HomeMy WebLinkAboutLETTER OF TRANSMITTALz •.
EMM
VM Construction, Inc.
Constructors Developers Managers
8370 West Flagler Street - Suite 206
Miami, Florida 33144
Tel.305.220.6557 Fax.305.220.6575
To: Culpepper & Terpening, Inc
2980 South 25th St
Ft. Pierce, Florida 34981
Ph: 777-464-3537
WE ARE SENDING YOU:
® Attached
® Shop Drawings
® Pay Requisition
CGC Lic. No. 023826
Letter of Transmittal
Date:
May 28, 2008
Transmittal NO:
20080528
Project NO:
J-1107-140
Project Name:
ANT — Main Building
® Under separate cover via _
® Prints ® Samples
® Other:
the following items:
® Specifications
Item
NO Copies
Reference
Description
1
3
See Attached
THESE ARE TRANSMITTED as checked below:
® For approval ® Approved, as submitted ® Resubmit copies for approval
® For your use ® Approved as noted ® Submit copies for distribution
® As requested ® Returned for corrections ® Return corrected prints
® For review and comment
® FOR Bids DUE ® Prints return after loan to us
REMARKS:
Copy to: file 1205.114 Signed by: t
VM Con-MRiction, Inc.
C:WMCtProject Management\Charter Schools
Allied New Technologist Plant
9549 Range Line Road
Ft Pierce, Florida 34987
Main Buil'Iding
Project N2J-1107-140
Response and RevisionsIto SLC Comments
A-1.01 Ground Floor Plan
A-1.10 Entrance Floor Plan
A-2.02 North & West Elevations 1
A-503 Misc. Details
A-6.01 Door/Window & Room Schedules
A-6.02 Hall Types Schedules
E-1.07a Balance Power Floor Plans
E-2.01a Electrical Schedule
M-2.03 Mechanical Schedules
Response to SLC Comments
NOA Signed & Sealed
Product Review Affidavit Signed and Sealed
Electrical Power Distribution System
Drawing for Construction Permit
General Site Plan
Power Distribution Equipment locations
and Cable Tray/Conduit Routing Layout 1st Level
Power Distribution Equipment location
and Cable Tray/Conduit Routing Layout 2nd Level
Power Distribution Equipment location)
and Cable Tray/Conduit Routing Layout 3rd Level
23 KV Main Service one -line Diagram 1
23 KV/480 V Main Service Equipment Layout
23 KV/480 V Main Service Conduit Routing
Main Electrical Room
23 KV Main Service Equipment Installatioon Details
FPL Cabinets 2.5. MVA Transformer & Main Electrical Room
24 KV Main Service Equipment Installation Details
Metal -Clad Switchgear 1
24 KV Main Service Equipment Installation Details
Rectifier Transformers
24 KV Main Service Equipment Installation Details
Harmonic Filters
480 Volts Distribution System I
One -Line Diagram and Riser Diagram
480 Volts Distribution Equipment Layout's
Cable Tray and Conduit Routing
480 Volts Main Distributio Panel ED-EP-601
and Cable Tray Installation Details
Equipment/Conduit Layout and Construction Details
Standby Generator and Ats
Construction Notes
Main Service Equipment
Distribution Panel, Cable Routing and Cable Tray Schedules
. VM Construction, Inc.
ESMIConstructors Developers Managers
8370 West Flagler Street - Suite 206
Miami, Florida 33144
Tel.305.220.6557 Fax.305.220.6575
To: Culpepper & Terpening, Inc
2980 South 25th St
Ft. Pierce, Florida 34981
Ph: 777-464-3537
WE ARE SENDING YOU:
® Attached
® Shop Drawings
® Pay Requisition
CGC Lic. No. 023826
Letter of Transmittal
Date:
May 28, 2008
Transmittal NO:
20080528
Project NO:
J-1107-140
Project Name:
ANT — Main Building
® Under separate cover via _
® Prints ® Samples
® Other:
the following items:
® Specifications .
Item
NO Copies
Reference
Description
1
3
See Attached
THESE ARE TRANSMITTED as checked below:
® For approval ® Approved as submitted
® For your use ® Approved as noted
® As requested ® Returned for corrections
® For review and comment
® FOR Bids DUE
REMARKS:
Copy to: file 1205.114
C:NMCIProject ManagementlCharter Schools
® Resubmit
® Submit
® Return
copies for approval
copies for distribution
corrected prints
® Prints return after loan to us
Signed by:
VM o tru tion, Inc.
Allied New Technologist Plant
9549 Range Line Road
Ft Pierce, Florida 34987
Main Building
Project N°J-1107-140
Response and Revisions to SLC Comments
A-1.01 Ground Floor Plan
A-1.10 Entrance Floor Plan
A-2.02 North & West Elevations
A-503 Misc. Details
A-6.01 Door/Window & Room Schedules
A-6.02 Hall Types Schedules
E-1.07a Balance Power Floor Plans
E-2.01a Electrical Schedule
M-2.03 Mechanical Schedules
Response to SLC Comments
NOA Signed & Sealed
Product Review Affidavit Signed and Sealed
Electrical Power Distribution System
Drawing for Construction Permit
General Site Plan
Power Distribution Equipment location
and Cable Tray/Conduit Routing Layout 1st Level
Power Distribution Equipment location
and Cable Tray/Conduit Routing Layouti2nd Level
Power Distribution Equipment location
and Cable Tray/Conduit Routing Layout �3rd Level
23 KV Main Service one -line Diagram
23 KV/480 V Main Service Equipment Layout
23 KV/480 V Main Service Conduit Routing
Main Electrical Room
23 KV Main Service Equipment Installation Details
FPL Cabinets 2.5. MVA Transformer & Main Electrical Room
24 KV Main Service Equipment Installation Details
Metal -Clad Switchgear
24 KV Main Service Equipment Installation Details
Rectifier Transformers
24 KV Main Service Equipment Installation Details
Harmonic Filters
480 Volts Distribution System
One -Line Diagram and Riser Diagram
480 Volts Distribution Equipment Layout
Cable Tray and Conduit Routing
480 Volts Main Distributio Panel ED-EP-001
and Cable Tray Installation Details
Equipment/Conduit Layout and Construction Details
Standby Generator and Ats
Construction Notes
Main Service Equipment
Distribution Panel, Cable Routing and CableiTray Schedules
Allied New Technologies Plant
9549 Rangeline Road, Port St. Lucie, FL
Permit Number: 0802-0116
Plans Examiner Review
Comment #1— Provide 3 Sets of NOA/ SHOP Drawings for Bahama Shutters, reviewed and approved by
engineer of record.
NOA # 02-0621.08 Bahama shutters provided, see attached copies.
Comment #2 — Fire barrier walls must be designed to FBC section 706 and opening protected in
accordance with FBC Section 715
See sheet A-6.02 for wall types, UL numbers provided at different wall types. And see sheets
A-1.30 & A-1.31 to see the locations of the fire rated walls.
Comment #3 — Provide three complete sets of energy calculations for all AC area, including air system
sizing summary for all AHU's
See attached energy calculation provided by MEP engineer.
Comment #4 — Provide additional details on trenches, (TR01, TR02, TR03) in the event of acid/ chemical
spill. If there is a sump & pump, provide all necessary details.
Trenches (TR01, TR02 & TR03) are all interconnected. At the lowest point (TR03) we will provide
piping which is connected to a sump pump located at a module located in front of the lowest point. In the
event of an overflow, sensors automatically will start the pump and the spill will pump to the process
tank. The trenches are design to take the volume of the largest tank plus 1016 of that tank.
Comment #5 — Restroom doors cannot swing into clear space per FBC 11-4.22.2.
Doors swing were modified, see sheets A-1.01 & A1.10
Comment #6 — Drinking fountain must be Hi-Lo
Hi-Lo fountain was added. See sheets A-1.10 & A-5.03
Comment #7 — Show control panel for sewer dosing tank on drawing 10A.
CIVIL COMMENT —C&T
Comment #8 — Show seal -off location for control float/riserfrom dosing tank.
CIVIL COMMENT—C&T
Comment #9 — If luminaries are to be class 1, division 2, then what about emergency battery pak lights
and exit signs. ,
Luminaries and emergency battery pak lights and exit signs specified on the drawings are plastic
non-metallic fiber glass type to prevent corrosion not to imply that the environment is a hazardous one.
Comment #10 — Disconnect switch missing for electric hot water heater on drawing E-1.07a
Drawing modified, see sheet E-1.07a
Comment #11—Are their sump pumps in trenches TR01, TR02 and TROY
Trenches (TR01, TR02 & TR03) are all interconnected. At the lowest point (TR03) we will provide
piping which is connected to a sump pump located at a module located in front of the lowest point. In the
event of an overflow, sensors automatically will start the pump and the spill will pump to the process
tank. The trenches are design to take the volume of the largest tank plus 1096 of that tank.
°R
EEZ
VM Construction, Inc.
Constructors Developers Managers
6370 West Flagler Street - Suite 206
Miami, Florida 33144
Tel.305.220.6557 Fax.305.220.6575
To: Culpepper & Terpening, Inc
2980 South 25th St
Ft. Pierce, Florida .34981
Ph: 777-464-3537
WE ARE SENDING YOU:
® Attached
® Shop Drawings
® Pay Requisition
® Under separate cover
® Prints ® S
® Other:
CGC Lic. No. 023826
Letter of Transmittal
Date:
May 28, 2008
Transmittal Ne:
20080528
Project NO:
J-1107-140
Project Name:
ANT — Main Building
the following items:
)les ® Specifications
Item
N° Copies
Reference
Description
1
3
See Attached
THESE ARE TRANSMITTED as checked below:
® For approval ® Approved as submitted
® For your use ® Approved as noted
® As requested ® Returned for corrections
® For review and comment
® FOR Bids DUE
REMARKS:
® Resubmit copies for approval
® Submit copies for distribution
® Return corrected prints
® Prints return after loan to us
Copy to: file 1205.1141 Signed by:
t VM bdbokruc i n, Inc.
C:\VMC\Project ManagemenllCharter Schools "i A
1,
I _-