Loading...
HomeMy WebLinkAbout30 DAY TEMPORARY POWER RELEASE-i� �f Planar Build 00 Fort l Request for Date. Z�4 h 5 Prv1ect Address: > ` 0 "3 j T� -UNbERSIGNEb Y RED RELE PROPEJM, FOR A' 7PERIOD NOT TO EXCEED AND EQUIPMENT IN PREPARATION- FOR A F. REQUEST WE HEREBY ACKNOWLEDGE AND. I. This teMPorary power release Is retlues. 00CUpwxy of any type, d her than that 2. As h b. ess "ley our signabzes, we hembl !nC[ dfng ;building DWIsion Policy, which 3. All --onditions agd %requIrem. eats listed in Power for Tesdng'l' have been fuMlied aj 4. Ali requests fbr a6 extension beyond 30 the reason for the request. Power ri ney the Final InspeWon has not been ai two the Stop Work Order, RECEIVED velopment Servi cm 0 C T .2 5 2018 Code RegUll"'On `"e ceunty, Permitting ifla Ave r F..-i+4i82 Fax 772-462 3 POVLI �' Release Permit Number: _ L S61 - 05� h ELECTRICAL POWER TO THE ABOVJ= 6EI Y (30) DAYS, FOR THE PURPOSE OF TEMNC SYSTEMS ISPEC1710N. IN CONSIDERAi'ION OF APPROVAL OF THE .AS..DLL0W5: For the above stated Pavow -ortlyY, and ` e-j ill be no nifted by construction during ttfm time perlod•: ` ree to abide by ail terms and conditions of.thls ogreement, icoWated hetein. by reference. attached document entitled''RegtftenneMS1br;30 flay ie premise is ready for =pliance fhspeclion. s must be *made in writing to the Buildi'hg-bTtAl`stating emoW from the site and/or a Stop work Order issued if wk hin W days. A fee of $100.M-,Mlf be regWied. to gift. V1rE HERBY R>TLEASE AND AGREE TO ff= H }�ll_.ESS, ST. LUCIE COUNTY, AND THEIR EMPLOYEES FWM ALL I.TABILMES AND QLAIMS, CF ANY TYPE OF NATURE WHICH MAY ARMS NOW OR IN THE FUTURE OUT OF THIS TRANSACTION, INCLUDING'ANY DA GE WHICH MAY BE INCURRED DUE TO T14E" DISCOhINEC�Lt +3 C3F ELECTRICAi. POWER IN E EVENT OF VIOL ROAN OF THIS AG1X�ME . DATE to DATE ELSMICAL