Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENTBy g Planning I& Development Services Building & Code Regulation Division 2300 Virginia Ave Fart Pierce, FL 34982 772-462 2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CO PERMIT #:50 l8D;-Q-757 JOB BUILDER/CONTRACTOR: -Sen �9,) PEST CONTROL CONTRACTOR: Ev PEST CONTROL LICENSE #: JB175775 We, the undersigned, hereby certify that subterranean termites in accordance with Square feet if area treated: is0 Percentage of solution: .05% Date of Treatment: 3G Footing 11� Treatment Re -Treat Driveway 1st Treatment Re -Treat l _Other -I C— . Treat nt Re -Treat Note: There must be a completed form for o site to be picked up by the inspector at time fee charged. N SOIL TREATMENT -A-BUG TERMITE & PEST CONTROL INC. have pretreated the above described construction for standards of the National Pest Control Association. Chemicals used: DOMINION 2L Total gallons used: Time of Treatment: -0� Slab 1't Treatment Re -Treat Pools 1st Treatment -Treat for Final Inspection of Exterminator go//1 Date 3 � h required treatment or re -treatment and this form must be on the job each inspection or the scheduled inspection will fail and a re -inspection FBC104.2.6 Certificate of Protective Treatment for prevention of termites A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files The Treatment Certificate shall provide the product used, ideritity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration land number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to Fnal building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014