HomeMy WebLinkAbout30 DAY TEMPORARY POWER RELEASE-i�
�f
Planar
Build
00
Fort l
Request for
Date. Z�4 h 5
Prv1ect Address:
> ` 0 "3 j
T� -UNbERSIGNEb Y RED RELE
PROPEJM, FOR A' 7PERIOD NOT TO EXCEED
AND EQUIPMENT IN PREPARATION- FOR A F.
REQUEST WE HEREBY ACKNOWLEDGE AND.
I. This teMPorary power release Is retlues.
00CUpwxy of any type, d her than that
2. As h b. ess "ley our signabzes, we hembl
!nC[ dfng ;building DWIsion Policy, which
3. All --onditions agd %requIrem. eats listed in
Power for Tesdng'l' have been fuMlied aj
4. Ali requests fbr a6 extension beyond 30
the reason for the request. Power ri ney
the Final InspeWon has not been ai two
the Stop Work Order,
RECEIVED
velopment Servi cm 0 C T .2 5 2018
Code RegUll"'On `"e ceunty, Permitting
ifla Ave
r F..-i+4i82
Fax 772-462 3
POVLI �' Release
Permit Number: _ L S61 - 05� h
ELECTRICAL POWER TO THE ABOVJ= 6EI
Y (30) DAYS, FOR THE PURPOSE OF TEMNC SYSTEMS
ISPEC1710N. IN CONSIDERAi'ION OF APPROVAL OF THE
.AS..DLL0W5:
For the above stated Pavow -ortlyY, and ` e-j ill be no
nifted by construction during ttfm time perlod•: `
ree to abide by ail terms and conditions of.thls ogreement,
icoWated hetein. by reference.
attached document entitled''RegtftenneMS1br;30 flay
ie premise is ready for =pliance fhspeclion.
s must be *made in writing to the Buildi'hg-bTtAl`stating
emoW from the site and/or a Stop work Order issued if
wk hin W days. A fee of $100.M-,Mlf be regWied. to gift.
V1rE HERBY R>TLEASE AND AGREE TO ff= H }�ll_.ESS, ST. LUCIE COUNTY, AND THEIR EMPLOYEES FWM
ALL I.TABILMES AND QLAIMS, CF ANY TYPE OF NATURE WHICH MAY ARMS NOW OR IN THE FUTURE OUT
OF THIS TRANSACTION, INCLUDING'ANY DA GE WHICH MAY BE INCURRED DUE TO T14E"
DISCOhINEC�Lt +3 C3F ELECTRICAi. POWER IN E EVENT OF VIOL ROAN OF THIS AG1X�ME .
DATE
to
DATE
ELSMICAL