAME CROSS SECTION 6 BOLTS TOTAL FOR LOCATIONS. ADDITIONAL HOLES ARE PRESENT FOR ALIGNMENT PURPOSES ONLY RC-R26 n jutisiae r Lange d x Thk x Length 6 x 5/16' x 207,E 6 x 5/16' x 27.8 6. x 5/16' x 240.0 6 x 5/16" x 91.9 6 x 5/16' x 91.9 6 x 5/16' x 240.0 55-4' 1'-8 CLEARANCE I MAIN FRAME ELEVATI❑N: FRAME LINE 4 REVISI❑NS REV. DESCRIPTION: N Inside Flange W x Thk x Lengtr 6 x 5/16' x 183.2 6 x 5/16' x 240.0 6 x 5/16' X 91.9 6 x 5/16' x 91.9 c — �- /tc" — Oenn WALTER E. WOOD P.E. FLORIDA P.E.# 61323 500 VULCAN PARKWAY ADEL, GA 31620 ?�P '��GENSF No. 6132 STATE OF ORIGINAL SIGNATURE REQUIRED DRAWING STATUS VULCAN STEEL' STRUCTURES, INC R.K. DAVIS C❑NSTRUCTI❑N I I FINAL ERECTION PROJECT HAMMER HANGAR MAIN FRAME ELEVATION 1XI FOR CONSTRUCTION ID 25281 DESIGN:JHB I DRAFT: RDP CHECK JDH C I 1 1 FOR APPROVAL OTHER, EXPLAIN PROJECT PORT ST. LUCIE, FL 34987 DATE: 2/ 7/18 SHEET 5 ADDRESS a /-#12 MEMBER FASTENERS PANEL FASTENER SPACING AT EAVE STRUTS ENDLAPS, AND BASE AND ZONE 3 #14 STITCH FASTENERS ZONE 5 - _20'_ O/C MAX. ZONE 4 - @ ALL GIRTS & _ 20'_ O.C. MAX. BETWEEN GIRTS DETAIL 'A' = ZONE 4 DIM W = 6 FT 5 = ZONE 5 'PBR' WALL PANEL ATTACHMENT DETAIL 36' NOMINAL COVERAGE 1-1/4' 'PBR' WALL PANEL PROFILE REVISI❑NS REV. DESCRIPTION: DETAIL :IFIC ROOF AND/OR WALL FASTENER A" � #12 MEMBER FASTENERS 2EVIEW THIS DETAIL PRI❑R TO ERECTING L S. FAILURE T ❑ FOLLOW THESE SPECIFIC PANEL FASTENER SPACING AT INTERMEDIATE PURLINS :SULT IN LOSS OF ROOF OR WALL PANEL( ). 1 5' 1 7' ,5,j 7' 5. 7' ROOF SLOPE 0 TO 70 WALL FASTENER DETAIL PLAN E I FINAL ERECTION EX] FOR CONSTRUCTION E I FOR APPROVAL E I OTHER; EXPLAIN #12 MEMBER FASTENERS PANEL FASTENER SPACING AT EAVE STRUTS ENDLAPS, AND RIDGE. AND ZONE 3 #14 STITCH FASTENERS TAPE MASTIC ZONE 3 - _10' _ O/C MAX. ZONE 2 - 151_ O/C MAX. ZONE 1 - @ ALL PURLINS & _ 20__ O.C. MAX. BETWEEN PURLINS DETAIL 'A' 1 = ZONE 1 DIM A= 6 , FT 2 = ZONE 2 3 = ZONE 3 'PBR' ROOF PANEL ATTACHMENT DETAIL 36' NOMINAL COVERAGE 'PBR' ROOF PANEL PR❑FILE PGBLESS7 VULCAN STEEL STRUCTURES, INC PROJECT HAMMER HANGAR ID 25281 PROJECT PORT ST.-LUCIE, FL 34987 ADDRESS WALTER E. WOOD P.E. FLORIDA P.E.# 61323 500 VULCAN PARKWAY ADEL, GA 31620 ,"1`1�pQu u t u uFu � r ryi �PO.•v�� NSA.,• ,jVo.61323 WA &— :, STATE �! • v%�/ %� I r�nnuunnt�u����� ORIGINAL SIGNATURE REQUIRED RX DAVIS C❑NSTRUCTI❑N ROOF SHEETING DESIGN: JHB I DRAFT: RDP I CHECK: JDH DATE: 2/ 7/18 1 SHEET 6 (U U W M U I W � M N E3 C3 m F i U W PURLIN LAP GRIP BRACE CABLE ASSEMBLY CABLE HARDWARE FACTORY ATTACHED SYMMETRICAL AT BOTH ENDS 3 20-0' 1'-2' RF2-1 E-2 �ll RF3-1 P-1(T > -2(T P-3(T ) RF2-2 H G2 C -3 ER-1 RFI-2 .A c& GB 5 Cgs P-2(Typ) - of P-4(TYp) P-3(Typ) H — ER-1 �RF3 CB,3 Cg,3 RF2-3 F Hi 1-1 3/'_ I'-1 3/4_ 1'-I 3/4' 1'-1 3/4' R❑❑F FRAMING PLAN REVISI❑NS REV. DESCRIPTION: DATE D' r) -2 J 3-3 J W RF3-1 r-1 OACJLIL) C1--1 1/C- P-2 8X25Z15 22'-3 1/2' P-3 8X25Z15 21'-1 1/2' P-4 8X25Z15 21'-1 1/2' E-1 8E275D16 19'-11 1/2' E-2 8E275D16 19'-11 1/2' E-3 8E275D16 19'-11 1/2' CB-3 0.375CBL 21'-2' CB-4 0.312CBL 24'-7' f R-S n aSnf Tzi aa_7• WALTER E. WOOD P.E. FLORIDA P.E.# 61323 500 VULCAN PARKWAY ADEL, GA 31620 `1,dtl1pp111 u n 11 a upr� yr,!!/' i _- No.61323 1 STATE bF ' J. NAt `t V �///�!/L'j'7111f111.1111111111j1`1`1 ORIGGIN.AAL SIGNATURE REQUIRED DRAWING STATUS VULCAN STEEL STRUCTURES, INC R.K. DAVIS C❑NSTRUCTI❑N C I FINAL 'ERECTION PROJECT HAMMER HANGAR EASTERNER DETAILS [XI FOR CONSTRUCTION C I FOR APPROVAL ID 25281 DESIGN:JHB DRAFT: RDP I CHECK: JDH C I OTHER, EXPLAIN PROJECT ADDRESS PORT ST. LUCIE, FL 34987 DATE: 2/ 7/18 1 SHEET 7 9 m WALTER E. WOOD P.E. FLORIDA P.E.# 61323 500 VULCAN PARKWAY - ADEL, GA 31620 `ttt`tµMtNtOtltgtpbi(r�tigrri Q- E1Vs • o. 6132 STATE OF ROOF SHEETING PLAN � PANELS: 26 Ga. PBR - Galvalune _ �yOj(�� ""''�,•,S�ONAL //Z/fig.»,�,,,�,.�1„t,,,,,,t•�� ` ORIGINAL SIGNATURE REQUIRED REVISIONS DRAWING STATUS C I FINAL ERECTION CXJ FOR CONSTRUCTION C I FOR APPROVAL C I OTHER, EXPLAIN VULCAN STEEL STRUCTURES, INC RX DAVIS C❑NSTRUCTI❑N REV. DESCRIPTION: DATE DTLR DATE CHKR APPD PROJECT HAMMER HANGAR ROOF SHEETING ID 25281 DESIGN:JHB DRAFT: RDP I CHECK: JDH PROJECT ADDRESS PORT ST. LUCIE, FL 34987 DATE: 2/ 7/18 SHEET 8 SPECIAL BOLTS . O ID QUAN TYPE DIA LENGTH WASH 1 1 4 A307 1/2' 1 1/4' 0 MEMBER TABLE FRAME LINE F MARK PART LENGTH E-1 8E275D16 19'-11 1/2' E-2 8E275D16 19'-11 1/2' G-9 8X25Z16 21'-1 1/2' G-10 8X25Z15 21'-1 1/2' G-11 8X25Z16 22'-3 1/2' G-12 8X25Z16 21'-1 1/2' CB-2 0.5000BL 1 26'-6' C❑NNECTI❑N PLATES FRAME LINE F ❑ID MARK/PART 1 Cl OF.n'-n' np lT-Tn-ni [T nr QTrrl 2 3 20'-0' 20'-0' 20'-0' l• E-I J4 E-2 E-2 IL G-9 G-11 G-12 G-10 G-11 G-12 z G_g G-1 G-12 - BASE ANGLE A' OPEN T❑ 4'-0" • v FOR MASONRY BY OTHERS BA 17 I EC-1 GIRT LAPS GF.NERAL NOTES: J. 1 RF1-1 RF2-1 1'-1 3/4'1'-1 3/4' 1'-1 3/4' 1'-1 3/4' SIDEWALL FRAMING: FRAME LINE F (1,) IF CABLE BRACING, WIND BENTS, WIND COLUMNS, OR WEAK AXIS DESIGN OF SIDE WALL COLUMNS WERE NOT PR❑VIDED IT HAS BEEN DETERMINED THAT DIAPHRAGM PANEL ACTION IS SUFFICIENT TO RESIST IN -PLANE WIND FORCES. TEMPORARY BRACING SHOULD BE PROVIDED BY ERECTOR UNTIL ALL WALL AND ROOF PANELS ARE INSTALLED. (2.) ADDITIONAL GIRTS MAY BE PRESENT IN THE END OR CORNER BAYS OF THIS WALL ELEVATION. THESE ARE REQUIRED TO SATISFY CODE -DEFINED CORNER ZONE WIND PRESSURES IN ORDER TO PROVIDE THE MOST ECONOMICAL BUILDING POSSIBLE, THESE GIRTS ARE NOT INCLUDED FOR THE FULL LENGTH OF THE WALL, NON -UNIFORM GIRT SPACING OR RESULTING APPEARANCE IS NOT A CAUSE FOR COMPLAINT OR REJECTION. REVISI❑NS REV. DESCRIPTION: 1 RF3-1 - WALTER E. WOOD P.E. FLORIDA P.E.# 61323 500 VULCAN PARKWAY ADEL, GA 31620 " ,,,iiNitiiliUNlttllppialrfh I • • �O i= Base Angle Feld Attach Ta Mo=o,•Y BY ot��= _ • No. 6132 = 3 _ o STATE OF — SECTION SECTION 'A' MASONRY BY OTHERS S •"'•" ` 8/0 NAIL ORIGINAL SIGNATURE REQUIRED DRAWING STATUS VULCAN STEEL STRUCTURES, INC R,K, DAVIS C❑NSTRUCTI❑N E I FINAL ERECTION PROJECT HAMMER HANGAR SIDEWALL FRAMING [XI FOR CONSTRUCTION 'ID 252B1' DESIGN: JHB I DRAFT: RDP CHECK: JDH E I FOR APPROVAL E I OTHER, EXPLAIN PROJECT PORT ST. LUCIE, FL 34987 DATE: 2/ 7/18 SHEET 9 ADDRESS T � T (Gutter with 4 downspouts) El q 5 3O 4 5 0 0 0 o o OPEN TO 4'-0" FOR MASONRY BY ❑THERS c GENERAL NOTES: (1.) IF CABLE BRACING, WIND BENTS, WIND COLUMNS, OR WEAK AXIS DESIGN OF SIDE WALL COLUMNS WERE NOT PR❑VIDED IT HAS BEEN DETERMINED THAT DIAPHRAGM PANEL ACTION IS SUFFICIENT TO RESIST IN -PLANE WIND FORCES. TEMPORARY BRACING SHOULD BE PROVIDED BY ERECTOR UNTIL ALL WALL AND ROOF PANELS ARE INSTALLED. (2.) ADDITIONAL GIRTS MAY BE PRESENT IN THE END OR CORNER BAYS OF THIS WALL ELEVATION. THESE ARE REQUIRED TO SATISFY CODE -DEFINED CORNER ZONE WIND PRESSURES IN ORDER TO PR❑VIDE THE MOST EC❑N❑MICAL BUILDING POSSIBLE, THESE GIRTS ARE NOT INCLUDED FOR THE FULL LENGTH OF THE WALL. N❑N-UNIF❑RM GIRT SPACING OR RESULTING APPEARANCE IS NOT A CAUSE FOR C❑MPLAINT OR REJECTI❑N. SIDEWALL SHEETING & TRIM: FRAME LINE F PANELS: 26 Ga. PBR - ALMOND 2 DTR 20'-3' 3 RVEG 20'-3' 4 RVCB 6' TM50 TM52 WALTER E. WOOD P.E. FLORIDA P.E.# 61323 500 VULCAN PARKWAY ADEL, GA 31620 11`1lllpllll 111 l ltl l lgflyfry No. 61323 Ai E OF :.OR10P. - ORIGINAL SIGNATURE REQUIRED REVISIONS DRAWING STATUS E.3 FINAL ERECTION EX3 FOR C❑NSTRUCTION E 3 FOR APPROVAL E 3 OTHER, EXPLAIN VULCAN STEEL STRUCTURES, INC RX DAVIS C❑NSTRUCTI❑N REV. DESCRIPTION: DATE DTLR DATE CHKR APPD PROJECT HAMMER HANGAR SIDEWALL FRAMING ID 25281 DESIGN:JHB I DRAFT: RDP CHECK: JDH PROJECT ADDRESS PORT ST. LUCIE, FL 34987 DATE: 2/ 7/18 ISHEET 10 I Cl 8 C6 G-4 -5 G-6 G-7 G-6 - G-8 LAJ , ® HB-1 HB-2 HE 3 HB-2 HB-1 G-4 G-8 b 3 G-4 OPEN FOR N m HANGAR DOOR Ll 2 N2 = m a �W m 6 G-8 Ai BY OTHERS BASE ANGLE � BASE ANGLE 0 a I 0 a BA I I . I EC-4 EC-5 EC-6 EC-6 ENDWALL FRAMING; FRAME LINE 4 OPEN TO 4'-0" FOR MASONRY ZY OTHERS GENERAL NOTES: Ct,9 IF CABLE BRACING FOR END WALL IS NOT SHOWN ON ERECTI❑N DRAWINGS IT HAS BEEN DETERMINED THAT DIAPHRAGM PANEL ACTI❑N OR QUARTER -PANEL BRACING IS SUFFICIENT TO RESIST IN -PLANE WIND FORCES. TEMPORARY BRACING SHOULD BE PR❑VIDED BY ERECTOR UNTIL ALL WALL AND ROOF PANELS ARE INSTALLED, (2.) ADDITIONAL GIRTS MAY BE PRESENT IN THE END OR CORNER BAYS OF THIS WALL ELEVATI❑N. THESE ARE REQUIRED TO SATISFY C❑DE-DEFINED CORNER ZONE WIND PRESSURES IN ORDER T❑ PROVIDE THE MOST ECONOMICAL BUILDING POSSIBLE, THESE GIRTS ARE NOT INCLUDED FOR THE FULL LENGTH OF THE WALL. NON-UNIT❑RM GIRT SPACING OR RESULTING APPEARANCE IS NOT A CAUSE FOR COMPLAINT OR REJECTI❑N. REVISI❑NS REV. I DESCRIPT EC-5 l� �r SECTION AT, HANGAR STUBS HB-2 8x35C16 9'-4 1/2' 1 HB-3 8x35C16 7'-4 1/2' 12 BB-1 P6x.125 19'-2 7/16' BB-2 P6x.125 19'-3 3/4' EC-4 8x35C16 17'-7 15/16' EC-5 W8X10 3'-9 7/16' EC-6 W8X10 4'-7 7/16' G-4 8X25Z16 5'-0' G-5 8X25Z16 9'-8. G-6 8X25Z16 9'-4 1/2' G-7 8X25Z16 7'-4 1/2' I U/a 2 nl 3 n2 4 C-5 5 CG2 WALTER E. WOOD P.E. FLORIDA P.E.# 61323 ,U 500 VULCAN PARKWAY ADEL, GA 31620 �,.LL t`tttttta.untunauw„ „�,y��i ,um, can _1N c�•Q-. Y _ �•• No.61323 ' - -a : STATE OF -.O••, �. Qom. ---+�+� SECTION AT HANGAR STUBS ONAI-�N •� ORIGINAL SIGNATURE REQUIRED DRAWING STATUS VULCAN STEEL STRUCTURES, INC R,K, DAVIS CONSTRUCTI❑N C I FINAL ERECTION PROJECT HAMMER HANGAR ENDWALL FRAMING CXI FOR CONSTRUCTION ID 25281 DESIGN:JHB I DRAFT: RDP CHECK: J C I FOR APPROVAL C I OTHER, EXPLAIN PROJECT PORT ST. LUCIE, FL 34987 DATE: 2/ 7/18 SHEET 15 ADDRESS TRIM TABLE FRAME LINE 4 >ID PART LENGTH DETI 1 CTR 14'-3' TM2' 2 DTR 6'-3' 3 RVRT 20'-3' TMlI 4 RVRT 10'-5' TMlI Ql• � I= 12 I I I • O n En N In In In N Qj O .Q Q Q Q N I I Q .Qr OPEN FOR HAN_G_A.R -D- ❑D R - BY OTHERS 2 BASE ANGLE GENERAL NOTES: IF CABLE BRACING FOR END WALL IS NOT SHOWN ON ERECTI❑N DRAWINGS IT HAS BEEN DETERMINED THAT DIAPHRAGM PANEL ACTI❑N ❑R QUARTER -PANEL BRACING IS SUFFICIENT TO RESIST IN -PLANE WIND FORCES. TEMPORARY BRACING SHOULD BE PR❑VIDED BY ERECTOR UNTIL ALL WALL AND ROOF PANELS ARE INSTALLED. (2.) ADDITI❑NAL GIRTS MAY BE PRESENT IN THE END OR CORNER BAYS'❑F THIS WALL ELEVATI❑N. THESE ARE REQUIRED TO SATISFY C❑DE-DEFINED CORNER ZONE WIND PRESSURES IN ORDER TO PR❑VIDE THE MOST EC❑NOMICAL BUILDING POSSIBLE, THESE GIRTS ARE NOT INCLUDED FOR THE FULL LENGTH OF THE WALL, N❑N-UNIF❑RM GIRT SPACING OR RESULTING APPEARANCE IS NOT A CAUSE FOR COMPLAINT OR REJECTION. ENDWALL SHEETING & TRIM: FRAME LINE 4 PANELS. 26 Ga. PBR — ALMOND REVISIONS I O i N I WALTER E. WOOD P.E. FLORIDA P.E.# 61323 500 VULCAN PARKWAY ADEL, GA 31620 lirrel��,'o,., •'` • v �4 \� cNSF '�0�'--- No.61323 STATE OF : ' ❑RIGINAL SIGNATURE REQUIRED DRAWING STATUS VULCAN STEEL STRUCTURES, INC R,K, DAVIS CONSTRUCTION C I FINAL ERECTION PROJECT IHAMMER HANGAR ENDWALL FRAMING [XI FOR CONSTRUCTI❑N ID 125291 DESIGN:JHB DRAFT: RDP I CHECK: JDH C I FOR APPROVAL C I EITHER, EXPLAIN PROJECT PORT ST. LUCIE, FL 34987 DATE: 2/ 7/18 1 SHEET 16 ADDRESS