Loading...
HomeMy WebLinkAboutST LUCIE COUNTY JAILt AUTO TIC FIRE SPRINKLER SCANNED, HYD, ULIC CALCULATIONS • PROJECT: ROCK ROAD BOOKING St L"rip'R9nf9.aw SPRINKLER EA: DWG. REF: SWE PROJEC NO.98003. DATE: 4,%26/99 HASS REF: 98003 i DESIGN DATA- . OCCUPANCY CLASSIFICATION ORDINARY HAZARD I DENSITY: .15 gpm/sq. ft. AREA OF APPLICATION: 1500 sq. ft. COVERAGE PER SPRINKLER: VARIES sq. ft. NUMBER OF .SPRINKLERS CALCULATED: 15 sprinklers TOTAL SPRINKLER WATER FLOW REQUIRED: 367.4 gpm TOTAL WATER REQUIRED (including hose): 617.4 gpm FLOW AND PRESSURE (@ BOR) 617.4 gpm @ 20 psi SPRINKLER ORIFICE SIZE: 1/2 inch DESIGN/LAYOUT BY: AUTHORITY HAVING JURISDI1TION: LOCAL BLDG. FIRE DEPT. ENGINEERIOF RECORD: GARY A. WILKERSON P.E. SIMS WILKERSON ENGINEERING, INC. 1555 HOWELL BRANCH ROAD, SUITE A-1 WINTER PARK, FL. 32789 PHONE: 4,077645-1566 FAX. 407 645 2399 CALCULATION BY'HASS COMPUTER PORGRAM (LICENSE 80 HRS SYSTEMS, INC. ATLANTA, GA SPRINKLER S' Date: 04/26/1999 JG'B TITLE: ROCK ROAD BOOKING WATER SUPPLY DATA SOURCE- STATIC RESID. NODE PRESS. PRESS. TAG (PSI) (PSI) 1 (N/A) 0.0. STEM HYDRAULIC ANALYSIS Page 1 98003.SDF FLOW AVAIL. TOTAL REQ'D PRESS. Q DEMAND PRESS. (GPM) (PSI) (GPM) (PSI) (N/A) 0.0 617.4 20.0 AGGREGATE FLOW ANALYSIS: TOTAL FLOW AT SOUR TOTAL HOSE STREAM OTHER HOSE STREAM TOTAL DISCHARGE FR NODE ANALYSIS DATA NODE TAG ELEVATION (FT) 1 0.0 2 1.0 3 1.. 0 4 -3.0 5 -3.0 6 1.0 7 4.0 8 10.0 9 . 10.0 10 10.0 11 10.0 12 10.0 13 10.0 14 10.0 15 10.0 16 10.0 17 10.0 18 10.0 19 10.0 20 10.0 21 10.0 22 10.0 23 10.0 24 10.0 25 10.0 26 10.0 27 10.0 28 10.0 617.4 GPM OWANCE AT SOURCE 150.0 GPM ,OWANCES� 100.0 GPM ACTIVE SPRINKLERS 367.4 GPM NODE TYPE SOURCE HOSE STREAM - 5.60 = 5.60 .K= 5.60 . K= 5.60 K= 5.60 K,= 5.60 K= 5.60 5.60 = 5.60 K= 5.60 K= 5.60 K= 5.60 = 5.60 5.60 K= 5.60 PRESSURE (PSI) 20.0 19.4 46.5 47.2 47.2 45.5 43.8 41.0 40.9 38.3 31.4 29.5. 27.4 25.7 21.1 1'6.4 14.3 12.8 27.8 22.8 17.7 15.5 13.8 29.6 24.3 18.9 16.5 14.7 DISCHARGE (GPM) 467.4 100.0 28.4 25.7 22.7 21.2 20.0 29.5 26.7 23.6 22.0 20.8 30.5 27.6 24.3 22.8 21.5 .SPRINKLER S' Date: 04/26/1995 JGB TITLE: ROCK ROAD BOOKING PIPE DATA u PIPE TAG / END ELEV. NOZ. PT NODES (FT) AK) (PSI) Pipe: 1 1 0. 0 SRCE 2 0. 0 2 1.0 / 0.0 19.4 Pipe: 2 FIRE P 2 1.0 0.0. 19.4 3 1A 0.0 46.5 r Pipe: 3 3 1!. 0 0.0 46.5 4 -3.0 0.0 47.2 i Pipe:-4 4 -3.0 0.0 47.2 5 -3.0 0.0 47.2 Pipe: 5 5 -3.0 0.0 47.2 6 1.0 0.0 45.5 Pipe: 6 6 1.0 0.0 45.5 7 4.0 H.S. 43.8 Pipe: 7 7 4.0 H.S. 43.8 8 10.0 0.0 41.0 Pipe': 8 8 10.0 0.0 41.0 9 10.0 0.0 40.9 Pipe:, 9 9 10.0 0.0 40.9 10 10.0 0.0 3'8.3 Pipe: 10 10 10.0 0.0 38.3' 11 10.0 0.0 31.4, Pipe: 1.1 11 10.0 0.0 31.4 12 10.0 0.0 29.5 Pipe: 12 12 10.0 0.0 29.5' 13 10.0 0.0 27.4. Pipe: 13 13 10.0 0.0 27.4 14 10.0 5.6 25.7 HYDRAULIC ANALYSIS Page 2 98003'. SDF Q(GPM) DIA(IN) LENGTH PRESS. ISC. VEL(FPS) HW(C) (FT) SUM. GPM) F.L./FT (PSI) 467.4 8.071 PL 100.00 PF 0.2 (N/A) 2.9 .150 FTG T PE -0.4 0.0 0.001 TL 152.89 PV 0.1 MP Rating: 1864.0 gpm @ 65.0 psi 0.0 Avail.: 467.2 gpm @ 65.0 psi 0.0 Req'd.: 467.2 gpm @ 27.2 psi 467.4 8.071 PL 600.00 PF 1.0 •0.0 2.9 150 FTG 4E PE 1.7 0.0 0.001 TL 708.80 PV 0.1 467.4 8.071 PL 3.00 PF 0.0 0.0. 2.9 1.50 FTG E PE___ 0.0 0.0 0.001 TL 30.20 P-V-- 0.1 467.2 8.071 PL 1.00 PF 0.0 0.0 2.9 140 FTG ---- PE -1.7 0.0 0.002 TL 1.00 PV 0.1 467.4 6.065 PL 1.00 PF 0.4 0.0 5.2 120 FTG -EGA PE -1.3 100.0 0.009 TL 46.00 PV 0.2 367.4 6.065 PL 10.00 PF 0.1 100.0 4.1 120 FTG E PE -2.6 0.0 0.006 TL 24.00 PV 0.1 367.4 6.065 PL 1.00 PF 0,•2 0.0 4.1 120 FTG T PE 0.0 0.0 0.006 TL 31.00 PV 0.1 367.4 3.068 PL 2.00 PF 2.6 0.0 15.9 120 FTG T Pt 0.0 0.0 0.152 TL 17.00 PV 1.7 367.4 3.068 PL 23.00 PF 6.9 0.0 15.9 120 FTG ET PE 0.0 0.0 0.152 TL 45.00 PV 1.7 240.7 3.068 PL 12.00 PF 1.9 0.0 10.4 120 FTG T PE 0.0 0.0 0.070 TL 27.00 PV 0.7 118.0 2.067 PL 12.00 PF 2.2 0.0 11.3 120 FTG E PE 0.01-' 0.0 0.128 TL 17.00 PV* 0.9 118.0 2.067 PL 2.60 PF 1.6 0.0 11.3 120 FTG T PE 0.0 28.4 0.128 TL 12.'60 PV 0.9 • SPRINKLER SY TEM HYDRAULIC ANALYSIS Page 3 Date: 04/26/1999,.. 98003.SDF* JOB TITLE: ROCK ROAD BOOKING, * PIPE DATA (cont.) PIPE TAG Q(GPM) DIA(I N) LENGTH PRESS. END ELEV. NOZ. PT ISC. VEL(FPS) HW(C)' (FT) sum. -NODES (FT) (K) (PSI) �('GPM) F.L./FT (PSI) Pipe: 14 89.6 1..610 PL 10.00 PF 4.7 14 10.0 5.6 25.7 28:4 14.1 120 PTG T PE 0.0 is 10.0 5.6 21.1 '2 5. 7 0.259 TL 18.00 PV 1.3 Pipe: 15 63.9 1.380 PL 10.00 PF 4.7 is 10.0 5.6 21.1 25.7 13.7 120 FTG T PE 0.0 16 .10.0 5.6 16.4' 22.7 0.293 TL 16.00 PV 1.3 Pipe: 16 41.2 1.380 PL 10.00 PF 2.1 16 10.0 5.6 16.4 2.2.7 8.8 120 FTG T PE 0.0 17 10.0 5.6 14.3 21.2 0.130 TL 16.00 PV 0.5 Pipe: 17 20.0 1.049 PL 10.00 PF 1.6 17 10.0 5.6 1,4_.3 21.2 7.4 120 FTG E PE 0.0 18 10.0 5.6 3-2,-.8 20.b 0.13,0 TL 12.00 PV 0.4 Pipe: 18 122.7 2.067 PL 2.60 PF 1.7 12 10.0 0.0 29.5 0.0 11.7 120 FTG T PE 0.0 19 10.0 5.6 27.8 29.5 0.137 TL 12.60 PV 0.9 Pipe: 19 93.2 1.610 PL 10.00 PF 5.0 19 10.0 5.6 27.8 29.5 14.7 120 FTG T PE 0.0 20 10.0 5.6 22.8 26.7 0.278 TL '18.00 PV 1.5 Pipe:' 20 66.4 1.380 PL 10.00 PF 5.0 20 10.0 5.6 22.8 26.7 14.3 120 FTG T PE 0.0 21' 10.0 5.6 17.7, 23.6 0.315 TL 16.00 PV 1.4 Pipe: 21 42.9 1.380 PL 10.00 PF 2.2 21 10.0 5.6 17.71 23.6 9.2 120 FTG T PE 0.0 22 10.0 5.6 15.51 22.0 0.140 TL 16.'00 PV 0.6 Pipe: 22 I 20.8 1.049 PL 10.00 PF 1.7 22 10.0 5.6 3-g.5 22.0 7.7 120 FTG E PE 0.0 23 10.0 -S.6 13.9 20.8 0.140 TL 12.00 PV 0.4 Pipe: 23 I 126.7 2.067 PL 2.60 PF 1.8 11 10.0 0.- 31.4 0.0 12.1 120 FTG T PE 0.0 .24 10.0 5.6 29.6 30.5 0.145 TL 12.60 PV 1.0 Pipe: 24 � 96.2 1.610 PL 10.00 PF 5.3 24 10.0 5.6 29 6 30.5 15.2 120 FTG T PE 0.0 25 10.0 S.6 24.3 27.6 0.295 TL 18.00 PV 1.5 Pipe: 25 68.6 1.380-PL 10.00 PF 5.4 25 10.0- 5.6 24-.3 27.6 14.7 120 FTG T PE 0.0 26 10.0 5.6 18.9 24.3 0.335 TL 16.00 PV 1.5 Pipe: 26 44.3 1.380 PL 10.00 PF 2.4 26 10.0 5.6 18 9 24.3, 9.5. 120 FTG T PE 0'.0 27 10.0 5.6 16jS 22.8 0.149 TL 16.00 PV 0.6 i SPRINKLER S STEM HYDRAULIC ANALYSIS Page 4 Date:-04/26/1999 96003.SDF JOB TITLE: ROCK ROAD BOOKING PIPE DATA (cont.) PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT ISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K),-" (PSI) (GPM) F.L./FT (PSI) Pipe: 27 j 21.5 1.049 PL 10.00 PF 1.8 27 10.0 5.6 16.5 22.8 8.0 120 FTG E PE 0.0 28 10.0 5.6 !14.7 21.5 0.149 TL 12.00 PV 0.4 NOTES: (1) Calculations were,•performed by the HASS 6.3.0 computer program under 'license. no.,' 802C9 7 granted by HRS Systems, Inc. 2193 Ranchwood Dr., N.E. Atlanta, GA 30345 (2) The system has/been balanced to provide an average imbalance at each node Iof'O.013 gpm and a maximum imbalance at any node of 0.172 gpm. (3) Velocity pressures are printed for information only, and are not used in balancing the system. Maximum water velocity is 15.9 ft/sec at pipe 9. (4) PIPE FITTINGS TABLE Pipe Table Name: STANDARD.PIP PAGE: A MATERIAL: S40 HWC: 120 Diameter Equivalent Fitting Lengths in Feet (in) E TI L C B G A D Ell Tee LngEll ChkVly BfyVly GatVly AlmChk DPVly r- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - N NPTee 1.049 2.00 5 00 2.00 5.00 6.00 1.00 10.00 10.00 5:00 ; 1.380 3 .-00 6100 2 . QO 7.00 6 . 00 1.00 10 . 0.0 10.6 6.00 1.610 4.00 8.00 2.00 9.00 6.00 1.00 10.00 10.00 8.00 2.067 5.00 10.00 3.00 11.00 6.00 1.00 10.00 10.00 10.00 3.068 7.00 1.00 5.00 16.00 10.00 1.00 13.00 10.00 15.00 6.065 14.00 30.00 9.00 32.00 10.00 3.00 28.00 19.00 30.00 I 8.071 18.00 35.00 13.00 45.00 12.00 4.00 35.00 27.00 35.00 1 . SPRINKLER SY ' - Date: .04/26/1999 JOB'TITLE: ROCK ROAD BOOKING WATER SUPPLY CURVE �4+ � I 22+ 20+ � 18+ i P 16+ R E S S 14+ U R E 12+ P S I 10+ m 6+ HYDRAULIC ANALYSIS Page 5 98003.8DF 4 + LEGEND " X = Required Water Supply " 20.00 psi @ 617.4 gpm " 2+ n u • n 0*\+-+---+----+-----+=-----+--------+--------+--- '-----+-----------+\\\\ 200 300 400 500 600 700 800 900 1000 FLOW (GPM) ggVq 0,5ql �JC C y DEPAR 0 1 DESIGN CE ST. LUCIE COUNTY ENT OF COMMUNITY DEVELOPMENT, Q VIRGINIA AVENUE, ROOM 201 FT. PIERCE, FL 34952-5652 561-462-1553 FICATION FOR WIND LOAD COMPLIANCE This Certification is to be completed by the project design architect or engineer. This Certification must be submitted with all applications for building permit involving the construction of new residence (single or multi -family), residential addition, any accessory structure requiring a building permit,. and any non-residential structure. This Certification shall not apply to interior renovations (provided that no structural walls, columns or other similar component is b�ing effected) and certain other minor building permits. For further assistance, please contact the Building Inspection Office at 462-1553 or 462-2172. PROJECT NAME Provo r STREET ADDRESS I PR NUMBER PERMIT NUMBER I OCCP. TYPE CST. TYPE I . 11 _ _ s1 CERTIFICATION STATEMENT: I CERTIFY THAT, TO THE BEST OF MY KNOV�LEDGE AND BELIEF, THESE PLANS AND SPECIFICATIONS HAVE BEEN DESIGNED TO COMPLY WITH THE APPLICABLE STRUCTURAL PORTION OF -THE BUILDING CODES CURRENTLY ADOPTED AND ENFORCED BY IST. LUCIE COUNTY. I ALSO CERTIFY THAT THE STRUCTURAL ELEMENTS DEPICTED ON THESE PLANS PROVIDE ADEQUATE RESISTANCE TO THE WIND LOADS AND'FORCES SPECIFIED BY THE CURRENT CODE PROVISIONS. 1. BUILDING CODE EDITION 1997 EDITION 2. BUILDING DESIGN IS (CHECK ONE) EN 3. BUILDING HEIGHT: 107 FT 5. WIND EXPOSURE CLASSIFICATION (REF 6. 7. 8. 9. 10. ✓ ASCE 7-95 OTHER (SPECIFY) OSED ✓ PARTIALLY ENCLOSED OPEN BUILDING 4. WIND SPEED USED IN BUILDING DESIGN: 110 MPH TO EXPOSURE TABLES IN BUILDING CODE IDENTIFIED IN LINE #1): /VIA AVERAGE WIND VELOCITY PRESSURE ON EXTERIOR FACES OF STRUCTURE: Z w PSF PEAK WIND VELOCITY PRESSURE ON EXTERIOR FACES OF STRUCTURE: P 3a-r PSF IMPORTANCE FACTOR (OBTAIN FROM IUILDING CODE): LOADS: FLOOR PSF ROOF/DEAD:" PSF ROOF/LIVE: PSF WERE SHEARWALLS CONSIDERED FO STRUCTURE (CHECK ONE) YES ✓ NO If NO, why? (attach explanation) IS A CONTINUOUS LOAD PATH PROVIDED (CHECK ONE) YES NO If NO, why? (attach explanation) I ARE COMPONENT AND CLADDING DETAILS PROVIDED (CHECK ONE) YES f/ NO If NO, why? (attach explanation) I RAIMIMI IRA 5znII PFGPIKIr PRGCRI IRG• 12 a�� PCG AS WITNESSED BY MY SEAL, I HEREB' CERTIFICATION IS TRUE AND CORRECT, NAM DESIGN FIRM: CERTIFY THAT THE ABOVE INFORMATION INLL D THE BEST OF MY KNOWLEDGE AND BELIEF. CERTIFICATION NO: PE-43444 Ina DATE: October 13, 1999 ,2400 Rhode Island Ave Fort Pierce, Florida 34950 ( ) New Construction ( ) Tenant ST. LUCIE COUNTY FIRE DISTRICT BUI EAU OF FIRE PREVENTION PLAN REVIEW Telephone (561)-462-2312 -Fax:: (561)-462-2323 TYPE OF PERMIT (X ) Addition ( ) Renovation/alteration ( ) Shell Only Jurisdiction: St Lucie County F.P.B. B-99-166 Occupancy: St Lucie County Correctio al Center Building Dept. 99090341 Address: 900 Rock Rd Number.of stories: 1 Contractor: Adnan Investment Phone # 561-229-8557 Contractors address: P. O. Box 517 City: Jensen Beach, FL Zip: 34958 Architect/Engineer: Stebbins, Scott' Bergman Phon 1#: 561-461-2450 Building owner: St`Lucie County RevieJw date: 10-15-99 Occupancy type: Detention/Corr'ectional Automatic sprinklers: Yes Gross sq. ft. 2500 sq ft Net sq. ft. Occupant load: Based on: Construction type ( NFPA-220) Type: SBCCI: Type: IV NOTE 1. All revisions must be in compliance befog' the final inspection, or so noted. 2. The Fire Marshal required 24 hour notice on all inspections. 3. The respective Building Department shall schedule all final inspections through the Fire Marshal's Office. 4. Failed inspections requirement payment C f fee prior to scheduling of any further inspections. S. Permit fees are required to be paid in full prior to any inspections. 6. A copy of the required revision/s have been transmitted to the Architect ( ) Contractor ( ). REVISIONS REQUIRED 1. A separate permit is required forte installation of both the -fire sprinkler -and fire alarm system 2. Provide a minimum of one 2A-10 C rated fire extinguisher every 75' of travel distance. R@viewed 6y: 1, I - • - Tony Liento Date: October 15, 1999 ,o Thole Ruilding Performance Method ENERGY EFFICIENCY CODE Florida Department FLA/COM-97 'ROJECT NAME —ROCK ROAD BOOKING ADDRESS: ST LUCIE COUNTY )WNER: ST LUCIE COUNTY, AGENT: =LDING TYPE: _Business (Office)_ 'ONSTRUCTION CONDITION: Existing B )ESIGN COMPLETION: _Addition 'ONDITIONED FLOOR AREA: _2240 1AX. TONNAGE OF EQUIPMENT PER SYST 'OMPLIANCE CALCULATION: 1ETHOD A ----------------- �. WHOLE BUILDING ?RESCRIPTIVE REQUIREMENTS: _,IGHTING or Commercial Buildings OR.BUILDING CONSTRUCTION f Community Affairs ersion 2'.2 .ilding Form 40OA-97 PERMITTING OFFICE: _Fort Pierce CLIMATE4-ZONE: 6 PERMIT NO: JURISDICTION'NO: 661100 NUMBER OF ZONES: 1 \6 DESIGN CRITERIA 71`.90- 100..00 'RESULT PASSES LIGHTING CONTROL REQUIREMENTS PASSES IVAC EQUIPMENT COOLING EQUIPMENT 1. EER 10.00 8.90 PASSES IPLV 8.30 8.3.0 PASSES HEATING EQUIPMENT 1.- Et 1.00 N/A AIR DISTRIBUTION SYSTEM INSULATION REQUIREMENTS 1. Unconditioned Space 6.00 4.20 PASSES REHEAT SYSTEM TYPES USED NO REHEAT SYSTEM is USED dATER HEATING EQUIPMENT 1. EF 1.00. 0.93 PASSES PIPING INSULATION REQUIREMENTS 1. Non -Circulating 1.00 1.00 PASSES :OMPLIANCE CERTIFICATION: L hereby certify that the plans and Specifications covered by this calcu= lation are in, compliance with the ,lorida Energy Effi iency Cade PREPARED BY: DATE: f hereby certify that this buil.dirig is in compliance, with the Florida Energy. efficiency Cede. DWNER/AGENT: Review of the plans and specifica- tions covered by this calculation indicates compliance with the Florida Energy Efficiency Code. Before construction is completed, this building will be inspected .for compliance in accordance with -Sectiof'-553.908, Florida Statutes. BUILDING OFFICIAL: DATE:' DATE: � I hereby -certify(*) that the system design is, in compliance with the Florida Enet9ly Efficiency Code. - "- SYSTEM DESIGNER.'..REGI-STRAT�ION/STATE ARCHITECT MECHANICAL: PLUMBING ELECTRICAL: LIGHTING (*) Signature is required where -Florida law requires d"esign to be performed by registered design professionals. Typed names and registration numbers may be used where all relevant information is contained on signed/sealed plans. I i i I ` I BUILDING ENVELOPE SYSTEMS COMPLIANCE !�- CHECK 4A1.------GLAZING--ZONE 1-------------------- "Elevation Type U. SC VLT Shading Area (Sgft) East Commercial 1.31 .95 1 Continuous Ove 18 Total Glass Area in Zone 1' = 18 Total Glass Area = 18 402.------WALLS--ZONE 1--------------------- --=------------------------ Elevation Type U In's'ul R Gross(Sgft) ----------------------------------------- ----------------------- North 5/8"Stco/8"CMU/3/4"ISO BTWN24"oc 0.149 4 288 East 5/8"Stco/8"CMU/3/4"ISO BTWN2411oc 0.149 4 630 South 5/8"Stco/8"CMU/3/4"ISO BTWN2411oc 0.149 4 288 Total Wall Area in Zone 1 = 1206 Total Gross Wall Area = 1206 403.------DOORS--ZONE 1------------------------------------------------ --- Elevation Type U Area(Sgft) -------------------------------------------------- ----- ---------- No doors 0.00 0 i To al Door Area in Zone 1 = 0 Total Door Area = 0 404.------ROOFS--ZONE 1-=--------------------------------------------- --- Type Color U Insul R Area ( Sqf t ) Sngl Ply/2"Iso/2" Conc/Mtl Deck Medium 065 14 2240 Total Roof Area in Zone 1 = 2240 Total Roof Area = 2240 405------- FLOORS -ZONE 1------------------------------------------------ --- Type Insul R` Area ( Sqf t ) ------- ---------- Slab on Grade/Uninsulated 0 2240 Total Floor Area in Zone 1 = 2240 Total Floor Area = 2240 406.---.---INFILTRATION ----------- -------- ------------------------------- CHECK. Infiltration Criteria in 406.1 ABCD have been met. MECHANICAL SYSTEMS CHECK -----------------------------' --------------------------------- - --- ---- HVAC load sizinghas -1,.pien per: erformed. (407.1.ABCD) 407.------COOLING SYSTEMS--'-------------------�---------------------- --- Type No Efficiency IPLV Tons 1. Air Cooled ( >= 65,000 Btu/h 1 10 0 5.72 408.------HEATING SYSTEMS -------- , -------------------------------------- --- Type No Efficiency BTU/hr 1. Electric Resistance 1 1 61470 409.------VENTILATION ------------ -------------------------------------- --- CHECK Ventilation Criteria in 409..11ABCD have been met. 410.-----AIR DISTRIBUTION SYSTEM---------------------------------------- --- CHECK --------------------------------------------------=--------------- ---- --- Duct sizing and design have been performed. (410.1.ABCD) I '.AHU,Type Duct Location R-value 1. Packaged Constant-V-olume Unconditioned Space 6 CHECK r 7- Testingand balancing will be g performed. (410.1.ABCD) 411------ PUMPS AND PIPING -ZONE ----------------------------------------- '- ]Basic prescriptive requirements -in 411.'l.ABCD have been met. PLUMBINGi SYSTEMS 411.TYP--e-PUMPS AND PIPING -ZONE �--�--- R-value/in Diameter Thickness ------------------------------------------ 1. Non -Circulating 4 .5 1 412------ WATER HEATING SYSTEMS -ZONE 1--------------------- ------- -=�---- Type- -_-Efficiency StandbyLoss InputRate Gallons --------------------------------------- 1. Electric(<=12 KW) 1 0 - 3 0 ELECTRICAL SYSTEMS 413------ELECTRICAL POWER DISTRI CHECKI Metering cri-t-eria in 413.1.ABCD have been met. 414 ------ MOTORS ----------------- --------------------------------- ----- Motor efficiencies in 414.1. CD have been met. 415 ------ LIGHTING SYSTEMS -ZONE --------------------------------------- Space -Type -No Control-Type-1 -io Control-Type-2 -No -Watts Area(Sgft) Reading, T 1 On/Off 10 2784 2240 -Total Watts for Zone 1 = 2784 Total Area for Zone 1 = 2240 Total Watts = 2784 Total Area = 2240 CHECK Lightingcriteria in 415.1.ABCD have been met. ------------------------------L--------------------------------- ----- 16. Operation/maintenance manual: will be provided to owner.(102.1) REQUEST FOR 30 jDAY TEMPORARY POWER RELEASE DATE: PERMIT NUMBER: St. Lucie County Comm. Devel. Dept. 9 Code Compliance Divislon 2300 Virginia - Avenue I Fort Pierce, FL 34982.5852 Ph. (561) 462- 2165 PROPERTY ADDRESS: St. Lucie COh Corre Rock Road v/ ,O THE UNDERSIGNED HERE THE ABOVE DESCRIBED PI DAYS, FOR THE PURPOSE TION FOR FINAL INSPEC REQUEST WE HEREBY AC 1. This temporary pc only, and there will b by construction durir 2. As witness by our conditions of this ag incorporated herein 3. All conditions and "Requirements for 3 premises is ready fo / /Z'. Oki St. Lucie County Public Works 3Y REQUEST RELEASE OF ELECTRICAL POWER TO OPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) )F TESTING SYSTEMS AND EQUIPMENT IN PREPARA- ION. IN CONSIDERATION OF APPROVAL OF THIS CNOWLEDGE AND AGREE AS FOLLOWS: er release is requested for the above stated purpose no occupancy of any type, other than that permitted this time period. signatures, we hereby agree to abide by all terms and vement, Including Building Division Policy, which -is iy reference. requirements listed in the attached document entitled I Day Power for Testing" have been fulfilled and the compliance inspection. We hereby release and agree to hold harmless, St. Lucie County, and their employees from all liabilities and claims of any type or nature which may arise now or in the future out of this transaction, including any . damages which may be Incurred du® to the disconnection ofelectricallpower. in the event of violation of this agreement. AzAky %'t7-pj9 V6'd aqQq A=1 T94 Pp®JEFFRFYR. E MELDRIM MY COMMISSION # CC 752400 V'4:E` FIRES: 06/18/M2 -NOTARY Fla Notary Services & Bonding Co. \ _lMT 'AaR n ANT MHM(TH WA bC_ Tn GG�OT-J7C _ FRASER ENGI EERING AND TESTING, INC. 3504 IND' STRIAL 33rd STREET' FORT PIERCE ' FLORIDA' 34946 YEPO BEACH (561) 567-6167 FORT PIERCE (561) 461-7508 STUART (561) 283-7711 FT. PIERCE 1-800-233-9011 Report of DENSITY OF SOIL IN PLACE ASTM D2922 CLIENT:. Adnan Investments CONTRACTOW Client SITE: St. Lucie .County Jail Foundation Footings,.Vestibul Date: 10/25/99 Permit #.� 90341 µ DENSrl jr TEST DATE ` ELEVATION `MOISTURE -DENSITY RELATIONSiI1P IN PLACE DRY PERCENT TEST MAX. NO. TESTED LOCAT1tON NO. DRY WT. DENSITY COMPACTION 1940 10/25/99- E. Footing '0 - 1' 1939 118.2 17.8 99.6 1941 W. Footing 1 - 2' .117.4 99.3 ALL ELEVATIONS B, LOW SLAB GRADE Copies: Client - 1 SLC Bldg. Dept. - 1 o��� OCT-2 o 199 S1 Lucie County ubii ' - P� Works Respectfully submitted, FRASER EN_G RING AND TESTING, INC. Alexander" H. Fraser, P.E. Fla. Reg: No. -16178 GEOTECHNICAL ENGINEERING DATION INVESTIGATIONS CONCRETE. SOIL, AND ASPHALT TESTING FRASER ENG NEERING AND TESTING,' INC. 3504 INDUSTR AL 33RD STREET FORT PIERCE. FLORIDA 34946 VERO.BF.ACH (561) 567-6167 FORT PIERCE (561) 461-7598 STUART (561) 283-7711 • F,:r91ERCE 1-800-233-9011 ' r Report of MOISTU E DENSITY RELATIONSHIP ASTM D-1557 CLIENT: Adnan Investments DATE: 10/25/99 CONTRACTOR: Client SITE: St. Lucie County Jail Foundation Footings, Vgstibule P.C.F. Dry Weight Al I fill 116 S '10 12 14 Moisture % of Dry Weight i Optimum Max. Dry Soil FTest Method Sample Location Moisture % Density- P.C.F. Description B Composite 10.6 118.2 Dark brown, sightly silty, slightly Clayey, fine sand 'Respectfully submitted, FRASER ENGINE RING AND VESTING, INC. Alexander.173. Fraser, P.E.; Florida Reg: No. 16178 GEOTECHNICAL ENGINEERING FOUNDATION INVESTIGATIONS CONCRETE. SOIL AND ASPHALT TESTING