Loading...
HomeMy WebLinkAboutLETTER OF TRANSMITTALz •. EMM VM Construction, Inc. Constructors Developers Managers 8370 West Flagler Street - Suite 206 Miami, Florida 33144 Tel.305.220.6557 Fax.305.220.6575 To: Culpepper & Terpening, Inc 2980 South 25th St Ft. Pierce, Florida 34981 Ph: 777-464-3537 WE ARE SENDING YOU: ® Attached ® Shop Drawings ® Pay Requisition CGC Lic. No. 023826 Letter of Transmittal Date: May 28, 2008 Transmittal NO: 20080528 Project NO: J-1107-140 Project Name: ANT — Main Building ® Under separate cover via _ ® Prints ® Samples ® Other: the following items: ® Specifications Item NO Copies Reference Description 1 3 See Attached THESE ARE TRANSMITTED as checked below: ® For approval ® Approved, as submitted ® Resubmit copies for approval ® For your use ® Approved as noted ® Submit copies for distribution ® As requested ® Returned for corrections ® Return corrected prints ® For review and comment ® FOR Bids DUE ® Prints return after loan to us REMARKS: Copy to: file 1205.114 Signed by: t VM Con-MRiction, Inc. C:WMCtProject Management\Charter Schools Allied New Technologist Plant 9549 Range Line Road Ft Pierce, Florida 34987 Main Buil'Iding Project N2J-1107-140 Response and RevisionsIto SLC Comments A-1.01 Ground Floor Plan A-1.10 Entrance Floor Plan A-2.02 North & West Elevations 1 A-503 Misc. Details A-6.01 Door/Window & Room Schedules A-6.02 Hall Types Schedules E-1.07a Balance Power Floor Plans E-2.01a Electrical Schedule M-2.03 Mechanical Schedules Response to SLC Comments NOA Signed & Sealed Product Review Affidavit Signed and Sealed Electrical Power Distribution System Drawing for Construction Permit General Site Plan Power Distribution Equipment locations and Cable Tray/Conduit Routing Layout 1st Level Power Distribution Equipment location and Cable Tray/Conduit Routing Layout 2nd Level Power Distribution Equipment location) and Cable Tray/Conduit Routing Layout 3rd Level 23 KV Main Service one -line Diagram 1 23 KV/480 V Main Service Equipment Layout 23 KV/480 V Main Service Conduit Routing Main Electrical Room 23 KV Main Service Equipment Installatioon Details FPL Cabinets 2.5. MVA Transformer & Main Electrical Room 24 KV Main Service Equipment Installation Details Metal -Clad Switchgear 1 24 KV Main Service Equipment Installation Details Rectifier Transformers 24 KV Main Service Equipment Installation Details Harmonic Filters 480 Volts Distribution System I One -Line Diagram and Riser Diagram 480 Volts Distribution Equipment Layout's Cable Tray and Conduit Routing 480 Volts Main Distributio Panel ED-EP-601 and Cable Tray Installation Details Equipment/Conduit Layout and Construction Details Standby Generator and Ats Construction Notes Main Service Equipment Distribution Panel, Cable Routing and Cable Tray Schedules . VM Construction, Inc. ESMIConstructors Developers Managers 8370 West Flagler Street - Suite 206 Miami, Florida 33144 Tel.305.220.6557 Fax.305.220.6575 To: Culpepper & Terpening, Inc 2980 South 25th St Ft. Pierce, Florida 34981 Ph: 777-464-3537 WE ARE SENDING YOU: ® Attached ® Shop Drawings ® Pay Requisition CGC Lic. No. 023826 Letter of Transmittal Date: May 28, 2008 Transmittal NO: 20080528 Project NO: J-1107-140 Project Name: ANT — Main Building ® Under separate cover via _ ® Prints ® Samples ® Other: the following items: ® Specifications . Item NO Copies Reference Description 1 3 See Attached THESE ARE TRANSMITTED as checked below: ® For approval ® Approved as submitted ® For your use ® Approved as noted ® As requested ® Returned for corrections ® For review and comment ® FOR Bids DUE REMARKS: Copy to: file 1205.114 C:NMCIProject ManagementlCharter Schools ® Resubmit ® Submit ® Return copies for approval copies for distribution corrected prints ® Prints return after loan to us Signed by: VM o tru tion, Inc. Allied New Technologist Plant 9549 Range Line Road Ft Pierce, Florida 34987 Main Building Project N°J-1107-140 Response and Revisions to SLC Comments A-1.01 Ground Floor Plan A-1.10 Entrance Floor Plan A-2.02 North & West Elevations A-503 Misc. Details A-6.01 Door/Window & Room Schedules A-6.02 Hall Types Schedules E-1.07a Balance Power Floor Plans E-2.01a Electrical Schedule M-2.03 Mechanical Schedules Response to SLC Comments NOA Signed & Sealed Product Review Affidavit Signed and Sealed Electrical Power Distribution System Drawing for Construction Permit General Site Plan Power Distribution Equipment location and Cable Tray/Conduit Routing Layout 1st Level Power Distribution Equipment location and Cable Tray/Conduit Routing Layouti2nd Level Power Distribution Equipment location and Cable Tray/Conduit Routing Layout �3rd Level 23 KV Main Service one -line Diagram 23 KV/480 V Main Service Equipment Layout 23 KV/480 V Main Service Conduit Routing Main Electrical Room 23 KV Main Service Equipment Installation Details FPL Cabinets 2.5. MVA Transformer & Main Electrical Room 24 KV Main Service Equipment Installation Details Metal -Clad Switchgear 24 KV Main Service Equipment Installation Details Rectifier Transformers 24 KV Main Service Equipment Installation Details Harmonic Filters 480 Volts Distribution System One -Line Diagram and Riser Diagram 480 Volts Distribution Equipment Layout Cable Tray and Conduit Routing 480 Volts Main Distributio Panel ED-EP-001 and Cable Tray Installation Details Equipment/Conduit Layout and Construction Details Standby Generator and Ats Construction Notes Main Service Equipment Distribution Panel, Cable Routing and CableiTray Schedules Allied New Technologies Plant 9549 Rangeline Road, Port St. Lucie, FL Permit Number: 0802-0116 Plans Examiner Review Comment #1— Provide 3 Sets of NOA/ SHOP Drawings for Bahama Shutters, reviewed and approved by engineer of record. NOA # 02-0621.08 Bahama shutters provided, see attached copies. Comment #2 — Fire barrier walls must be designed to FBC section 706 and opening protected in accordance with FBC Section 715 See sheet A-6.02 for wall types, UL numbers provided at different wall types. And see sheets A-1.30 & A-1.31 to see the locations of the fire rated walls. Comment #3 — Provide three complete sets of energy calculations for all AC area, including air system sizing summary for all AHU's See attached energy calculation provided by MEP engineer. Comment #4 — Provide additional details on trenches, (TR01, TR02, TR03) in the event of acid/ chemical spill. If there is a sump & pump, provide all necessary details. Trenches (TR01, TR02 & TR03) are all interconnected. At the lowest point (TR03) we will provide piping which is connected to a sump pump located at a module located in front of the lowest point. In the event of an overflow, sensors automatically will start the pump and the spill will pump to the process tank. The trenches are design to take the volume of the largest tank plus 1016 of that tank. Comment #5 — Restroom doors cannot swing into clear space per FBC 11-4.22.2. Doors swing were modified, see sheets A-1.01 & A1.10 Comment #6 — Drinking fountain must be Hi-Lo Hi-Lo fountain was added. See sheets A-1.10 & A-5.03 Comment #7 — Show control panel for sewer dosing tank on drawing 10A. CIVIL COMMENT —C&T Comment #8 — Show seal -off location for control float/riserfrom dosing tank. CIVIL COMMENT—C&T Comment #9 — If luminaries are to be class 1, division 2, then what about emergency battery pak lights and exit signs. , Luminaries and emergency battery pak lights and exit signs specified on the drawings are plastic non-metallic fiber glass type to prevent corrosion not to imply that the environment is a hazardous one. Comment #10 — Disconnect switch missing for electric hot water heater on drawing E-1.07a Drawing modified, see sheet E-1.07a Comment #11—Are their sump pumps in trenches TR01, TR02 and TROY Trenches (TR01, TR02 & TR03) are all interconnected. At the lowest point (TR03) we will provide piping which is connected to a sump pump located at a module located in front of the lowest point. In the event of an overflow, sensors automatically will start the pump and the spill will pump to the process tank. The trenches are design to take the volume of the largest tank plus 1096 of that tank. °R EEZ VM Construction, Inc. Constructors Developers Managers 6370 West Flagler Street - Suite 206 Miami, Florida 33144 Tel.305.220.6557 Fax.305.220.6575 To: Culpepper & Terpening, Inc 2980 South 25th St Ft. Pierce, Florida .34981 Ph: 777-464-3537 WE ARE SENDING YOU: ® Attached ® Shop Drawings ® Pay Requisition ® Under separate cover ® Prints ® S ® Other: CGC Lic. No. 023826 Letter of Transmittal Date: May 28, 2008 Transmittal Ne: 20080528 Project NO: J-1107-140 Project Name: ANT — Main Building the following items: )les ® Specifications Item N° Copies Reference Description 1 3 See Attached THESE ARE TRANSMITTED as checked below: ® For approval ® Approved as submitted ® For your use ® Approved as noted ® As requested ® Returned for corrections ® For review and comment ® FOR Bids DUE REMARKS: ® Resubmit copies for approval ® Submit copies for distribution ® Return corrected prints ® Prints return after loan to us Copy to: file 1205.1141 Signed by: t VM bdbokruc i n, Inc. C:\VMC\Project ManagemenllCharter Schools "i A 1, I _-