HomeMy WebLinkAboutOWNER BUILDER AFFIDAVITNUANNUlanning & Development Services Department
Building & Code Regulations
2300 Virginia Avenue 7ounty
�',I�lr(���� Fort Pierce, Florida34982 �u (772)462-1553
OWNER/BUILDERAFFIDAVIT DISCLOSURE STATEME T F.S. 489.103 (7) EXEMPTIONSST. Luc
State law requires construction to be done by
exemption to that law. The exemption allows you, as t
though you do not have a license. You must provide
may build or improve farm outbuildings, a one-famil
may also build or improve a commercial building at
use or occupancy. You may not build or improve said
If you sell or lease a building you have built or imp
presumption is created that it was built or improved f
may not hire an unlicensed person to act as your con
your responsibility to make sure that people employes
municipal licensing ordinances.. You may 'not del114
contractor who is not licensed to perform the work be
laws, ordinances, building codes, and zoning regulatio1
I understand that the building official and
the minimum code.
I understand that as an owner -builder that
in a civil court with the advice of an attorney. This
icensed contractors. You have applied for a permit under an
e owner of your property, to act as your own contractor even
iirect, on -site supervision of the construction yourself. You
or two-family residence for your use and occupancy. You
cost not exceeding $75,000.00 as long as it is for your own
structures for the purposes of selling or leasing that building.
ived within one year after construction is complete, then a
r sale or lease, which is a violation of this exemption. You
,actor or to supervise people working on your building; it is
by you have licenses required by state law and by county or
,ate the responsibility for supervising work to a licensed
ig done. Your construction must comply with all applicable
s Initial
are not there to design or give advice on how to meet
Initial
contract disputes with sub -contractors and I must be handled
ximent will not mitigate any contract disputes.
Initial e
I understand that if I compensate any person or company for work performed they are required to be
licensed in this jurisdiction. If for some reason they do not possess a license, I may be responsible and liable for the
cost of the license. I Initial
I understand that if any person that is unlicensed and uninsured gets injured on my construction project -
they may be entitled to workmen's compensation. I I could be held liable for all doctor, lawyer and related medical
cost, which could include loss of wages during recovery �bsection, from their injury. Initial
To qualify for this exemption under this an owner must personally appear and sign the building
permit application and initial the above.
I
I hereby acknowledge that I have read and understand the above disclosure statement and that I further
understand that any violation of the terms of the owner/builder exemption shall be reported by the Building and
Zoning Department to the Florida State Department of Professional Regulation. Signed and acknowledged on this
23dayof Jrane.ln of20 tk. i Iie //)
OwnerBuilder Signature
STATE OF FLORIDA
COUNTY OF 4)?-%,'sC^""*,
The foregoing instrument wa�ss acknowledged before me this Xb day of \Y\ °� t , 20
bywho is personally known to me, or who has
produced �ti lA L as identification.
•�,�, "��°W,n�eL, DEANNA MARIE GIVENS
.1 \ S?,•n r.. I
NiY.COMPv11SSI0N # GG 022023
Signature of No ry Type or Print Name of Notal -�' r��.� �(pIRES: DEr 16, 2020
Title: Notary Public Commission Number w ., : Q:'` Bonded Thru lJotary Public Underwriters
SLCPDSD Revised 05/15/2014
R !Planning and Development
Services Department
COUNTY
« Building & Code Regulation Division
Inspections
Helpful Hints fo,�r Owner Builders
Scheduling Inspections
• Inspections are typically performed the day after the inspection is scheduled.
• There are two ways to schedule an inspection:
a. Call 772-462-2172 or 462-2165 between 8 a.m. and 5 p.m., or
b. Go to www.stlucieco.org, click on permits, click on online building inspection
system.
1. Enter permit number
2. Enter confirmation number (this number is on the top of your building
permit next to the building permit number.)
3. Enter
4. Click on the request next to the inspection you want to schedule.
5. You can schedule an in online until 9 pm Monday —Friday for next
day inspection service. On Friday, the inspection will be scheduled for
Monday. On Saturday and Sunday, the inspection will be scheduled on
Tuesday.
6. For residential fences inspections, submit compliance affidavit to the
permitting office after the fence is completed. It can be emailed to
Permits@St.Lucieco.org.
Day of Inspection
• Go to www.stlucieco.org, click on permits, click on daily inspection schedule.
• Locate your address or permit number, the screen will show the inspector name
and whether the inspection is in the morning or afternoon.
• Inspections are listed in order of scheduled site visit.
• Inspectors are available by phone at the numbers listed below from 7am till 4pm.
Andy Wentz
772-249-9502 1
Gary Scheigner
772-370-2543
Greg Smyth
772-370-0482 (7 a.m. — 3 p.m.)
Walter Pride
772-370-2539
Dave Johnson
772-370-2548
Clyde Heffelfinger 772-200-6386