SCOPE:
This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of
construction materials in the State of Florida. The documentation submitted has been reviewed by Robert Nieminen,
P.E. for use of the I a Bui`jdin Code. The product described herein has been evaluated for
compliance with th 6`h Edition (2017) Florida Builll ing Co a ctions noted herein.
DESCRIPTION: TRI-BUILT Modified Bitumen Roof Systems
LABELING: Labeling shall be in accordance with tl
herein.
CONTINUED COMPLIANCE: This Evaluation Report is va
Quality Assurance documentation changes, or prov
this Evaluation Report by the named client consl
changes or the referenced Quality Assurance docul
Evaluation Report relative to updated Code require
ADVERTISEMENT: The Evaluation Report number pre
advertising literature. If any portion of the Evaluati
INSPECTION: Upon request, a copy of this entire Eval
its distributors and shall be available for inspection
e requirements the Accredited Quality Assurance Agency noted
This Evaluation Report consists of pages 1 through 4,
Prepared by:
Robert J.M. Nieminen, P.E.
Florida Registration No. 59166, Florida DCAANE1983
I until such time as the named product(s) changes, the referenced
ons of the Code that relate to the product change. Acceptance of
utes agreement to notify Robert Nieminen, P.E. if the product
rotation changes. Trinity I ERD requires a complete review of this
ents with each Code Cycle.
ded by the words "Trinity I ERD Evaluated" may be displayed in
I Report is displayed, then it shall be done in its entirety.
ition Report shall be provided to the user by the manufacturer or
the job site at the request of the Building Official.
a 26-page Appendj�,
.ESE PLANS
AND ALL PROPOSED WORK
ARE SUBJECT TO ANY CORRECTIONS
REQUIRED BY FIELD INSPECTORS THAT
.•```»:''':ram'.,
MAY BE NECESSARY IN ORDER.TO'
�:;
COMPLY WITH ALL APPLICABLE CODES.
The facsimile seal appearing was authorized by Robert Nieminen,
P.E. on 09/25/2017. This does not serve as an electronically signed
document.
CERTIFICATION OF INDEPENDENCE:
1. Exterior Research & Design, LLC. d/b/a Trinity I ERD does not have, nor does it intend to acquire or will it acquire, a financial interest
in any company manufacturing or distributing products it evaluates.
2. Exterior Research & Design, LLC. d/b/a Trinity I ERD is 'not owned, operated or controlled by any company manufacturing or
distributing products it evaluates.
3. Robert Nieminen, P.E. does not have nor will acquire, a flnincial interest in any company manufacturing or distributing products for
which the evaluation reports are being issued.
4. Robert Nieminen, P.E. does not have, nor will acquire, a financial interest in any other entity involved in the approval process of the
product.
5. This is a building code evaluation. Neither Trinity IERD nJ Robert Nieminen, P.E. are, in any way, the Designer of Record for any
project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained
specifically for that purpose.
FOM (t��&03— p 6 13 CONCEALED FASTENERS OR ATTACHMENTS
ST. LUCIE COUNTY BUILDING DIVI ARE THE RESPONSIBILITY OF THE ON �2�cPL CONTRACTOR OR RECORD
REVIEWED FOR C N � I
REVIE.�lE Y /
DATE) ,e I
PLANS AND PERMIT MU T BE KEPT ON JOB �FILE COPY
SITE OR NO INSPECTION(S) WILL BE MADE
I
rTRINITYIERD
-
APPENDIX S,A- ACHMENT REQUIREMENTS FOR WIND UPLIFT RESISTANCE
Table (wbeck' Application N'', =- Type Description Page
1A-1
t-W,.00d
New or Reroof (Tear -Off) _ _ A-2
Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover
4
-1A-21A%ood
New, Reroof (Tear -Off) or Recover - A-2
Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover
5
1B7z1No6"d
New, Reroof (Tear -Off) or Recover_ - ; , -, =:. B
Mech. Attached Base Insulation, Bonded Top Insulation, Bonded Roof Cover
5
. •1C
4=' Wood
New, Reroof (Tear -Off) or Recover_.,: C
Mech. Attached Insulation, Bonded Roof Cover
6
_ iD
Wood
�.° `i.
New, Reroof (Tear -Off) or Recover ; -'_ y ,,;•, •;.- D
Prelim. Attached Insulation, Mech. Attached Base Sheet, Bonded Roof Cover
6
1E=1
Wood
New or Reroof (Tear -Off) '` '>'= !'; E
Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover
7
1E-2
Wood
New, Reroof (Tear -Off) or Recover,' W , s �' ,'. E
Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover
8
—IF—Wood
New or Reroof (Tear -Off) L . r='•, F
Non -Insulated, Bonded Roof Cover
8
2A
Steel or Structural concrete New, Reroof-(Tear-Off)-or-Recover,'" '� `. L Z B
Mech. Attached Base Insulation, Bonded Top Insulation, Bonded Roof Cover
9
2B
Steel or Structural concrete New, Reroof (Tear -Off) or Recover } '`,-1 c:; „` C
Mech.—Attached Insulation,_Bonded Roof Cover
9
2C
Steel or Structural concrete New, Reroof (Tear -Off) or Recover D
Prelim. Attached Insulation, Mech. Attached Base Sheet, Bonded -Roof Cover
10
3A
Structural concrete
New or Reroof (Tear -Off) A-1
Bonded Insulation, Bonded Roof Cover
11-14
3B
Structural concrete
New or Reroof (Tear -Off) F
Non -Insulated, Bonded Roof Cover
J4
4A
LWIC
New or Reroof (Tear -Off) A-1
Bonded Insulation, Bonded Roof Cover
15-16
4B
LWIC
New or Reroof (Tear -Off) A-2
Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover
- 16
4C
LWIC
New or Reroof (Tear -Off) E
Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover
17-19
5A
CWF
New or Reroof (Tear -Off) A-1
Bonded Insulation, Bonded Roof Cover
20
5B
CWF
New, Reroof (Tear -Off) or Recover A-2
Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover
21
5C
CWF
New, Reroof (Tear -Off) or Recover B
Mech. Attached Base Insulation, Bonded Top Insulation, Bonded Roof Cover
22
5D I
CWF
New, Reroof (Tear -Off) or Recover C
Mech. Attached Insulation, Bonded Roof Cover
22
5E +
CWF
New, Reroof (Tear -Off) or Recover E
Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover
22
. 6A i
- Gypsum
New or Reroof (Tear -Off) A-1
Bonded Insulation, Bonded Roof Cover
23
6B
;-Gypsum
New, Reroof (Tear -Off) or Recover A-2
Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover
24
6C
Gypsum
New, Reroof (Tear -Off) or Recover C
Mech. Attached Insulation, Bonded'Roof Cover
24
6D
_Gypsum
New, Reroof (Tear -Off) or Recover E
Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover
24
7A
:,Various
Recover A-1
Bonded Insulation, Bonded Roof Cover
25-26
7B
-Various
Recover F
Non -Insulated, Bonded Base Sheet, Bonded Roof Cover
26
- The following notes apply to the systems outlined herein:
1. The'roof system evaluation herein pertains to above -deck roof components. Roof decks and structural members shall be in accordance with FBC requirements to the satisfaction of the Authority Having Jurisdiction.
Load resistance of the roof deck shall be documented through proper codified and/or FBC Approval documentation.
L t
2. Insulation%base sheet fasteners shall be of sufficient length for the following deck engagement:
- .. ➢ Wood: ' Minimum 0.75-inch penetration.
Y Steel: Minimum 0.75-inch penetration and engage the top flute of the steel deck.
Str'uctural concrete: Minimum 1-inch embedment into pilot hole in accordance with fastener manufacturer's published installation instructions.
Unless -otherwise noted, insulation may be any one layer or combination of polyisocya nu rate, polystyrene, wood fiberboard, perlite, gypsum -based roof board or mineral -wool roof board that meets the CA
requirements of F.A.C. Rule 61G20-3 and is documented as meeting FBC 1505.1 and, for foam plastic, FBC Chapter 26, when installed with the roof cover.
Exterior Research and Design, I.I.C. d/b/a Trinity ( ERD Evaluation Report A42970.10.12-R2 for 1`1.16027-J4
Certificate of Authorization #9503 6' EDITION (2017) FBC NON-HVHZ EVALUATION Revision 2: 09/25/2017
Prepared by: Robert Nieminen, PE-59166 TRI-BUILT Modified Bitumen Roof Systems; (800) 516-1485 Appendix 1, Page 1 of 26
15. Unless otherwise noted, refer to the following references for bonded base, ply or cap sheet applications.
TABLE 1: TRI-BUILT ROOF COVERS
Reference
Layer
Material
Application
BP -AA
Base Ply
FBC Approved ASTM D4601, Type II
(Base and Ply sheets, Asphalt -Applied)
HA at 20-40 Ibs/square
Ply
FBC Approved ASTM D2178, Type IV or VI
SBS-AA
(SBS, Asphalt -Applied)
Cap Ply
TriBuilt SBS Granular
HA at 20-40 Ibs/square
SBS-TA
(SBS, Torch -Applied)
Cap Ply
TriBuilt SBS Granular
Torch -Applied
SBS-SA,
Base Ply
TriBuilt SA SBS Base
(SBS, Self -Adhering)
Self -Adhering
Cap Ply
TriBuilt SA SBS Cap
APP-TA
Base Ply or Ply
TriBuilt APP Smooth
(APP, Torch -Applied)
Torch -Applied
Cap Ply
TriBuilt APP Smooth, TriBuilt APP Granular
APP-SA
Cep Ply-
TriBuilt SA APP Cap
(APP, Self -Adhering)
Self -Adhering
16. Vapor barrier options for use over structural concrete deck followed by adhered insulation carry the following Maximum Design Pressure (MDP) limitations. The lesser of the MDP listings below vs. those in Table 3A
applies:
VAPOR BARRIER OPTIONS; STRUCTURAL CONCRETE DECK; ADHERED INSULATION PER TABLE 3A
Option #
Primer
Vapor Barrier
Insulation Adhesive
MDP (psf)
Type
Attach
VB-1.
ASTM D41
TriBuilt SA SBS Base
Self -Adhering
Inta-Stik or CR-20, 12-inch o.c.
-60.0
VB-2.
ASTM D41
TriBuilt SA SBS Cap
Self -Adhering
Insta-Stik, 12-inch o.c.
-75.0
VB-3.
ASTM D41
TriBuilt SA SBS Cap
Self -Adhering
Millennium One Step Foamable Adhesive, 12-inch o.c.
-157.5
VB-4.
ASTM D41
TriBuilt+SA�SBS Capny
Self -Adhering
CR-20, 12-inch o.c.
-270.0
VB-5.
ASTM D41
.- SA.SBS Base%="
Self -Adhering '
Millennium One Step Foamable Adhesive, Millennium PG-1 Pump Grade
Adhesive, OlyBond 500 or CR-20, 12-inch o.c.
290.0
17. Dens Deck shall be field -primed with PG100 prior to self -adhering membrane application. Refer to tables herein for other priming requirements.
18. "MDP" = Maximum Design Pressure is the result of testing for wind load resistance based on allowable wind loads. Refer to FBC 1609 for determination of design wind loads.
Exterior Research and Design, LLC. d/b/a Trinity IERD
Certificate of Authorization #9503
Prepared by: Robert Nieminen, PE-59166
6' EDITION (2017) FBC NON-HVHZ EVALUATION
TRI-BUILT Modified Bitumen Roof Systems; (800) 516-1485
Evaluation Report A42970.10.12-R2 for FL16027-R2
Revision 2: 09/25/2017
Appendix 1, Page 3 of 26
NTIN'
ITY I ERD
TABLE lE-2: WOOD DECKS —NEW CONSTRUCTION, REROOF (TEAR -OFF) OR RECOVER
SYSTEM TYPE E: NON -INSULATED, MECHANICALLY ATTACHED BASE SHEET, BONDED ROOF COVER
System
Base Sheet
Roof Cover (Note 15) ..
MDP
No.
Deck (Note 1)
Base
Fasteners
Attach
Base Ply
Cap Ply
(Psf)
Min. 19/32-inch
Polyglass Elastobase, Polyglass Elastobase
OMG Flat Bottom Plates (square) with
12-inch o.c. in 4-inch lap and 12-inch
(Optional) One or
W-1
plywood at max.
Poly, Polyglass G2 Base, CertainTeed
Roofgrip #14, Dekfast Hex with Dekfast #14
o.c. in two, equally spaced, staggered
more BP -AA or
SBS-AA, SBS-
-52.5
24-inch spans
Glasbase, Firestone MB Base, JM Perma-
or TruFast MP-3 with TruFast HD
center rows
APP-TA
TA, APP-TA
Ply 28, Tamko Glass Base or GAFGLAS #75
Min. 19/32-inch
Polyglass Elastobase or Polyglass
Dekfast Hex with Dekfast #14 or TruFast MP-
12-inch o.c. in 4-inch lap and 12-Inch
One or more SBS-
SBS-SA, APP-
W-2
plywood at max.
Elastobase Poly with poly top surface
3 with TruFast HD
O.C. in two, equally spaced, staggered
SA
SA, SBS-TA or
-52.5*
24-inch spans
center rows
APP-TA
Min. 19/32-inch
Polyglass Elastobase or Polyglass
OMG Flat Bottom Plates (square) with
12-inch o.c. in 4-inch lap`and 12-inch
(Optional) One or
SBS-AA, SBS-
W-3 .
plywood at max.
_Elastobase Poly
Roofgrip #12
o.c. in two, equally spaced, staggered
more BP -AA or
TA, APP TA
-60.0
24-inch spans
—center-rows
_AP-P—TA
Min. 19/32-inch
Polyglass Elastobase or Polyglass
OMG Flat Bottom Plates (square) with -
12-inch o.c. in 4-inch lap and 12-inch
One or more SBS-
SBS-SA, APP-
W-4
plywood at max.
Elastobase Poly with poly top surface
Roofgrip #12
o.c. in two, equally spaced, staggered
SA
SA, SBS-TA or
-60.0*
24-inch spans
center rows
APP-TA
TABLE 1F: WOOD DECKS— NEW CONSTRUCTION OR REROOF (TEAR -OFF)
SYSTEM TYPE F: NON -INSULATED, BONDED ROOF COVER
System
Roof Cover (Note 15)
MDP
No.
Deck
Primer
(Psf)
Joint Treatment
Base Ply
Ply
Cap Ply
Min. 15/32-inch plywood
(Optional) SBS-SA or
SBS-SA, APP-SA, SBS-TA
W 5
at max. 24-inch spans
(Optional) ASTM D41
None
SBS-SA
APP-TA
or APP-TA
-90.0
Min. 15/32-inch plywood
Plywood joints are covered with 4-inch wide strips of TriBuilt SA
(Optional) SBS-SA or
SBS-SA, APP-SA, SBS-TA
W-6
at max. 24-inch spans
(Optional) ASTM D41
SBS Base, rolled into place to create continuous bond.
TriBuilt SA SBS Base
APP-TA
or APP-TA
-97.5
Exterior Research and Design, I.I.C. d/b/a Trinity I ERD Evaluation Report A42970.10.12-R2 for FL36027-14?
Certificate of Authorization #9503 6T" EDITION (2017) FBC NON-HVHZ EVALUATION Revision 2: 09/25/2017
Prepared by: Robert Nieminen, PE-59166 TRI-BUILT Modified Bitumen Roof Systems; (800) 516-1485 Appendix 1, Page 8 of 26