Loading...
HomeMy WebLinkAboutPROJECT INFORMATION. . MA. ST R`POOLS,GUZLD MEMBER iWWiW� ST�RPOOCSGUILD.COM: • A , CONCRETE -mot . " e POOLS' Member,-' 410 SAEGER AVE., FORT PIERCE; FLORIDA 34982 (772), sus-��s2 Fax (772) 461-i62a: Building the". :. world',& finest pools APRIL 16T",.2618 ST"LUCIE"COUNTY. PLAN REVIEW ATTN: Andrew From: Jason Baran with A&G Concrete Pools Re: Permit#,1803-0808_ . Erika; Per your building comments: Comment 1: Draw_ ings" reference the outdated fbc and nec, please update:. Response: 1. " The top right of"the-plan above specifications was updated and circled to reference.the" current. Florida Building Code 2017 61, Edition for Residential: 2. The pool detail was updated and circled to reference. the current Florida Building Code 2017 a Edition for Residential. 3. Swimout:detail was updated to the current F.R:C. 450'118 and Ansi/NSPI-5-2003 4: Equipotential bonding detail was updated to reflect the N.E.C.'2014 Sec. 680.26 and circled:_ 5. " Electrical diagram was -updated fro 2.011 code to reflect 2014.code and -circled, - Comment 2:' 2 electrical diagrams. are on the drawings, please clarify. Response; 1: " Bottom diagram was removed."There is only one diag am now. Comment 3. Please clarify general. note #3, does engineer require a geotechnical report to Verify 2500 psf soil bearing capacity, or is the"2500 psf soil bearing capacity assumed.. Please clarify the note, on. the plans. Response.`. 1. We changed, the verbiage to state that a:2500 psf load bearing capacity is assumed and circled it.: Comment 4: Please provide product -data for the alarm. Response: A cut sheet of.the alarms was printed and resubmitted) with the revised plans. Comment 6: Please note on the: plans the pool will conform to the.applicable standard, design, construction, and:workmanship, shall be m" " conformitywith the requirements of the ansi/apspricc3, ansi/apspficc 4, ansi/apsp/icc 5; ansi/apsp/icc 6, and ansi/apsp/icc.7. Response:: 1. The above verbiage was added to the plan and circled. Comment 6: Please provide piping diagram: Response:. :. 1. -Since piping was already shown with applicable piping sizes, we drew the runs all the way to.the equipment pad. There was already a plumbing legend and equipment layout. � IF YOU HAVE.ANY QUrESTIONS, PLEASE CALL.ME :.DIRECT AT 772-678-5632: :. JASON,BARAN