Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
INSTALLATION MANUAL
MANUFACTURED BEAUTIFULLYTm cd, I I WAIL I lei 0 WiVA Al 0 � a YA Table of Contents INTRODUCTION.......................................................................................................1 IMPORTANTNOTICES...............................................................................................................................1 SAFETY...................................................................................................................................................1 RESOURCES...............................................................................................................................................1 FEDERALPREEMPTION............................................................................................................................2 DEFINITIONS................................................................. ...........................................................................2 ENGINEER'S STAMP..................................................................................................................................3 SYMBOLSUSED IN THE MANUAL...........................................................................................................4 ABBREVIATIONS........................................................................................................................................4 ALTERNATIVE TIE -DOWN AND/OR FOUNDATION SYSTEMS...............................................................5 DISPLAYAND STORAGE OF THE HOME.................................................................................................5 GETTINGSTARTED................................................................................................. 6 STEP1 LOCATE THE DATA PLATE.....................................................................................................6 STEP2. CONFIRM WIND ZONE.............................................................................................................6 STEP3. CONFIRM THERMAL ZONE.....................................................................................................7 STEP 4. CONFIRM ROOF -LOAD ZONE.................................................................................................8 STEP 5. CHECK LOCAL CODES AND SECURE PERMITS..................................................................9 PREPARETHE SITE .......................................... :.................................................... 10 STEP1. PLAN SITE ACCESS.......................................:.......................................................................10 STEP 2. DETERMINE HOME LOCATION AND LAYOUT.....................................................................10 STEP 3. CLEAR AND GRADE THE SITE.............................................................................................11 STEP4. DETERMINE SOIL CONDITIONS............................................................................................11 STEP 5. DETERMINE SOIL -BEARING CAPACITY AND FROST LINE...............................................12 STEP 6. DETERMINE GROUND ANCHOR HOLDING CAPACITY......................................................14 INSTALLFOOTINGS..............................................................................................15 STEP 1. DESIGN POINT LOAD SUPPORTS........................................................................................15 STEP 2. DESIGN FRAME SUPPORTS (Homes Without Perimeter Blocking)..................................19 STEP 3. DESIGN FRAME AND PERIMETER SUPPORTS (Homes With Perimeter Blocking) .........20 STEP 4. SELECT FOOTING MATERIALS............................................................................................22 STEP5. SIZE FOOTINGS......................................................................................................................22 STEP6. INSTALL FOOTINGS...............................................................................................................24 CONSTRUCTFOUNDATIONS............................................................................... 26 STEP 1. OBTAIN A FOUNDATION DESIGN.........................................................................................26 STEP2. EXCAVATE..............................................................................................................................26 STEP 3. CONSTRUCT THE FOOTING OR SLAB.................................................................................26 STEP 4. CONSTRUCT THE PERIMETER WALL..................................................................................26 STEP5. INSTALL INTERIOR SUPPORTS............................................................................................27 STEP 6. DAMP PROOF FOUNDATION WALL.....................................................................................27 STEP7. BACKFILL AND GRADE.........................................................................................................27 MANUFACTUA[D INAU•ULLY' Manufacturer's Installation Manual - June 2015 F ,° Conforms to HUD MHCSS 4/27/15 SET THE HOME ........ 1......... ........ ......................... :................................................... 28 STEP1. PREPARE OR SET...............................................................................................................28 STEP2. POSITION OME SECTION....................................................................................................28 STEP3. LIFT HOME..............................................................................................................................28 STEP4. CONSTRUCT PIERS...............................................................................................................30 COMPLETE MULTI -SECTION SET.........................................................................34 STEP1. MARRIAG� LINE ANCHORS..................................................................................................34 STEP 2. REMOVE PROTECTIVE SHIPPING MATERIALS..................................................................34 STEP3. I COMPLETE E HINGED ROOF...................................................................................................34 STEP 4. REPAIR OR INSTALL MARRIAGE LINE GASKET................................................................36 STEP 5. POSITIO� ADDITIONAL HOME SECTIONS..........................................................................37 STEP6. I CONNECT FLOORS................................................................................................................37 STEP7. CONNECT ROOF....................................................................................................................39 STEP8. CONNECT WALLS................................................................................................................... 0 STEP 9. ATTACH TAG UNITS OR (AC) GARAGE........................................................... :................... 42 STEP10. REMOVE TEMPORARY ITEMS..............................................................................................43 STEP 11. FASTEN OME TO FOUNDATION........................................................................................43 STEP12. BACKFI IL AND GRADE..........................................................................................................43 STEP13. BUILD STAIRS........................................................................................................................43 COMPLETE ROOF AND EXTERIOR WALLS.........................................................44 STEP1. COMPLETE ROOF..................................................................................................................44 STEP2. COMPLETE TAG UNIT ROOF................................................................................................46 STEP3. COMPLETE SIDE WALLS.................................................................................................48 CONNECTCROSSOVERS......................................................................................49 STEP1. STEP 2. CONNECT DUCTS..................................................................................................................49 CONNECT ELECTRICAL CROSSOVERS..............................................................................51 STEP 3. INSTAL ELECTRICAL BONDING.........................................................................................54 STEP 4. STEP 5. CONNECT WATER LINES......................................................................................................54 CONNECT DRAIN, WASTE, AND VENT LINES STEP 6. STEP 7. CONNICT GAS LINES ................................. .....................................................................55 CONNECT TELEPHONE AND CABLE TV WIRING...............................................................57 STEP 8. i CONNECT HOT WATER BASEBOARD HEAT......................................................................57 COMPLETETHE INTERIOR...................................................................................58 STEP1. ALIGN MARRIAGE WALLS....................................................................................................58 STEP 2. FINISH GYPSUM BOARD.......................................................................................................58 STEP 3. COMPLETE WALL AND CEILING FINISHES........................................................................59 STEP4. COMPLETE CARPET..........................................................................................................:...59 I STEP5. COMPLETE TRIM....................................................................................................................59 STEP6. INSTALL SHIP LOOSE ITEMS...............................................................................................59 INSTALL STABILIZING SYSTEM...........................................................................60 STEP 1. DETERMINE ANCHOR LOCATIONS.....................................................................................60 STEP 2. DETERMINE TIE -DOWN CONFIGURATION..........................................................................65 Manufacturer's Installation Manual - June 2015 P_ orms to MHCSS ANCHORSUTEP 3. SELECT ................................... .............................................................................. 66 STEP4. INSTALL ANCHORS..................................i .............................................................................66 STEP5. INSTALL STRAPS...................................................................................................................67 STEP 6. TIGHTEN AND ADJUST STRAPS..........................................................................................70 CONNECTUTILITIES............................................................................................. 71 STEP 1. CONNECT ELECTRICAL SERVICE.......................................................................................71 STEP 2. CONNECT WATER SERVICE.................................................................................................74 STEP 3. CONNECT GAS SERVICE STEP 4. CONNECT OIL SERVICE ............................. ........................................................................... 78 PREPARE APPLIANCES AND EQUIPMENT..:....................................................... 79 INSTALL AIR CONDITIONER OR HEAT PUMP............!..........................................................................79 PREPARE HEATING SYSTEM.................................................................................................................80 INSTALL REMOTE HEATING AND COOLING EQUIPMENT ..................................... : .......................... ..80. PREPARE VENTILATION SYSTEM....................................................................................................81 PREPARE FUEL -BURNING WATER HEATER .............. !............................. ............................................... 81 INSTALL EVAPORATIVE COOLER........................................................................................................82 PREPARE CLOTHES DRYER ......................................... ..................................................... .83 PREPARESMOKE ALARMS ......................................... ..................................................................84 PREPARE FIREPLACES PREPARE KITCHEN AND BATH APPLIANCES / FIXTURES.................................................................86 INSTALLEXTERIOR LIGHTING...............................................................................................................87 i INSTALL CEILING FANS AND LIGHTING...............................................................................................87 TESTELECTRICAL SYSTEM.................................................................................................................88 COMPLETE EXTERIOR WORK............................................................................ 89 STEP 1. REPAIR AND SEAL BOTTOM BOARD .............................................................................89 STEP 2. INSTALL GROUND MOISTURE RETARDER.!.......................................................................89 STEP3. INSTALL SKIRTING ......................................... ..............................................:........................ 90 STEP 4. ASSEMBLE OPTIONAL WIND PROTECTION'SHUTTERS...................................................91 STEP 5. COMPLETE SITE -BUILT STRUCTURES ........;......................................................................92 i . PREPARE HOME FOR OCCUPANCY...............:................................................... 93 STEP 1. VERIFY ALTERNATIVE CONSTRUCTION (A/C) INSPECTION............................................93 STEP 2. COMPLETE INSPECTION CHECKLIST.................................................................................93 STEP 3. COMPLETE ENERGY STAR CHECKLIST.............................................................................93 STEP4. CLEAN THE HOME.................................................................................................................93 COMPLETE INSTALLATION CHECKLIST ......... :.................................................. 94 MANU.ACTUEED BEAUTI.ULLY- Manufacturer's Installation Manual - June 2015 PFS#a Conforms t0 HUD MHCSS 4/27/15 Using the Manual This manual is organized into a required for the specific home t identify sections of the manual 1 and materials required for your After reviewing the entire manu installation and follow the arrow umn corresponding to the home initions, p. 2). Then complete t If using an alternative Consult the system rr Getting Started (p. 6) Prepare the Site (p. 10) Install Footings (p. 15) Set the Home (p. 28) ♦ - Install Stabilizing System (p. 60) Connect Utilities (p. 71) Prepare Appliances and Equipment (p.79) Complete Under the Home and Site Built Structures (p. 89) Prepare Home for Occupancy (p. 93) Complete Installation Checklist (p. 94) Disclaimer The Manufactured Housing or guarantee, express orim home, nor assume any liabi use. Copyright © 2008 Manufact eries of steps that will take you through the entire installation process using only those pages ing installed. First, review the entire manual, including the Introduction chapter. As you read it, at you will need; identify'other documents or information you will need; construct lists of tools articular installation; and make sure you have everything you need before starting work. refer to the sequence of installation steps in the table below. Identify the pathway for your downward. Select either Single Section Home or a Multi -Section Home and choose the col - foundation type, either Pier and Ground Anchor or Load -Bearing Perimeter Wall (see Def- work in each of the sections starting with Getting Started. y) foundation system, the installation process will change from that described in this manual. directions for instructions. See page 5 for alternative foundation system criteria. Getting Started (p. 6) Prepare the Site (p. 10) Construct Foundation (p. 26) Connect Utilities (p. 71) Prepare Appliances and Equipment (p.79) Complete Under the Home and Site Built Structures (p. 89) Prepare Home for Occupancy (p. 93) Complete Installation Checklist (p. 94) Getting Started (p. 6) Prepare the Site (p. 10) Install Footings (p. 15) Set the Home (p. 28) Complete Multi -Section Set (p. 34) Complete Roof and Exterior Walls (p. 44) Connect Crossovers (p. 49) Complete Interior (p. 58) Install Stabilizing System (P'. 60) Connect Utilities (p. 71) Prepare Appliances and Equipment (p.79) Complete Under the Home and Site Built Structures. (p. 89) ♦' Prepare Home for Occupancy (p. 93) Complete Installation Checklist (p. 94) Getting Started (p. 6) Prepare the Site (p. 10) Construct Foundation (p. 26) Complete Roof and Exterior Walls (p. 44) Connect Crossovers (p. 49) Complete Interior (p. 58) Connect Utilities (p. 71) Prepare Appliances and Equipment (p.79) Complete Under the Home and Site Built Structures (p. 89) Prepare Home for Occupancy (p. 93) Complete Installation Checklist (p. 94) search Alliance, its members, consultants, contractors and representatives make no representations, warranty d, as to the accuracy or appropriateness of any materials or information in this manual for use in a specific for the use of the information, methods, or materials contained herein, or for damages arising from any such Housing Research Alliance ISSN 1529-3424 iv Manufacturer's Installation Manual - June 2015 MANU/ACTUMlD ICAUTIIUIIY• Introduction This installation manual contains instructions that must be followed for the proper installation of the home. It complies with the HUD Model Manufactured Home Installation Standards. Please read all instructions and any other documents (includ- ing addendum pages and supplements) that may apply to the specific home prior to commencing site work or installation. This installation manual covers permits and site work through final inspection of the installation. It covers both single and multi -section homes installed over pier and anchor, load bearing crawl space walls and basement foundations. It contains instructions, including specifications and procedures, for the set and hookup of manufactured homes to be used as single- family dwellings. The importance of correct installation cannot be over -emphasized. Correct installation is absolutely essential to home- owner satisfaction and the structural integrity of the home. All instructions must be followed to provide the customer with a safe, quality home. No manual can cover all circumstances that may exist for certain home designs or building sites. For questions, further clarification, or if you encounter conditions at the site or in the design of the home or its foundation not covered by this manual, please contact the manufacturer (see Resources, p. 1), a registered engineer, or registered architect. Supplemental addendum pages may be included with this manual. Supplements include requirements not covered in this manual or that supersede the manual instructions. Once the home installation is complete, leave this manual with the home. IMPORTANT NOTICES • The home manufacturer is not responsible for installation or for the materials supplied by the set-up crew at the. time of installation. The installer may be responsible fo(any deviations from the installation instructions of this manual. • To keep the home in compliance with its warranty, the home installation must follow the procedures described in this manual or other procedures approved by the manufacturer. Deviation from the instructions in this manual may void the home's warranty. Any alterations or changes to the home shall be approved by a registered engi- neer or registered architect and may still be subject to warranty violations. • When an installer does not provide support and anchorage in accordance with the approved manufacturer's in- stallation instructions, or encounters site conditions (such as areas that are subject to flood damage or high seismic risk) or other conditions that prevent the use of the instructions provided in this manual, the installer must obtain special site -specific instructions from the manufacturer or use a design approved by a registered engineer or registered architect. • The installer must possess a valid installation license as,a manufactured home installer. i • If the installer identifies failures of the home to comply with the Federal Manufactured Home Construction and Safety Standards (the HUD Code), the installer must notify the manufacturer and retailer. SAFETY There are potential hazards associated with the installation of a manufactured home. Home installers are licensed, and as experienced professionals, should recognize these hazards, be qualified to work with them, and be capable of providing safe work practices and equipment that minimize the risks of injury,. Only qualified persons should install a manufactured home. As qualified professionals in the field of manufactured home installation, installers are the experts and must be aware of the hazards and conditions faced. Warnings are published throughout this manual as reminders. These reminders may not cover all hazards, all potential hazards, or all possible consequences of improper or unsafe installation practices. Construction crews should be trained in the skills required and be supervised by experienced personnel. Installers should regularly inspect work performed by crews and subcontractors. Obey OSHA regulations, particularly those related to home construction, such as Title 29 Code of Regulations Part 1926. For copies of OSHA regulations, call (202) 512-1800 or visit www.osha.gov on the web. RESOURCES Manufacturer contact information: See Back Cover 0, M,��,,�r�.�„e �T FULLY- Manufacturer's Installation Manual - June 2015 Office of Regulatory Affairs and Manufactured Housing US Department of Housi g and Urban Development 451 Seventh Street, SW,�Room 9164 Washington, DC 20410-8000 Telephone: (202) 708-6423 or (800) 927-2891 FAX: (202) 708-4213 1 State Administrative Agenc`es A list of SAA's may be fond on the web at www.hud.gov or by contacting the Office of Regulatory Affairs and Manu- factured Housing. FEDERAL PREEMPTION This home was engineered, constructed, and inspected in conformance with the Federal Manufactured Home Construc- tion and Safety Standards oflthe US Department of Housing and Urban Development (24 CFR Part 3280, commonly re- ferred to as the "HUD Code") in effect on the date of manufacture. These Standards set forth minimum requirements for the design and construction of manufactured homes designed to be used as dwellings. Individual states, counties ar�d cities shall have no authority to establish standards regarding the construction or safety of a manufactured home. A metal certification label is affixed to each section of the home to certify that it has been con- structed and inspected to comply with -these Standards. The design plans and in -plant construction of all homes are in- spected by independent third party agencies to assure compliance with the Standards. The installation of the home and any alterations made to the home shall conform to the requirements of the Federal Manufactured Home Constr ction and Safety Standards and the HUD Model Manufactured Home Installation Standards. These installation instructions are minimum requirements. Applicable local or state laws may have more stringent installa- tion requirements than outlined in this manual and must be followed. Consult with the local authority having jurisdiction (LAHJ) for regulations that may require licenses and/or permits or which may affect procedures described in this manual. DEFINITIONS ANCHOR ASSEMBLY. Any device or other means designed to transfer loads to the ground. ANCHORING EQUIPMENT. Ties, straps, cables, turnbuckles, chains, and other approved components, including tension- ing devices that are used to secure a manufactured home to anchor assemblies. ANCHORING SYSTEM. A I combination of anchoring equipment and anchor assemblies that will, when properly designed and installed, resist th� uplift, overturning, and lateral forces on the manufactured home. BASEMENT. A load-bearinlg perimeter wall foundation that includes habitable space (finished or unfinished, heated or unheated) partly or completely below grade. CRAWLSPACE. The spacl underneath the home's floor system, enclosed with either load- or non -load bearing perimeter walls. The ground may be covered with a concrete slab or by a plastic ground cover. Crawlspace walls must be vent- ed. CROSSOVERS. Utility interconnections between sections of multi -section homes, including heating and cooling ducts, electrical circuits, and �J!water pipes, drain plumbing, and gas lines. DATA PLATE. An information sheet located at the main electrical panel, in the utility room, in a bedroom closet, or in a cabinet in the kitchen.) It contains a unique identification number and identifies the wind zone, roof load zone, and cli- matic zone for which the home was constructed. DIAGONAL TIE. A tie intelhded to resist horizontal or shear forces, but which may resist vertical, uplift, and overturning forces. FOOTING. That portion of the support system that transmits loads directly to the soil. GROUND ANCHOR. A specific anchoring assembly device designed to transfer home loads to the ground. H-BEAM. Steel H-beams are often used to support a home over a basement or crawlspace. They span across the foun- dation from sidewall to sidewall, typically with an intermediate support pier and footing (typically in the center point re- sulting in a line of pieirs under the centerline of a double section home). INFORMATION PACKE I. A set of important documents provided with the home including warranties, information on high wind coverage, and i other features of the specific home. INSTALLATION LICENSE. The proof that an installer meets the requirements for installing manufactured homes under the HUD -administered installation program. 2 Manufacturer's Installation Manual - June 2015 MANUfAC uU EEAU•-Y' LABELED. Equipment or materials to which has been attached a label, symbol, or other identifying mark of a certified testing laboratory, inspection agency, or other an organization concerned with product evaluation. The label indicates compliance with nationally recognized standards or tests to determine suitable usage in a specified manner. LISTED OR CERTIFIED. Included in a list published by a nationally recognized testing laboratory, inspection agency, or other organization concerned with product evaluation that maintains periodic inspection of production of listed equip- ment or materials, and whose listing states either that the equipment or material meets nationally recognized stand- ards or has been tested and found suitable for use in a specified manner. LOAD -BEARING PERIMETER WALL FOUNDATION. A support system for the home whereby the home is mechanically fastened to a structural wall(s) that transfers gravity, lateral, -and uplift loads to the ground. LOCAL AUTHORITY HAVING JURISDICTION (LAHJ). The state, city, county, municipality, utility, or organization that has local responsibilities that must be complied with during the installation of a manufactured home. MUST. Indicates a mandatory requirement. NIA. Indicates not applicable. PIER. That portion of the support system between the footing and the manufactured home, exclusive of shims. Types of piers include, but are not limited to: (1) manufactured steel stands; (2) pressure -treated wood; (3) manufactured con- crete stands; (4) concrete blocks; and (5) portions of foundation walls. PIER AND GROUND ANCHOR FOUNDATION. A support system for the home that employs piers under the chassis and other locations to support gravity loads and employs ground anchors and tie downs (the stabilizing system) to resist lateral and uplift loads. PERIMETER BLOCKING. Regularly spaced piers supporting the'sidewalls and marriage line of the home. Some homes require perimeter blocking in addition to supports under the home's frame. QUALIFIED. Has the necessary knowledge and skills gained from experience and training that will allow performance of the job safely, competently, and in accordance with all applicable codes, standards, rules, and regulations. Meets all necessary qualification tests including any license and certification requirements that may be in effect in the area where the home will be installed. RAMADA. Any freestanding roof or shade structure, installed or erected over a manufactured home or any portion there- of. SHOULD. Indicates a recommendation that is strongly advised but not mandatory. SHALL. Indicates a mandatory requirement. SITE FOR A MANUFACTURED HOME. A designated parcel of land designed for the accommodation of one manufac- tured home, its accessory buildings or structures, and accessory equipment, for the exclusive use of the occupants of the home. SKIRTING. A weather -resistant material used to enclose the perimeter, under the living area of the home, from the bottom of the manufactured home to grade. STABILIZING SYSTEM. All components of the anchoring and support systems, such as piers, footings, ties, anchoring equipment, anchoring assemblies, or any other equipment, materials and methods of construction, that support and secure the manufactured home to the ground. SUPPORT SYSTEM. Pilings, columns, a combination of footings, piers, foundation walls, caps, and shims and any com- bination thereof that will, when properly installed, support and secure the manufactured home to the ground. TIE. Straps, cable, or securing devices used to connect the manufactured home to anchoring assemblies. UTILITY CONNECTION. The connection of the manufactured home to utilities that include, but are not limited to, electrici- ty, water, sewer, gas, or fuel oil. VERTICAL TIE. A tie intended to resist uplifting and overturning forces. WIND ZONE. The areas designated on the Basic Wind Zone Map, as further defined by the Manufactured Home Con- struction and Safety Standards. ENGINEER'S STAMP Certain pages of this manual that contain tables or conditions which are not included in HUD's Model Installation stand- ards shall display the seal of a registered engineer. Federal guidelines only require the seal from one state to be dis- played, but the details herein apply to all states. See HUD standards 3280.2 for Definition of Professional Engineer. Manufacturer's Installation Manual - June 2015 3 SYMBOLS USED IN THE MANUAL This icon indicates an important warning. It is critical to heed these warnings. /Z This icon indicates a recommended best practice. While not required, following these practices will result in a superior installation, reducing the chance that cosmetic or dura- bility related complaints might arise. ABBREVIATIONS ABS............ Acrylonitrile Butadiene Styrene max............ Maximum MHCSS ....... Manufactured Home Construction and ANSI ........... American National Standards Institute Safety Standards APA............ I American Plywood Association min ............. Minimum ASTM ......... I American Society 9 ociet for Testing and Materials Mph ............. Mile(s) per hour NEC National Electric Code AWPA ........ American Wood Preservers Association ............. NFIP ............ National Flood Insurance Program CFM............ Cubic feet er minute NFPA .......... National Fire Protection Association CFR............ Code of Federal Regulations DWV ........... Drain, Waite, Vent o.c.............. On center I OSHA.......... Occupational Safety and Health Administration EMT............ Electrical etallic tubing FEMA......... Federal E ergency Management Agency Oz................ Ounce(s) Ft ................ Foot/feet p . ................ Page Psf............... Pounds per square foot Ga............... Gauge HUD............ US Department of Housing and Psi ............... Pounds per square inch Urban Development SAA ............. State Administrative Agency In ................ Inch(es) sq ft ............. Square foot/feet LAHJ .......... Local Authority Having Jurisdiction lb(s) ........... Pound(si 4 Manufacturer's Installation Manual - June 2015 MAHVIACTUI[D �LAUT•VIIT• ALTERNATIVE TIE -DOWN AND/OR FOUNDATION SYSTEMS Champion approves the use of an alternative foundation system if first reviewed and accepted by the Local Authority Hav- ing Jurisdiction (LAHJ) and a recognized HUD Third Party Agency. All systems must also meet one of the following: • Systems or designs are manufactured and installed in -accordance with their listings by a nationally recognized testing agency based on a nationally recognized testing protocol; or • System designs are prepared by a registered engineer or a registered architect or tested and certified by a regis- tered engineer or registered architect in accordance with acceptable engineering practice and are manufactured and installed so as not to take the home out of compliance with the Manufactured Home Construction and Safety Standards. DISPLAY AND STORAGE OF THE HOME WEATHER PROTECTION If the installation is not started immediately upon delivery of the home, the retailer and/or installer has the responsibility to ensure the exterior weather protection covering of marriage walls and the roof of homes with hinged roofs has not been damaged during shipment. Inspect the home immediately upon the delivery and frequently during storage. Promptly repair tears in the home closure materials to prevent damage from the 'elements. Inspect and repair roof shingles and siding as needed. SUPPORTING A HOME FOR DISPLAY When a new or used manufactured home is to be displayed at a retail location, temporarily block and support the home. Set up single -section homes with single block piers spaced no further apart than 12 feet o.c. beneath each I-beam. The tire and axle system may be used as one of these required supports, and the hitch jack may be used as another. Locate the first pier no further than two feet from the rear end of the home (Figure 1). Place additional piers along the perimeter on either side of openings greater than four feet (i.e. sliding glass doors, bay windows, etc.). For multi -section homes, locate additional piers along the marriage line under support columns. These locations will be marked by the manufacturer. 2, o^ 12.-0- 12-4- Figure 1. Supporting a home for display For all homes, place footings below each pier. Footings may be placed directly on the surface grade without excavation and may be ABS pads, 2 x 10 by 16 inch long pressure treated lumber or 16" x 16" by 4 inch thick concrete pads. SUPPORTING A HOME FOR STORAGE To prevent damage to homes being stored but not on display (i.e. people shall not be permitted inside the home) for a pe- riod exceeding 30 days, locate piers below each I-beam no further than two feet from each end of the home and at the approximate center between the tire and axle system and pier at hitch end of home. Whether the home is being supported for display or storage the height of the home should be no higher than 36" as measured from the top of the ground to the bottom of the I-beam. I;n addition, it is extremely important that the roof/ridge vents are installed while the home is on display. Failure to install the roof/ridge vents may lead to significant damage to the roof and home. • Manufacturer's Installation Manual -June 2015 5 MANUFACTURED BEAUTIFULLY, Getting S This chapter covers a few rted that, taken now, will avoid problems later in the installation process. STEP 1. LOCATE THE DATA PLATE Locate the data plate insideithe home (Figure 2), typically inside a kitchen cabinet door or on a wall panel or door f ,ce near the electrical 'Panel, utility room, or bedroom closet. The information on the dada plate will be used to verify that the home was designed for the proper location. STEP 2. CONFIRM WIND ZONE From Table 1, identify the Iwind zone for the home. Verify that the home conforms to the following rules and any special requirements determined by the LAHJ. • No home may be located in a higher wind zone than that indicated on the da- ta plate. (Examp�e: a home designed for Wind Zone II cannot be placed in Wind Zone III.) • A home may be located In a lower wind zone than that indicated on the data plate. (Example: a home designed for Wind Zone II can be placed in either Wind Zone II or .) • Homes located within 1,500 feet of the coastline in Wind Zones II and III must be designed to 7ithstand exposure 'D' conditions. This will be indicated on the data plate. If the home does not conform to these rules, contact the manufacturer immediately. Figure 2. Sample data plate Shown as reference only. Actual data plate may vary. V&*Irliorz Site appropriateness. If the site is not accessible, not appropriate for the planned support system or cannot be properly graded, notify the purchaser, the retailer and HUD, with the reasons why the site is unsuitable. Do not install the home until all issues are remedied. Manufacturer's Installation Manual - June 2015 CHAMPION' 9 TART P 1 WINr1 7f)NP RY LOCALITY Wind Zone I All areas except those areas listed below as being within Wind Zone Ikor III • ... Counties of Baldwin and Mobile_ All counties except those listed below as within Wind Zone III ... Counties of Bryan, Camden, Chatham, Glynn, Liberty, McIntosh Parishes of Acadia, Allen, Ascension, Assumption,'Calcasieu, Cameron, East Baton Rouge, East Feliciana, Evangeline, Iberia, Iberville, Jefferson Davis, Lafayette, Livingston, Pointe Coupee, St. Helena, St. James, St. John the Baptist, St. Landry, St. Martin, St. Tammany, Tangipahoa, Vermillion, Washington, West Baton Rouge, and West Feliciana Counties of Hancock and Washington Counties of Barnstable, Bristol, Dukes, Nantucket, and Plymouth •. Counties of George, Hancock, Harrison, Jackson, Pearl River; and Stone .. Counties of Beaufort, Brunswick, Camden, Chowan, Columbus, Craven, Currituck, Jones, New Hanover, Onslow, Pamlico, Pasquotank, Pender, Perquimans, Tyrrell, and Washington Counties of Beaufort, Berkeley, Charleston, Colleton, Dorchester, Georgetown, Horry, Jasper, and Williamsburg Counties of Aransas, Brazoria, Calhoun, Cameron, Chambers, Galveston, Jefferson, Kennedy, Kleberg, Matagor- da, Nueces, Orange, Refugio, San Patricio, and Wiliacy Cities of Chesapeake, Norfolk, Portsmouth, Princess Anne, and Virginia Beach Entire state • ' Coastal regions (as determined by the 90 mph isotach on the ANSI/ASCE 7-88 map) Counties of Broward, Charlotte, Collier, Dade, Franklin, Gulf, Hendry, Lee, Martin, Manatee, Monroe, Palm Beach, Pinellas, and Sarasota Parishes of Jefferson, La Fourche, Orleans, Plaquemines, St. Bernard, St. Charles, St. Mary, and Terrebonne Counties of Carteret, Dare, and Hyde • All regions of the U.S. Territories of American Samoa, Guam, Northern Mariana Islands, Puerto Rico, Trust Territo- ry of the Pacific Islands, and the United States Virginilslands STEP 3. CONFIRM THERMAL ZONE From Figure 3, identify the thermal (UO) zone for the home. Verify that the home con- forms to the following rules. • No home may be located in an area with a higher thermal zone number than that indicated on the data plate. (Example: a home designed for Thermal Zone 2 cannot be placed in Thermal Zone 3.) • A home may be located in a lower thermal zone than that indicated on the data plate. (Example: a home designed for Thermal Zone 2 may be placed in either Thermal Zone 2 or 1.) • In no case may a home designated for installation in the "Humid & Fringe Cli- mate," as identified on the data plate, be located outside of this region (Table 2). If the home does not conform to these rules, contact the manufacturer immediately. W, 1 I u rmo�, aua ease un Figure 3. Thermal (UO) zone map • Manufacturer's Installation Manual - June 2015 7 MANUFA<TUPED BEAUTIiULLY- TARI F 2_ HUMID AND FRINGE CLIMATE ZnNFS Fringe Climate Zone -• Alabama Escambla Geneva, Henry, Houston, Lowndes, Marengo, Mobile, M nr e, Montgomery, Pike, Washington, and Wilcox ,f Florida All counties and locations Georgia Counties iof Appling, Atkinson, Bacon, Baker, ,Ben. Hill, Berrien, Brantley, Brooks, Bryan; Calhoun; Camden, Char-. leton, Chatham, Clay, Clinch, Coffee, Colquitt, Cook, Crisp,gDecatur, Dougherty, Early, Echols, Effingham, Evans, Glynn, Grady, Irwin, Jeff Davis, Lanier; Lee, Liberty, Long, Lowndes, McIntosh, Miller, Mitchell, Pierce, Quitman, Randolpli, Seminole, Tattnall', Terrell,, Thomas, Tift, Turner, Ware; Wayne, and, Worth Hawaii All count es and locations Louisiana All countiesand locations -- - I I-- Mississippi Counties of Adams, Amite, Claiborne, Clarke, Copiah, Covington, Forrest, Franklin, George, Greene, Hancock, Harrison Hinds, Issaquena, Jackson, Jasper, Jefferson, Jefferson Davis, Jones, Lamar, Lawrence, Lincoln, Mari- on, Pearl River, Perry, Pike, Rankin, Simpson, Smith, Stone, Walthall, Warren, Wayne, and Wilkinson Norths of Brunswick, Carteret, Columbus, New Hanover, Onslow, and Pender South Carolina Countie I of Beaufort, Berkeley, Charleston, Colleton, Dorchester, Georgetown, Horry, and Jasper Texas Counties of Anderson, Angelina, Aransas, Atascosa; Austin, Bastrop, Bee, Bexar, Brazoria, Brazos, :Brooks, Bur- leson, Caldwell, Calhoun, Cameron, Camp, Cass, Chambers, Cherokee, Colorado, Comal, De Witt, Dimmit, Duval, Falls, Fayette, Fort Bend, Franklin, Freestone, Frio, Galveston;'Goliad, Gonzales, Gregg, Grimes, Guadalupe, Hardin, Harris„ Harrison,' Hays, Henderson, Hidalgo, Hopkins•, Houston, Jackson, Jasper, Jefferson,'Jim Hogg, Jim Well§, Karnes, Kaufman, Kennedy,'Kinney, Kleberg, La Salle, Lavaca, Lee, Leon, Liberty, Limestone, Live Oak; Madison, Marion, Matagorda; Maverick, McMullen, Medina, Milam, Montgomery, Morris, Nacogdoches, Navarro, Newton) Nueces, Orange, Panola, Polk, :Rains, Refugio, Robertson, Rusk, Sabine, San Augustine, San Jacinto, San Patricio, Shelby, Smith, Starr, Titus, Travis, Trinity, Tyler, Upshur, Uvalde, ValVerde, Van Zandt, Victoria, Walker,Waller, Washington, Webb, Wharton; Willacy, Williamson,Wilson, Wood, Zapata, and Zavala Puerto Rico All Locations STEP 4. CONFI From Table 3, identify thi forms to the following rule • No home may b on the data plat Load Zone canr • A home may be on the data plat Load Zone may • There are speci the map. Contai home's data pla high roof load a • Ramadas may t Ramadas are td must be for weal ;M ROOF LOAD ZONE Roof Load Zone for the home. Verify that the home con - placed in an area with a higher roof load than that indicated (Example: a home designed for the South (20 psf) Roof t be placed in the Middle (30 psf) Roof Load Zone). )cated in an area with a lower roof load than that indicated (Example: a home designed for the Middle (30 psf) Roof e placed in the South (20 psf) Roof Load Zone). high roof load areas (primarily in mountains) not shown on the LAHJ or SAA for information about these areas. The will indicate if the home has been designed for one of these used in areas with roof live loads greater than 40 psf. be self-supporting, except that any connection to the home herproofing only. TABLE 3. ROOF LOADS BY LOCALITY North I psf roof All counties Counties of Aroostook,- Piscataqui's, Somerset, Penobscot, Waldo, Knox, Hancock, Washington All counties All counties Counties of:,Buena Vista, Butler, Calhoun, Cerro Gordo, Cherokee, Chickasaw, Clay, Dickinson, Emmet, Floyd, Franklin; Hamilton, Hancock, Hardin,•Howard, Humboldt, Ida, Kossuth, Lyon, Mitchell, O'Brien, Osceola, Palo Alto, Plymouth, Pocahontas, Sac, Sioux, Webster, Winnebago, Worth, Wright Counties of Androscoggin, Cumberland, Franklin, Kanabec, Lincoln, Oxford, Sagadahoc, York County of Essex ' T 8 Manufacturer's Installation Manual - June 2015 1 MAHurAetu.....Auivuur- Counties of Alger, Alcona, Alpena, Antrim, Baraga, Benzie, Charlevoix, Cheboygan, Chippewa, Crawford, Delta, Dickson, Emmet, Gogebic, Grand Traverse, Houghton, Iron, Kalkaska, Keweenaw, Leelanau, Luce, Mackinac, Marquette, Menominee, Missaukee, Montmorency; Ogemaw, Ontonagon, Oscoda, Otsego, Presque Isle, Ros- common, Schoolcraft, Wexford Counties of Aitkin, Anoka, Benton, Blue Earth, Brown, Cass, Carlton, Carver, Chippewa, Chisago, Cook, Cotton- wood, Crow Wing, Dakota, Dodge, Douglas, Faribault; Fillmore, Freeborn, Goodhue, Grant, Hennepin, Hubbard, Itasca, Isanti, Jackson, Kandiyohi, Kanabec, Koochiching, Lac qui Parle, Lake, Le Sueur, Lincoln, Lyon, McLeod, Meeker, Morrison, Millie Lacs, Mower, Martin, Murray, Nicollet, Nobles, Olmsted, Pipestone, Pine, Pope, Ramsey, Redwood, Renville, Rice, Rock, St. Louis, Sibley, Scott,Steele, Sherburne, Swift, Steams, Stevens, Todd, Wade- na, Wright, Washington, Wabasha, Winona, Waseca, Watonwan, Yellow Medicine All Counties All Counties Counties of Cayuga, Clinton, Essex, Erie, Franklin, Fulton, Genesee, Hamilton, Herkimer, Jefferson, Lewis, Living- ston, Madison, Monroe, Montgomery, Niagara, Oneida, Onondaga, Ontario, Orleans, Oswego, St. Lawrence, Sara- toga, Schenectady, Seneca, Warren, Washington, Wayne, Wyoming, Yates Counties of Brookings, Clay, Codington, Deuel, Grant, Hamlin, Hanson, Hutchinson, Kingsbury, Lake, Lincoln, McCook, Miner, Minnehaha, Moody, Turner, Union, Yankee All Counties Counties of Addison, Caledonia, Chittenden, Essex,;Franklin, Grand Isle, Lamoille, Orange, Orleans, Rutland, Washington, Windsor Counties of Ashland, Bayfield, Barron, Buffalo, Burnett, Clark, Chippewa, Door, Douglas, Dunn, Eau Claire, Flor- ence, Forest, Iron, Jackson, Langlade, Lincoln, Marathon, Marinette, Menominee, Oconto, Oneida, Pepin, Pierce, Polk, Price, Rusk, St. Croix, Sawyer, Taylor, Trempealeau, Vilas, Washburn All Counties The states and counties not listed for the Middle or North roof load zone above are deemed to be within the South roof load zone. STEP 5. CHECK LOCAL CODES AND SECURE PERMITS Local regulations may set conditions for the siting and installation of a manufactured home. Consult the LAHJ, state manufactured housing association, and the state SAA (See Resources, p. 1) for the specific local requirements, including: • Building codes that may affect the construction of site built structures and infrastructure. • Local requirements regulating the installation of manufactured homes. • Setback requirements for property lines, streets, yards, and courts. Fire separation distances. • Development covenants for the specific property. • The locations of flood hazard areas and any special foundation requirements for homes installed in those areas. • In some areas, building permits are required to install manufactured homes. Prior to making any alteration to the site and the home, contact the LAHJ to determine if plan approval and permits are required. Areas subject to flooding. The foundation specifica- tions contained in this manual are NOT intended to address flood loads. If the home is in the flood plain, consult a registered engineer. MANUFACTURED BEAUTIMLY' Manufacturer's Installation Manual - June 2015 9 Prepare t A properly prepared site is This chapter explains the F home's support system. STEP 1.. ,STEP 2. STEP 3. STEV4. STEPf 5. e Site to a good quality installation and the long term structural stability of the home. of planning the site, evaluating the soil, and preparing the site for construction of the PLAN SITE ACCESS (p. 10) DETERMINE HOME'LOCATION AND LAYOUT (p..10) CLEAR AND GRADE THE SITE' (p..1,1') DETERMINE SOIL CONDITIONS (p. 11') DETERMINE SOIL BEARING CAPACITY AND FROST LINE (p. 12) 'STEP 6. DETERMINE GROUND ANCHOR HOLDING CAPACITY (p. 14) STEP 1. PLAN SITE ACCESS Planning the route to the site is typically the responsibility of the retailer or transportation company. Whoever is resI onsible must secure state permits from the states through which the home will pass. In planning the route, avoid obstructions that might interfere with the passage of the home, such as low hangs , g wires and trees, low overpasses, and bridges not suitable for the load. Contact the utility company if wires need to be moved. Do not allow branches, bushes, or other foliage to scrape against the home as the home is moved to the site. Avoid ditches, lberms, steep slopes, and soft ground. Identify and fill any holes and soft spots into which the transporter's wheels may sink. Avoid moving over steep changes in grade (20 degrees or more). If required, provide for home storage and staging areas on the site. Plan the delivery and staging of home sections and materials so that after all deliveries are complete, home sections and materials can be accessed for use and installed in the appropriate sequence. Orient home sections so they do not have to be rotated or excessively maneuvered during the installation process. Plan for temporary needs, such as dumpsters, portable toilets, crew parking, delivery vehicle drop-offs and concrete mixer deliveries. Before moving the manufactured home to the site, inform the LAHJ and make sure the site is prepared and utilities are available. STEP 2. DETERMINE HOME LOCATION AND LAYOUT The home location may ave already been determined by others. If not, plan the home location and layout in compliance with the regulations researched in Getting Started, STEP 5. CHECK LOCAL CODES AND SECURE PERMITS (p. 9). Contact utilities for locations of existing infrastructure, such as underground cables, pipes, and electrical lines. I When planning the site'mprovements, consider the following: • The home location should be level. • Avoid contact With large trees, steep slopes, poorly drained areas, and poten- tial flood zones. • Preserve trees and shrubs for shade, visual screens, and windbreaks. • Plan the drive] ay, parking areas, septic, well, other structures, and utility lines. • Consider future additions, such as screen rooms, porches, and awnings. • Site the home away from natural water paths. ' // Site Preparation. The home manufacturer has. no con- trol over the site planning and installation of the home unless the manufacturer is responsible for the home's installation. Final responsi- bility for site preparation, including soil stability and frost heave control, lies with the installer. An improperly prepared site may result in the denial of a foundation - related warranty claim. ' // Fire separation. Comply with any LAHJ fire separa- tion requirements or the re- quirements NFPA 501A, 2003 edition (Chapter 6). 10 Manufacturer's Installation Manual - June 2015 STEP 3. CLEAR AND GRADE THE SITE Trim overhanging foliage considering future growth, potential storms, swaying in wind and snow/ice-weighted branches. Remove organic material such as vegetation, wood, roots, twigs, dead branches, grass, and brush from directly under the home. Remove any debris that could become termite infested from the site and surrounding area. Re- move all other debris from the home location, including roots from beneath footing loca- tions. Properly dispose of all items. Crown the site (Figure 4) so that water will not accumulate or stand underneath the home. Also, slope away from the foundation for the first ten feet with a minimum slope of 1/2 inch per foot. Where property lines, walls, slopes, or other, physical conditions prohibit this slope, provide the site with drains, swales, or grading to drain water away from the structure. Any fill required to grade the site should be inorganic "controlled fill" applied in a maximum of four inch layers, compacted between each layer to at least 90% of its maximum relative density. Direct runoff away from the site using ditches and berms (Figure 5). If .the home will have skirting, start grading from two feet in from the edge of the home. k Al- y Hc use y A�' y y � yyyyy y y, Avows Indicate direction of water i flow. Grade the ground so that water under porches, decks, and recessed entries flows away from the home. If proper grading is not possible, use other methods such as a drain tile and automatic sump pump system to remove any water that may collect un- der the home. The home is suitable for the installation of gutters and downspouts. When gutters and downspouts are installed, direct runoff away from the home. STEP 4. DETERMINE SOIL CONDITIONS Examine the soil type under the proposed home location to make sure it is suitable for placement of a home. The design of the home's support system, including footing/pier spacing and size, will in part be determined by the bearing capacity of the soil, and ground anchors by the soil's withdrawal strength. The soil under every portion of the support system must meet the following criteria: The soil must be firm and undisturbed (not previously excavated) or fill com- pacted to at least 90% of its maximum relative density. Uncompacted fill will set- tle over time, causing the home to shift and become unleveled. Fill must not contain large debris. This too will settle over time. The soil must not be comprised of organic clays or peat. Organic material can decay, causing settlement, and also may harbor pests that can infest the home. The water table must be below the lowest level of the planned support system/ foundation. A soil's bearing capacity can be greatly reduced when it is saturated with water. Note that water tables may vary with seasonal or climactic condi- tions. Consult a geologist or the LAHJ if you are unsure of the water table level. Z&*�� Site drainage. Moisture un- der the home can result in structural damage to the floor system and other parts of the home. Failure to provide,adequate slope/drainage can result in moisture -related problems such as mold, mildew, and erosion. Figure 4. (Left) Crown or keep soil flat under the home be- tween the outer beams to pre- vent water ponding Figure 5. (Right) Direct runoff away from the home Soil. Inadequate soil bearing capacity or a support system mismatched to the soil char- acteristics can result in ex- cessive or differential set- tlement of the home, which can cause the home to go out of level, resulting in jammed doors and windows, cracks in finishes and rup- tured plumbing connections. M.��.��,�q.o aeAUT1fV1Y_ Manufacturer's Installation Manual - June 2015 1 1 • The soil must not bye a highly expansive type. Expansive soils can expand when they become saturated with water, causing the home to shift and become un- leveled. If soils are expansive, contact a registered engineer, or registered ar- chitect to assist wit, the design of the foundation system. STEP 5. DETERMINE SOIL -BEARING CAPACITY AND FROST LINE The soil under a home must be capable of withstanding the loads imposed by the weight of the home, its support system and furnishings, as well as any loads imposed by wind, snow, or other climactic conditions. SOIL -BEARING CAPACITY Determine the soil -bearing capacity in pounds per square foot (psf) before designing a support system. The higher the capacity (psf), the more weight the soil can hold without unduly compressing. As the soil -bearing capacity increases, footings can be reduced in size or spaced farther apart. Use one or more of the fol�owing methods to determine the site's soil bearing capacity: • Test the soil. Hide a registered geologist, registered engineer, or registered architect to dete ine the soil classification and maximum allowable soil bear- ing capacity by testing the soil in accordance with generally accepted engi- neering practice,) • Obtain soil records. The local office of the U.S. Department of Agriculture's Natural Resources Conservation Service (www.soils.usda.Qov) and/or the LAW may haveltest results and/or soil analyses on file for the area. • Conduct a pocket penetrometer test. Use a pocket penetrometer to esti- mate allowable soil -bearing capacity as follows: 1. Select a location that will be under a footing. 2. Clear an area of a minimum of one square foot at least four inches deep or to the depth of the bottom of the planned footing. 3. Using the instructions provided with the pocket penetrometer, take at least five readings. 4. Discard the high and low readings and average the remaining readings. Round this Iresult down to the nearest soil -bearing value shown in the right column of Table 4. 5. Confrim thot the rounded result matches the soil description on Table 4. • Determine soil -bearing value by visual examination. If one of the options above is not mailable, the values on Table 4 can be used to establish soil - bearing capacity by visual examination. This method provides lower capacity values than the options above. Accurate soil identification typically requires special training or expertise. An engineer or building code official may be able to assist in classifvinq the soil found on the site. V&*IrZZA Soil bearing capacity. Sup- port systems on soils with bearing capacities less than 1,000 psf must be designed by a registered engineer or registered architect and approved by the LAHJ. Limitations of pocket pen- etrometers. Pocket pene- trometers do not work on sand or gravel. Use to de- termine allowable pressure for these types of soils. If you encounter a layer of gravel, test the soil under the gravel. Do not put the penetrometer on stones larger than its tip as this will provide an inaccurate reading. 12 Manufacturer's Installation Manual - June 2015 TABLE 4. SOIL -BEARING CAPACITY BY SOIL TYPE ' Soil Type (and classification) Allowable Pressure (psf) Rock or hard, pan (class 1)4,000 Sandy gravel and gravel; very dense and/or cemented sands; 2,000 course gravel/cobbles; preloaded silts, clays and coral (class 2) Sand; silty sand; clayey sand; silty gravel; medium dense course (!1,500 sands; sandy gravel; very stiff silt, sand clays (class 3)4 Clay, sandy clay, silty clay, clayey silt (classes 4A and 4B) 1 X0 Uncompacted fill, peat, organic clays (class 5) Professional testing required Note to table: No allowances made for overburden pressure, embedment depth, water table heiaht. or settlement aroblems. • Use default capacity. Use an allowable pressure of 1,500 psf, unless site - specific information requires the use of lower values based on soil classifica- tion and type according to Table 4. Note that soil types may vary across a home site. In this case, the soil with the lowest bearing capacity should be assumed when designing the support system. Keep a rec- ord of the soil -bearing capacity value; it will be used later to design the home's support system. FROST LINE In climates subject to ground freezing, consult the LAHJ, a registered engineer, or reg- istered architect to determine the depth of the frost line. Figure 6 may be used as a guideline when there is no specific local determination. Keep a record of the frost depth; it will be used later to design the home's support system. 3' d Figure 6. Average frost pene- tration depth (in feet) MANUFACTURED BEAUTIFULLY- Manufacturer's Installation Manual - June 2015 13 iLe YZZA STEP 6. DETERS INE GROUND ANCHOR Torque Probe. Before using HOLDING CAPACITY When using auger -type ground anchors to tie down the home, first, use a torque probe the torque probe, check with the utility companies to determine the anchor -holding strength of the soil on the site. for the location of under - Use a torque probe with a Shaft of sufficient length to test the soil at the depth of the anchor helical plate. Augur the probe into the ground, and following the probe manufac- ground cables or pipes to avoid contact with the turer's instructions, take the torque wrench reading in the area where the anchors will be installed and at the depth of the anchor helix. If the soil varies in consistency across probe shaft. the site, then use the lowest reading. Based on this reading, consult the anchor manu- facturer's charts to select the anchor type(s). 14 Manufacturer's Installation Manual - June 2015 Install Footings This chapter provides instructions for the design and construction of individual footings that transfer.the load from a single pier to the ground. A footing and pier together (discussed in Set the Home) is referred to as a "support." A footing may also be designed to carry the load of multiple piers (often called "strip" footings). The design of strip footings is not covered in this manual. STEP 1. DESIGN POINT LOAD SUPPORTS (p. 15) STEP 2. ' DESIGN FRAME SUPPORTS (Homes Without Perimeter Blocking) (p. 19) STEP 3. DESIGN FRAME AND PERIMETER SUPPORTS (Homes With Perimeter Blocking) (p.20) STEP 4. SELECT FOOTING MATERIALS (p. 22) STEP 5. SIZE FOOTINGS (p. 22) STEP 6. INSTALL FOOTINGS (p. 24) STEP 1. DESIGN POINT LOAD SUPPORTS All homes will need supports, and therefore footings, under the frame, marriage line (for multi -section homes), exterior wall openings and other heavy point loads. The home manufacturer may have provided a blocking diagram (or tags, labels, paint or other markings under the home) indicating the required locations, and/or loads for perime- ter, marriage line and/or frame supports specifically for this home'. If so, the diagram or tags take precedence over the directions provided in this manual. Create a sketch of the home that includes the exterior walls, the frame I -beams and the marriage line(s), if a multi -section home. The sketch will be used in this chapter to locate each support, and note the size of the corresponding footing. Figure 7 is an example of such a support plan. Perimeter Rlnckinn Piers Door Piers •ame Wall Piers iers As the location and load for each support is determined, note it on the sketch. When se- lecting locations for supports, keep in mind that increasing the spacing between supports will increase the load on that support and the size of the required footing. Figure 7. Example of support plan • Manufacturer's Installation Manual - June 2015 15 DETERMINE LOCATIONS Point loads exist where a bee foundation at a specific point. lowing examples: (1) Exterior doors on sit at exterior doors on Note: Listed adjusta exterior door openir tuted if local codes 1 cording to the manu shall not be substitu any home relocatior (2) Other exterior wall c (including multiple v supports, even if in (3) Marriage line opens home has perimetei feet, intermediate si (4) Marriage line pier all (5) Load -bearing porch (6) Under heavy (400 it fireplaces and large (7) Tags require 3 1 (8), Perimeter piers and rear frame (9) Pier each end of Off Set Notes ■ Roof of offset sec ■ Maximum offset • All other offsets r • Offset shall be tie home. Also, pier Mark the required point load the manufacturer has reinfor and so noted in the documei typical point load support loc —Side Wall Or ng/structural weight is concentrated and transferred to the .ocate a support under each point load, including the fol- walls at both sides of each door (blocking is not required n-bearing end walls). outriggers may be used to replace piers below sidewall less than 48". Adjustable outriggers may only be substi- •mit the use of these devices and they are installed ac- ;turer's installation instructions. Adjustable outriggers for other pier applications and must be removed prior to penings four feet and greater at both sides of each opening Iindows that total four feet wide or more without intermediate ividual windows are less than four feet). igs four feet or greater at both sides of each opening (when blocking and marriage line openings are greater than 10 ipports must be placed at maximum 10 feet on center). corner of offset. posts. Is or greater) items, such as heavy furniture, waterbeds, fish tanks. meter piers under each end as shown. uired under front and rear of homes with front cross member ;ssed over 9 inches. over 16 inches out from home. m must have center peak hout center peak is 4 feet in Wind Zone I. ;d installation addendum. down and piered as a single section for that portion of the call be placed at the inside corner where floors join (4). port locations on the sketch. Supports are not required where the floor (such as with additional outriggers or floor joists) m provided with the home. Figure 8 and Figure 9 identify 4' or greater (2) _ Door Piers (1) Frame Walk -A -Bey Piers (9) r� Heavy Load Pler (6) — MaFlag/ W II Piers (3') comer Offsett Pier (4) — — — — — — - - Frame recess Piers (8) or Porch Post Piers (5 7(1),� Off set Door � I — TAG Tag Perimeter Piers (7) Figure 8. Typical point -load support locations 16 Manufacturer's Installation Manual - June 2015 MANUFADTU.FD-FAUTIFUI-- inWdth, Use Comhined Span C + D with a Single Pier] CALCULATE LOADS , Use Table 5 and 5A to determine the loads on point -load supports. For each support, find the columns with the appropriate roof load and section width. Find the row(s) correspond- ing to the span (see Figure 9 for guidance -on determining spans'.— if a support is shared by spans on both sides, add the respective loads together to arrive at the total load under that point). When ridge beam is continuous over support, multiply, load by 1.25. The number in the columns under the "M" and "P" headings are the loads for supports along the marriage line and perimeter respectively (point loads in the center of a section, i.e. not along a marriage line or perimeter wall, require the load in. the "P" column). Inter- polation for openings between those shown in the table is permitted. Note the required loads next to each point load support on the sketch. 720 1340 800 1520 860 - - 2150 4000 2400 4550 2580 - - i 3590 6670 4000 7590 4300 - - �8170 9340 - 10620 9340�r�^� 10670 'I 12r 140 dr "I 1i10670 'I 12r 140 dr li iage Line, P = Perimeter supporting one floor at marriage line, use''/z the above loads) Figure 9. Typical support lo- cations along the marriage line for home not requiring regularly spaced perimeter supports (see figure 12 for homes with regularly spaced perimeter supports) ' O /, Maximum home eaves. are 16 inches for 14 wide or less, and 12 inches for wid- er sections. _' PHILLIP J. ' -co NQ I At {r N EER z} z} NO. {� A 32035 a of°Sslonol E�9T�0 June1,2015 I 17 Manufacturer's Installation Manual - June 2015 MANUFACIU0.ED IEAUTIFUIIY' TABLE 5A. LOAD ON POINT -LOAD FOOTINGS — Ibs. (FRAME AND PERIMETER WITH MARRIAGE LINE SUPPORTS) 2340 1410 2670 1580 3040 1700 3500 1930 3040 1840 3470 2060 3950 2220 4550 2520 --- r--°-or v — , 3040' 1840 34 0 '' 2060 +t 395, 2 4550 l�n 2520 6, 3� 9 0 l( 2410 n 4540 ip 2700 5T60' U 2900 5+ 950 ,' 033 0 3740 2270 4270 2540 4860 2730 5600 3100 4900 2990 5600 3340 6370 3590 7350 4080 4440 27001�5070 �� 3020 5770 ✓, 3250 6650 (; `3690 5840 3560 ` 66 13980 , 7590 +; 4280 ; 8l 750 „ 4860 0 3130 66 0 3500 r' 6680 (S 3760 7700 'n 4270�6770 y4130 i 8800 4620 10 00 �496010150 5640 514 -313 58 584 b 670 7590 6 7700 4 8800 ( y 10010 „11550'p' 6540 7470 8500 9800 8640 9870 11230 12950 - -8�1 ��-4W0F , 1085 i— 9 75 0 r 10940.0 j 12440 {J 1435— a 7240 ? - 827011 {� 9410 d Roof load.section ... width .0 PSF Live Load 3740 2270 4270 2540 4860 2730 4640 3100 4260 3130 4870 3500 5540 3760 " - 4900 y 2990 5600 3340 ; 6k� 37Q �, 35 0 39014080 51 9 0 4130 6 0 ; 4620' ;° 7660 14960 ® 6070 3700 6940 4140 7890 4450 8140 5050 7530 5140 8600 5740 9790 6160 7240 + 4420 8270 940. + 9410 5310 19890 (i 6030 9160 6140 � 10470�j 6860 ;111910 R 7370 8400 5140 9600 5740 10920 6160 11640 7000 • 10800 7140 12340 7980 14030 ^ 9570k� 1 Q9 0 �P 12440� �i 1339-0 +� R�12430 3j 14200rt-�°- ~-}- • 10740 12270 13960 15140 14060 :11900, T ' 13600� �5470 -�1� - - — l 15700. e��r — 5430 3990 4940 4460 5620 3980 5250 4030 6000 4500 6190 5900i7530 it 5280g 7340 t 8350 553�-�-�6._2600-- 0L 7820 5610 8940 .` 2920 ® 9630 6570 9740 7340 11080 7070 10390 7190 11870 8020 12250 • 11730 �; 7860 ,L12140 iI 810' ( 50 ( 14800m�~ I 5 90 13830_ 14540 • ____ �15520 15930 �+ ' �. A___ _ _ _ P v "M = Marriage Line, P , Perimeter/Side Wall (For piers supporting on e floor at marriage line, use''/z the above loads) 18 Manufacturer's Installation Manual - June 2015 4750 7070 4230 66 0 105r^ 46 T -6310 - 14000 - Juno 1 OF ALge�� PHILLIP J. 9 COp ND_ STEP 2. DESIGN FRAME SUPPORTS i (Homes Without Perimeter Blocking) DETERMINE LOCATIONS All homes require regularly spaced supports along all main frame I -beams. Select spac- ing between supports and sketch them on the support plan. Keep in mind that frame sup- ports under homes with 8" deep I -beams may be no more than eight feet apart. Those under homes with 10" or 12" deep I -beams may be no more than 10 feet apart. Generally, greater distances between supports will require larger footings. Figure 10 shows typical frame support locations. Side Wall (Perimeter Polnt-Load) Piers Required at Openings 4 R or Greater Door Piers 3me Nall (Paint -Load) Piers at Openings 4 it or Greater srs CALCULATE LOADS Use Table 6 to determine the loads on frame supports. Find the column with the appro- priate roof load and section width. Find the row corresponding to the selected support spacing. The number in the intersecting cell is the load. Loads on all frame supports can be assumed to be equal if support spacing is equal. However, if different support spacings are used then each support with a different spac- ing should be calculated separately. Note the location and load required of each support on the sketch. Fir r I &Irzz Spacing frame supports. There must be a support lo- cated near the end of each I-beam such that there is no more than 24 inches of beam past the edge of the support. Figure 10. Typical support locations for homes not requiring regularly spaced perimeter supports TABLE 6. LOAD ON FRAME SUPPORTS FOR HOMES NOT REQUIRING PERIMETER BLOCKING — lbs. 30 PSF Live Load M3900 .- 2490 .• 2820 3140 3600 2810 '- 3170 3520 4030 3120 ' 3520 3730 1; 4230 4 0 1 5400 4210 {; 4760 5270 6040 I. 4680 {f 5280 5840 4980 -� 5640 6270 7200 5610 6340 7030 8060 6240 7040 7790 6220 '; 7040 7 48 0 I 7010 7920 ;'; 8790 „ - 7800 ;; 8800 E; 9730� P of ALgeq PHILLIP J. 9 COR ND I AL - ER `f EER z} 2 303 5 A � a %,.r al En9110 June 1, 2015 • µq,,,,,•CtU0.eOeA T1i �Y- Manufacturer's Installation Manual - June 2015 19 STEP 3. DESIGN FRAME AND PERIMETER SUPPORTS (Homes With Perimeter Blocking) DETERMINE LOCATIONS Depending on design and loc tion, some homes require regularly spaced perimeter sup- ports along all of the sidewalls and marriage walls in addition to frame supports. This will be indicated on the data plate and/or documents included with the home. If required, perimeter suppork's are only needed on bearing walls. Bearing walls are those walls that support the ends of roof trusses or rafters (typically sidewalls and marriage walls but not end walls of main units or sidewalls of tag units). To minimize the number of required perimeter supports, space them evenly between point load supports as shown in Figure 11 and Figure 12 (but not under spans). These figures identify typical support locations for homes requiring perimeter supports. Blocking Piers Door Piers Marriage Line Blocking Piers I or I 1-Beam Frame (Z El E3 R R E4 OL Porch Post Piers I Perimeter Blocking Piers Door Piers Marriage One supports CALCULATE LOADS Use Table 7 to determ perimeter blocking. Fir the group of rows cord secting cells are the to tively. Loads on supports of equal if support spacir each support with a dii Note the location and II I -Beam Frame Marriage Wall (Point Load) Piers Required at openings 4 Ft. or Greater Piers or Opening Less Combined Span (A-B) — 46 in. in Width dqe Beam Continuous Ridqe Beam Column Post or Well, Less Than 16 In. In Width - Span A Sized for line support Szed for Sized for '-'One support Sized fc Span C Span B Span A+B Span A / the loads on frame and perimeter supports for homes requiring the column with the appropriate roof load and section width. Find bonding to the selected support spacing. The values in the inter- s for the frame, perimeter, and marriage line supports respec- given type (frame, perimeter, or marriage) can be assumed to be is equal. However, if different support spacings are used then Arent spacing should be calculated separately. required of each support on the sketch. i 1 / A Spacing frame supports. There must be a support located near the end of each I-beam such that there is no more than 24 inches of beam past the edge of the support. Figure 11. Typical support locations for homes requiring perimeter supports Figure 12. Typical marriage line support locations for homes requiring perimeter supports Champion recommends that homes with tape and texture wall finish have perimeter support. 20 Manufacturer's Installation Manual - June 2015 xeoee.urrvuur- TABLE 7. LOAD ON FRAME AND PERIMETER WITH MARRIAGE LINE SUPPORTS �,;,Of ALgeq PHILLIP J. 9 .co Nq {c N N'O' ER {i 4L 32035 41 0 'o a+afonal Em9 June 1, 2015 Manufacturer's Installation Manual - June 2015 21 STEP 4. SELECT FOOTING MATERIAL Select one of the products and materials from Table 8 for the footings. TA01 C Q 1=AAT1w1!_ 11AAT11=171A1 C Appropriate p' Minimum 6" thick poured -in -place concrete pads, slabs, or ribbons with at least a les 28-day compressive strength of 3,000 psi. Cast -in -place concrete footings may also Poured concrete All soil ty require reinforcing steel based on acceptable engineering practice, the design loads, and site specific soil conditions. li I -��runimum 4" thick nominal precast concrete pads meeting or exceeding ASTM C Pre -cast concrete All soil types '190-02a„ Standard Specification for Load Bearing Concrete Masonry Units, without II I reinforcement, with at least a 28-day compressive strength of 2,500 psi. Use in accordance with the pad manufacturer's instructions. Must be certified for ABS plastic Stable soils use in the soil classification at the site, listed and labeled for the required load ca- pacity. Proprietary systems gConsult system manufactureOj'Consuit system manufacturer. STEP 5. SIZE Once the load on the fol of each footing as folloti 1. From Table 9 ( inch) or double 2. Locate the groi in Prepare the FROST LINE pear. 3. Read across tY minimum footir stacked blocks 4. The required fc (Table 6 or Tal TABLE 9. PIER COP )TINGS and the soil -bearing capacity are known, calculate the size ermine if the pier is to be of single -stack blocks (8 inch x16 ack blocks (16 inch x 16 inch) pier. of rows in Table 10 with the soil -bearing capacity determined te, STEP 5. DETERMINE SOIL -BEARING CAPACITY AND 12). Use the next lowest value if the exact value does not ap- table to determine the minimum required footing area and the thickness for the corresponding footing type (single or double - size may be changed by selecting another support spacing URATION Less than Win (except corner ;;Single -stack blocks with long side piers more than 3 blocks high) "perpendicular to I-beam _ Between 36 in and 67 in and cor- Double, interlocked blocks ner piers over 3 blocks high 54 in or less Single -stack blocks with long side ;;parallel to perimeter rail (rim joist) 54 in or less Single -stack blocks with long side perpendicular to the marriage line 54 in and 80 inch IiDouble; interlocked blocks I 18,000 Ibs 16,000 Ibs. ;�8,000 Ibs. 8,000 Ibs. r N16,000 Ibs 8 V&10ZZj Frost protection. When se- lecting footing materials, bear in mind the need for frost protection. Not all footing materials are suita- ble for freezing climates... June 1, 2015 22 Manufacturer's Installation Manual - June 2015 m... CTu0. .1--luILY- TABLE 10. FOOTING DIMENSIONS .. . . blocks)D. . Equivalent . FootingSoil Minimum Minimum Cast -In -Place Maximu Cast -in -Place FootingBearing .. thickness Footing Capac_� min. thickness ...min. .. 256 16 x 16 18 6 1640 6 1640 384 -_- t _ 24 x 16 ! 23--1i --, 6 —j'— 2460 6 E 2460 576 24 x 24 28 8 3600 6 3700 1024 32 x 32 ; 36 12 (4 6040 �� 8---- I— 6400 -------�i- - — 1296 36 x 36 41 14 7420 10 7870 _ — 2304 48 x 48 �� 54 •, 20�i- 8000 11 16r i 11 2800 256 16 x 16 18 6 2530 6 2530 384 24 x 16 23 6 - 3800 6 3800 576 24 x 24 28 8 5600 6 5700 �� 1024 32 x 32 36 12 8000 8 9 550 1296 36 x 36 41 - - 10 12370 2304 48 x 48 . 54 �^ 16 IF16000 256 16 x 16 18 6 3420 6 3420 _ 384 Ji 24 x 16 �JL —23 -- -��^' 6 5130� ` - 6 `�i 5130 J 576 24 x 24 28 8 7600 6 7700 - — 1024 — �� — 32 x 32 ��---36 �L—-12----�C_8000 ��-` 8 -- 13510 1296 36 x 36 41 - - 10 16000 256 16 x 16 18 6 4310 6 4310 384 24 x 16 23 6 6460 6 6460, •• 576 24 x 24 28 8 8000 6 9700 1024 _32x 32 36 T� 8 16000 256 16 x 16 18 6 5200 6 5200 _ 384 't 24 x 16 �- 23 �� 6 ^�� 780-TO �I J 6 -J� 7800 �•� 576 24 x 24 28 8 8000 6 11700 1024 x 32 -�L 36 � - 1 J�8 16000-` — -��-32 256 16 x 16 18 6 6970 6 6970 384 24 x 16 236 8000 6 L 1� 0460 576 24 x 24 28 - - 6 15700� 1024 32 x 32 36 � 8 16000 ivote: i he capacity values fisted have been reduced by the dead load of the concrete footing. Design footings to comply with the following additional requirements: • Design each footing at least slightly larger than the base of the pier it supports. • To keep footings directly under I -beams and other support points, size them slightly larg- OF AL er�F- than the minimum required area to allow slight adjustment of the pier location during �9 �PPHILLIP home installation. J. c0P NQ • Design footings with a footing extension (projection beyond the base of the pier) no CF I A greater than the footing thickness (Figure 13). Increase footing thickness if necessary. 4 ry NO. 32035 A 0� �fes 1.w End, June 1, 2015 Manufacturer's Installation Manual - June 2015 23 4" 4° Footing Extends YES By Its Thickness Or Less 6" I 16" Block L I TYP� 24" N O Extends By More 16" 16" Than Its Thickness 24" Split Footing Extends YES Less Than One Third Its Width Z4-4' Split Footing Extends N O More Than One Third Its width NO 16° YES 4\ • The footing sizes shown are for square pads and are based on the surface area (square inches) Design non -square footings such that the area and depth is equal to or greater than the area and depth of the square footing shown in Ta- ble 10, and the distance from the edge of the pier to the edge of the footing is not more than thi thickness of the footing. • For four -inch thick unreinforced precast concrete footings, use the minimum footing size for the six-inch cast -in -place footing from Table 10. I STEP 6. INSTALL FOOTINGS Construct the footings as follows: • Maintain the distance between adjacent piers to within 10% of the tabulated spacing and Sol the average distance between any adjacent spans is equal to or less than the tabulated spacing. • Whenever possible, place point load supports directly under the required loca- tions. If plumbing, electrical, mechanical equipment interferes, place supports no more than 6 inches in either direction of the support point. • Recess perimeter blocking supports and perimeter point load supports no more than 10 inches from the edge of the floor with added support as shown in Figure 14. 1 Pressure treated 4 x 4 or 2 -'2 x 4's — Exterior Well I On,Edge (Nailed Together) Spanning Minimum 2 Floor Joists. Pier Floor Plate RIM 10" Max Setback From Edge of Floor Pier Typical Floor Joist Figure 13. Maximum footing extensions Placing Concrete anchors, If anchors will be placed in concrete, follow instruc- tions in Install Stabilizing System (p. 60) to deter- mine anchor layout. Either place anchors immediately after the concrete has been poured or drill them in after the concrete has set. Figure 14. Perimeter suppc I • 24 Manufacturer's Installation Manual - June 2015 MAN".ACT"....EA"T1."llY' • If footings are rectangular, orient them so that the longside is perpendicular to the home's I-beam. • Place the bottom of footings on undisturbed soil or fill compacted to at least 90% of its maximum relative density. • In freezing climates protect footings from the effects of frost heave in accord- ance with any LAW requirements (see Prepare the Site, p. 10). Place the bot- tom of the footings below the frost line (insulated foundations and monolithic slabs are other frost protection options not covered in this manual). • Make sure the top surface of the footing is level, flat, and smooth. • In accordance with the American Concrete Institute publication ACI-308, main- tain curing measures before construction or installation onto the concrete foot- ing begins, until a minimum of 70% of the specified 28-day compressive strength has been achieved. The ACI recommended time to attain this level of strength is seven days for ASTM C150 Type 1 mixtures and 10 days for Type II mixtures. Full design live and dead loads may not be applied until the 28-day duration has elapsed for achieving full strength. Excavation. If excavation is required, mark the footing locations on the ground with stakes before beginning to dig. Manufacturer's Installation Manual - June 2015 25 Construct Foundation (FOR HOMES WITH LOAD-, EARING PERIMETER WALL) This chapter provides guidelines and recommendations for the design and construction of a basement or crawlspace foundation using a load -bearing perimeter wall. A load -bearing perimeter wall foundation system uses a wall along the outer edge of the home to support the home's outside walls. This perimeter support works with interior supports such as piers, columns, and cross beams that support the home's frame and, if multi -section, marriage line. STEP 1. OBTAIN A FOUNDATION DESIGN (p. 26) STEP 2. EXCAVATE (p. 26) V" STEP 3. CONSTRUCT THE FOOTING OR SLAB (p. 26) STEP 4. CONSTRUCT THE PERIMETER WALL (p. 26) STEP 5. INSTALL INTERIOR SUPPORTS (p. 27) STEP 6. DAMP PROOF FOUNDATION'WALL (p. 27) STEP 7. BACKFILL AND GRADE (p. 27) STEP 1. OBTAIN A FOUNDATION DESIGN If a load -bearing perimeter wall foundation design has not been provided by the home manufacturer, it is the responsibility of the retailer and/or home owner to provide a de- sign approved by a professional engineer or registered architect. The approved design must comply with the LAHJ regulations for foundation design, waterproofing, and drainage, and the following: • The foundation perimeter bearing wall must be supported with a concrete slab or continuous strip footing around the perimeter of the home. Interior piers must be supported by a slab or footings. If footings are used under interior piers, they may be designed as in Install Footings, p. 15. • Slabs must extend to the edges of the home. • Footings andlslabs must be protected from the effects of frost heave by ex- tending the footings to or below the frost line or by using a frost protected shallow foundation design. STEP 2. EXCAVATE Excavate for the foundation, properly disposing of the earth that is not needed for backfill or site -grading purposes. STEP 3. CONSTRUCT THE FOOTINGS OR SLAB Construct the foundation according to the approved design, including the perimeter foundation wall, drainage system, footing(s), and/or slab. STEP 4. CONSTRUCT THE PERIMETER WALL Unless the approved design requires otherwise, construct the perimeter wall with mor- tared and reinforced concrete blocks or reinforced poured -in -place concrete. Install re- inforcement according to the approved design or LAHJ. Install ventilation and access openings accordinglto the approved design, or if not specified, according to the re- quirements in Complete Exterior Work, STEP 3 INSTALL SKIRTING (p. 90). V1r1/!VZZA Using engineered designs. This section is NOT intend- ed'to provide a complete design for a buildable foun- dation. A complete design must be obtained that is suitable for the local area and sealed by a professional engineer or registered archi- tect. Foundation ready home. Make sure that homes to be installed on a basement or a crawlspace have been or- dered with a recessed frame or as foundation -ready, where the frame is designed to avoid interference with the foundation wall. Checking the water table. Fc basements, check for a high water table. The water table may vary seasonally or bass on weather conditions. A ge- ologist can perform an algae test to determine the water table level. The foundation design must account for a high water table. I • 26 Manufacturer's Installation Manual - June 2015 1 MAN-c..... ._1 i UIIY When constructing pockets for an H-beam system, measure the beam depth and locate the pockets carefully. It is critical that when the home's frame rests on top of the H-beam, the perimeter of the floor rests squarely on the extended foundation wall. Leave room for a spacer on top of the wall pockets (to prevent corrosion, the steel beams must not be in direct contact with concrete). Leave at least one inch for thermal expansion at the ends of the beams and maintain a minimum of two inches of bearing area for the beams in the pockets (yielding a minimum pocket depth of three inches). Bolt a pressure treated wood sill plate (minimum 2 x 6) to the top of the foundation wall. Connect the home to the foundation according to the approved design. Re- cess nuts into the sill plate and cut off the ends of bolts so they do not project above the sill plate and interfere with the placement of the home. STEP 5. INSTALL INTERIOR SUPPORTS Install piers, columns and H-beams to support the interior of the home according to the approved design. STEP 6. DAMP PROOF FOUNDATION WALL Damp proof the foundation wall no less than up to the height of the planned backfill. STEP 7. BACKFILL AND GRADE Backfill against the foundation wall to the height of the damp proofing. Take care to not damage the drainage system. Grade the fill as per Prepare the Site (p. 10). Levei ine wau. iviaKe sure the foundation is level and straight with no more than a 1/4 inch vertical variation over the entire foundation and no more than 1/8 inch vertical variation over any two -foot length. Check for Plates. When us- ing an H-beam system, check and compensate for reinforcement plates that add thickness to the chas- sis beam at axle locations. Figure 15. Omitted Figure 16. Omitted Limits of exca- vation. When a crane will be used, excavate no more than two feet outside the foundation perimeter. Un- excavated ground will pro- vide a more stable base for the crane. Footing heights. Pour foot- ings to a height that will re- duce the need to cut blocks or shim when building peri- meter walls and piers. i ' // Backfilling. Backfill against basement walls only after the home is connected to the foundation or the basement walls may deflect inward or collapse. Manufacturer's Installation Manual - June 2015 27 Set the H This chapter describes the tion) onto the foundation. of installing the first section of the home (for single section homes this is the only sec - STEP 1. PREPARE FOR SET Before beginning the home set, complete the following: • Confirm that the site is properly cleared and graded (see Prepare thI Site, p. 10.) • Ensure that the footings are in place and properly located. • Install any utilities that will be difficult to install (e.g. those below grade beneath the home) after the home is in place. • Secure or remove from the home and properly store all ship loose items (refer to shipping documents for items shipped with the home). • Inspect the home interior, exterior and all provided materials, appliances, and equipment. Immediately report any damage or shortages to the manufacturer. • The ground moisture retarder may be installed now or after the home is com- plete. See Complete Exterior Work, STEP 2. INSTALL GROUND MOISTURE RETARDER (p. 89) for requirement and then return here. For perimeter bearing wl II foundations: • Check that they length and width of the home match with the foundation walls. • Check that the two main diagonal measurements of the foundation are equal. • Check that the foundation walls and other support points are within 1/4 inch of level overall and within 1/8 inch of level within any four foot distance. • For multi -section homes, check that each pair of diagonal measurements for each portion of the foundation corresponding to a home section are equal. • For multi -section homes, find the electrical bonding lugs on the front or rear outriggers. Reverse them to the inside of the outrigger using star washers so they will be accessible after the home is placed on the foundation walls. • If using an Hbeam system, remove the frame's shackle hanger if it will inter- fere with proper placement of the beam. STEP 2. POSITION HOME SECTION Position the home section in its final location (if possible, move the heaviest section of the home into place frst). Then place materials needed to construct support piers near their final locations under the home as determined in Install Footings, (p. 15). STEP 3. LIFE HOME There are three primary methods available to place the home on the foundation: jacking, rolling and craning. Jacks, often with roller systems, are typically used .for pier and anchor foundations; roller systems are commonly used for crawlspace foundations with load - bearing perimeter walls; and cranes are most commonly used for basement foundations. i ' /, Clearances under the home. After the home is leveled, the resulting dis- tance between the bottom of the entire chassis main frame beam and the ground must be no less than 12 inches. Utilize proper cribbing. Manufactured homes weigh several tons. No one should be under the home (whether it is mov- ing or stationary) unless proper cribbing is in place (Figure 17). Failure to uti- lize proper cribbing may result in serious injury or death. Leveling during jacking. Keep the home's floor as level as possible during jacking. Twisting or warping the floor can dam- age the structure and finish- ing. Use as many jacks as necessary to keep the floor flat and level. 28 Manufacturer's Installation Manual - June 2015 CHAMPION JACKS If jacks are to be used, comply with all jacking safety precautions and the procedure below. Lifting the home with jacks involves potential risks and must be done with ut- most care and caution. Failure to follow jacking warnings and procedures may result in serious injury or death. Please read the Jacking Safety Precautions before lifting the home with jacks. • No one should be under the home while the jacks are being operated or while the home is supported only on the jacks. • Use jacks only for raising the home. Do not rely on the jacks to support the home. • If possible, raise the home only on one side so that the other side is in contact with the ground. Leave the hitch connected to the vehicle or other stabilizing equipment. • Obey all OSHA regulations. • Make sure adequate safety cribbing (Figure 17) is in place whenever the home is placed on jacks. • Use a minimum of two commercial quality jacks, each with a rating of at least 12 tons. • Jack only on the main chassis I-beam, centering jacks directly under the beam. • Do not jack on a seam (joint between flanges of twin I -beams). • To distribute the concentrated loads from jacks to I-beam, place a minimum 3/8-inch thick steel plate, a C-channel, a 1%Z-inch thick hardwood block or a commercial jacking plate, between the main chassis I-beam and the jack head. • Locate the jack base on firm ground. Never jack on freshly disturbed soil or where an underground sewer pipe may be located. • Use a firm support under the jack base to prevent tipping or settling of the jack. A minimum 16" x 16" or larger wood or rigid fiberglass pad is recommended. Never use concrete blocks as a support for a jack. Follow the jacking sequence outlined below to avoid overstressing structural members: 1. Block wheels. Block the wheels so the house does not roll. 2. Install cribbing. Install safety cribbing (Figure 17). Figure 17. Stack 4"x 6" by 5' long timbers as shown to form safety timbers. Place safety timbers under home behind axle area and under hitch. - - - - - - - - 3. Level lengthwise. Locate one jack at the hitch and level the section length- wise (such that the front and rear of the section are at the same height). 4. Locate frame jacks. Place a minimum of one jack just forward of the first spring hanger and another just behind the last spring hanger of the I-beam on the side of the home that is lowest (making sure not to place jacks where the piers will go). Place jacks no more than 20 feet apart and no more than 20 feet from each end of the I-beam. 5. Lift the home. Operating the jacks simultaneously (or sequentially in very small increments), lift the home section until it is slightly higher than the final desired pier height. • M.NU-1-11e.[AUTIFULLV' Manufacturer's Installation Manual - June 2015 29 ROLLER SYSTEMS When using a roller system, the following sequence: 1. Establish staging both sides of the fc 2. Setup rollers. Set turer's directions. 3. Fasten bump bloc plates at the ends sired location. 4. Roll home. Roll th 5. Remove bump bli of a multi -section h CRANES When using a crane, folic • Position the hot ation) such that • Use enough prc prevent damage Imply with the equipment manufacturer's directions and rea. Establish a staging area directly adjacent to one or ndation. p the roller system according to the equipment manufac- s. Temporarily fasten wooden bump blocks on the sill the foundation to stop the home from rolling at the de - home into place over the foundation. Remove the blocks before installing the next section these guidelines: section(s) and crane (taking the boom reach into consider- ey do not have to be repositioned during the set. My sized straps to maintain balance of the home and to the structure. • Place straps under walls or posts, including temporary posts used to support the opening. Dol not position lifting straps under marriage wall openings. • Use a properly sized spreader bar to maintain a vertical lift, to avoid placing compression forces on the eaves and to reduce any tendency to slip. • Connect a ropelto at least one point on the home so it can be controlled while aloft. • Make provisio 's to retrieve the straps/cables after the home is set. If using a cradle system,inotch the sill plate where the straps will fall. For a sling sys- tem, notch and reinforce the home's rim joist to keep the strap from slipping and allow the strap to be removed after the home is set. . • Always set the home section farthest from the crane first so that subsequent section(s) need not be lifted over previously set sections. STEP 4. CC For the side of the I lowing the home m the support plan de section and work tc procedure describe Construct piers so in the specification: measured from the construction reauirc NSTRUCT. PIERS ome section that is up on jacks, place piers on footings or pads fol- n, ufacturer's blocking plan (or tags). If no plan was provided, use eloped in Install Footings (p. 15). Start at one end of the home yard the other noting the required pier material specifications and below. s to provide a stable foundation for the home using materials listed box below and based on the location of the pier and its height as op of the footing or pad to the top of the cap. See Table 12 for pier V&OZZ No one should be under the home while it is suspended. Never put your hands betwec the house and the perimeter walls and support beams i ' // Designing piers. Incorrect size, location or spacing of piers may result in serious structural damage to the home. Install piers at all re- quired locations. Failure to c so may lead to sagging floors, walls, and roofs, and could void the home's war- ranty. 30 Manufacturer's Installation Manual - June 2015 CHAMPION' TABLE 11. PIER MATERIAL MINIMUM SPECIFICATIONS TABLE 12. PIER CONSTRUCTION Less than 36 in (except corner piers more than 3 'Single -stack blocks with long„ , /2 8,000 lbs. Not required blocks high) .�—_---------- side perpendicular to I-beam . --------- ---------------- Between 36 in and 67 in 1" ('/2" up to 36" and corner piers over 3 Double, interlocked blocks high) 16,000 lbs. Not required blocks high Over 67 in — `— �— _ Designed by a registered engineer or registered architect — Single -stack blocks with long ,/z' up to 36" high, 54 in or less side parallel to perimeter rail 1" over 36" high 8,000 lbs. Not required ';side (rim joist) 54 in less .. Iperpendblular ,/2'up to 36" high, — ;Not or to theocks 1",over 36" high 8,000 8 000 lbs. required marriage line Between 54 in and 80 in* Double, interlocked blocks 1" 16,000 lbs Not required * Construct perimeter and marriage line piers over 80 inches according to the requirements for frame piers of the same height. 1. Prepare footing surface. Make sure the footing surface upon which the pier sits is flat and smooth. Before placing the pier on the footing, clean dirt, rocks, or other material off the surface of the footing. For cast -in -place concrete foot- ings, if the footing surface is uneven, create a level, flat surface by placing a treated board on the footing and mortaring on the first block (or manufactured pier base), or by placing the first block (or manufactured pier base) on a layer of premix dry sand mortar. 2. Stack blocks. Stack concrete blocks with their hollow cells aligned vertically. When piers are constructed of blocks stacked side -by -side, orient each layer at right angles to the previous one (Figure 18) and plan blocks so that split caps will be perpendicular to the blocks they rest on and to the I-beam. PHILLIP J. ' C�0 ND B7 8FI E JR N EER � NO. {> 32035 A arBsslonal En9��0o June 1, 2015 MANUFACTURED BEAUTIFULLY- Manufacturer's Installation Manual - June 2015 31 M[In W%W Wood Shim b FBI. Cage Up b 1• Mmd opmr�d a® eWIecameb Cgpw2WG PT. or 11T ded TYpICW Bede cwmft wadi Awn Hmm. Wood GhI mbFi Gaps Up to v MIX R7�W. (1) 2A2 epBw ateconMftGRP rjpwe.we ca mmto Block 3. Cap piers. Place a cap on hollow block piers to evenly distribute the structural load. Use caps the same length and width as the piers they rest upon. When using split caps on double -stacked block piers, install the caps with the long dimension perpendicular to the joint in the blocks below and to the main (- beam. 4. Install shims. Use shims to level the home and fill any gaps between the base of the I-beam and the top of the pier cap. Always use shims in pairs (Figure 19). Drive them in tightly so they do not occupy more than one inch of vertical space. When the space to be shimmed is greater than one inch and less than the minimum thickness of available caps or concrete blocks, use hardwood, southern pine or Douglas fir larch dimensional lumber 2x spacer (two layers maximum) or 2" or 4" thick concrete block. For split caps, install shims and dimensional lumber/blocks over each individual cap. 5. Set up level. Set up a water level with the fluid level at the desired height of the main Biers. Carefully lower the side of the section down onto the leveled piers, adj�sting the final height with shims. Figure 18. Frame pier construction i ' /, Curing time of mortar. Where wet mortar is used to construct or level piers, al- low it to cure to at least 80% of strength capacity (usually requiring 96 hours) before setting the home. Figure 19. Correct shim placement Dimensions of masonry perimeter wails. If using a masonry perimete enclosure, calculate pier heights so that the enclo- sure can be built using standard unit dimensions (without cutting). I • 32 Manufacturer's Installation Manual - June 2015 MANUTACTU[CD ICAUTIIUIIY• A water level is a standard device for leveling the home. The level consists of the following components: • One container (five gallon bucket or one gallon jug). • 150 feet of 1/2 inch diameter plastic tubing. • Fittings for container to tubing. • Valve for terminal end of tubing. • Liquid for system: colored water in warm climates, windshield washing fluid in cold climates. Cantina, am to use a water level cm.e !a. Position level. Position the level such that it can reach all piers. b. Place container. Place the container so that the fluid in the con- tainer is at the same level as the desired level of the top of the supports under the home, allowing for any bracing below the lev- el of the I -beams. c. Uncoil tubing. Uncoil the tubing and fill with fluid, taking care not; to introduce bubbles into the hose. Never allow anything to crimp or crush the tubing so as to impede the free flow of fluid. d. Bleed air. Hold the valve below the level of the water container; open the valve to bleed out any air and close the valve. e. Establish height. Locate the tubing adjacent to a pier that is set to the desired final height. Position the valve above the pier and open the valve. Move the water container up or down to where the water level is at the desired final height of the pier. Maintain the water container in that position and close the valve. f. Level piers. Move the tubing to the next pier. Hold the valve above the pier and open it. Set the pier height to the level of the water in the tubing and close the valve. Repeat this step until all 6. Complete the opposite side. Jack the other side of the section up and install piers following the instructions above. At the completion of this step, the sec- tion should be level from front to rear and from side to side. 7. Install perimeter and marriage line piers. Install perimeter piers and for multi -section homes, marriage line piers. Position marriage line piers to pro- vide equal bearing for both mating sections. 8. Remove running gear. Remove and store, recycle or properly dispose of the hitch, axles, and wheels. These items are the property of the homeowner un- less other contractual arrangements have been made. i , // Level the home. The home is adequately leveled if there is no more than 1/4 inch differ- ence between adjacent pier supports (frame or perime- ter) and the exterior doors and windows of the home do not bind and can be properly operated. Water level operation. To operate the water level properly, both ends of the system must be open to the atmosphere and there must be approximately the same amount of fluid in the tubing at all times (within a few inches). • M�Nur�eruuo ..�urnuur• Manufacturer's Installation Manual - June 2015 33 Complete (Multi -Section Set This chapter covers the preparation and installation of additional home sections, including the structural connections be- tween units, raising and fastening hinged roofs, and fastening the home to a load -bearing perimeter wall foundation. Follow the Steps•- • STEP 1. MARRIAGE LINE ANCHORS (p. 34) STEP 2. REMOVE PROTECTIVE SHIPPING MATERIALS (p. 34) STEP 3. COMPLETE HINGED ROOF (p. 34) STEP 4. REPAIR OR INSTALL MARRIAGE LINE GASKET (p. 36) STEP 5. POSITION ADDITIONAL HOME SECTIONS (p.37) STEP 6. CONNECT FLOORS (p. 37) STEP 7. CONNECT ROOF (p. 39) STEP 8. CONNECT WALLS (p. 40) STEP 9. ATTACH TAG UNITS OR (AC) GARAGE (p. 42) STEP 10. REMOVE TEMPORARY ITEMS (p. 43) STEP 11. FASTEN HOME TO FOUNDATION (p. 43) STEP 12. BACKFILL AND GRADE (p. 43) STEP 13. BUILD STAIRS (p. 43) STEP 1. MARRIAGE LINE ANCHORS Ground anchors along the marriage line are not required (unless called out in installation addendum). STEP 2. REMOVE PROTECTIVE SHIPPING MATERIALS Remove all shipping protection and associated fasteners from both home sections to be joined, including plastic used to close up the open sides during transportation. Do not re- move the temporary s,6pports holding up the ceilings at major openings. STEP 3. CI If the home has a hi crane or roof jacks f 1. Position I the jack m along the I the first or ing overha 2. Remove f tion of thel 3. Lift roof. ` may be re, damage tF shingles 7MPLETE HINGED ROOF nged roof that has been folded down for shipping, raise the roof using a D,Ilowing the procedure below: ift points. Position the roof lift points Qacks or crane lift points) following anufacturer or crane operator instructions. Space roof lift points equally �ngth of the roof with no more than five feet from the end of the roof to last lift points. Use three lift points for a roof up to 48 feet long (exclud- ngs), four lift points for up to 60 feet, and five lift points for up to 72 feet. asteners. Remove any temporary fasteners connecting the hinged por- roof to the vertical king posts. Raise the roof to its intended height. A temporary slight overextension auired during lifting. However, take care not to overextend the roof and e hinge. Raise the roof evenly in small increments, keeping it level i the entire process to prevent racking. Do not allow roofing paper and i get caught in the hinge crease. ' // Position roof jacks. Posi- tion jacks vertically to pre- vent the jack foot from kick- ing out or sliding. Caution during roof rais- ing. Do not enter the roof cavity during the raising procedure. Checklists for alternate construction. If the serial number (see the data plate or the chassis front cross member) has the letters "AC" in the serial number, then the Alternate Con- struction on -site check list supplied with the home must be completed and re- turned to the home manu- facturer in a timely manner. If the AC checklist relates to the roof, then failure to do so may require future • 34 I Manufacturer's Installation Manual - June 2015 MANUlACTURlD BlAUTIIUILY` 4. Secure king posts. Position the hinged king posts (may be a knee wall) atop the fixed king posts or against the wooden stop (Figu're 20). The king posts are either hinged to the underside of the hinged -truss top'phord or shipped loose as a knee wall stored in the roof cavity. Position them as needed to level the roof, aligning each king post with the king post directly beneath it, and securing it in place per hinged roof truss installation addendum. 5. Install Bracing. Install diagonal bracing at both ends of each home section from the top of the gable end truss approximately 45 degrees downward. Keep trusses plumb and secure the brace with two (2) 7/16" x 2-1/2" x 15 ga minimum staples per truss (Figure 22). 6. Unfold double hinge. If the roof has a double hinge top chord, unfold the second hinge and secure per double hinged top chord roof truss installation addendum. (Figure 23). 7. Fasten sheathing. Fasten sheathing from the upper portion of the roof to the lower fixed portion of the roof just below hinges with two (2) ,15ga staples or 8d nails at each truss (Figure 24) or, if wood blocking is present, at six inches o.c. along blocking. Hinge Roof *Hn,,e �— King Post Redistribute Insulation. Before closing up the attic space check that the insu- lation has not shifted. Re -level the insulation if needed. Install gable walls. Assembled frames or wall studs and sheathing needed for the site assembly of the gable end walls and interior shear wall knee walls (if present) may be provided. Install the gable end walls for each home section as follows (Figure 25): • Frames: fasten frames to truss top chord and web, or, • Studs: Install studs 16 inches o.c., and; • Sheathing: Install sheathing. disassembly of the roof and further inspections. Figure 20. (Left) Hinged roof truss (drawing is typical, actual truss configuration may vary) Figure 21. (Right) Hinged king post to fixed king post (drawing is typical, actual truss configuration may vary) Figure 22.Typical Diagonal bracing. Also, see hinged roof truss installation addendum. Figure 23. (Left) Double hinged top chord (AC Letter required) Figure 24. (Right) Sheathing at hinge line „A„�,ACTeaEp BEAUT1,�„r_ Manufacturer's Installation Manual - June 2015 35 King Post Wedge Truss Top Chord -H inge 10. Install vents. Extend plumbing vents, exhaust fans, appliance vents, and fire- place stacks through the hinged portion of the roof in strict accordance with this manual (Prepare Appliances and Equipment, p. 79) and/or supple- mental instructions provided by the home manufacturer. Assembly Hinged King Post STEP 4. REPAIR OR INSTALL MARRIAGE LINE GASKET A continuous, non-porou� gasket creating a permanent air barrier must be installed on at least one side of the marriage line; along the floor, end walls and ceiling (and mar- riage lines for any tag units). The manufacturer has provided a marriage line gasket ei- ther installed on the horse or shipped loose. If installed, inspect the gasket and repair any gaps or tears. If not installed at the factory, install a continuous gasket between the home sections along the floor, end walls, and ceiling (Figure 28). For homes with throug�-the-rim crossover ducts (see Crossover Connections, p. 49) inspect and if necessa_�, repair gaskets around the rim joist duct openings using 3/4- inch thick fiberglass duFt board or other material acceptable to the manufacturer. En- sure that duct openings are unobstructed (Figure 27). Figure 25. End wall comple- tion. See hinged roof truss installation addendum. ' // Inspecting vents. Fuel fired heating appliance and fire- place vents that pass through a hinged roof must be completed and inspect- ed at the site prior to ener- gizing the appliance or oc- cupying the home. Failure to comply with this precau- tion may result in serious injury or death. Venting systems must be installed in conformance with the appliance manufacturer's instructions and any in- structions supplied with the home. (AC letter required) Figure 26. Ridge cap assembly. (AC Letter Required) 0 F Z Checking through -the -rim - ducts. Ensure that through - the -rim -duct connections are secure and tight after the home sections are to- gether. Figure 27. In -floor duct showing crossover through rim joist I W41111FAMA2011001010 36 Manufacturer's Installation Manual - June 2015 1MANUMCTULLD ILAUTIlUIIY• A CONTINUOUS, NON —POROUS GASKET INSTALL 3/4- DUCT BOARD GASKET AROUND ALL NTH A MINIMUM THICKNESS OF 1 1/4- AND INTERNAL CROSSOVER DUCTS., INSTALL PER MANUFACTURER'S INSTALLATION DO NOT PLACE GASKET IN A POSITION WHERE IT INSTRUCTIONS ON ONE SIDE OF THE WILL RESTRICT AIR FLOW AT INTERNAL CROSSOVER MARRIAGE UNE(S). DUCTS. GASKET MAY HAVE BEEN INSTALLED AT THE STEP 5. POSITION ADDITIONAL HOME SECTIONS Follow this procedure to install additional home sections: 1. Remove obstructions. Remove protruding nails and staples or anything else that will keep the home sections from fitting together snugly. If present, cut the temporary ceiling and floor plates at the edges of marriage line openings tak- ing care not to damage ceiling or floor coverings or displace temporary mar- riage line support posts (these supports and the plates will be removed after the home sections have been structurally connected). 2. Complete crossovers. Before moving the two sections together, complete any crossover connections that require access from the open marriage line, including the attic duct connection (if present) and marriage wall interior elec- trical connections (see Connect Crossovers, p.49). 3. Position section. Position the section as closely as possible (ideally within six inches) and line up with the previously set section. If using a mechanical positioning system or crane, follow the system manufacturer's instructions or the crane operator's directions. 4. Construct piers. With the outside walls of the home aligned, construct the piers for the home section according to the instructions in Set the Home (p. 28) before continuing to the steps below. 5. Level section. Lower the section onto the outside piers first, inside piers last. Before releasing the mechanical positioning system, check interior doorways and other openings for misalignments that may cause problems during trim - out. The floors should be flush, level, and tight and the roof section should have little, if any, gap at the top of the marriage line. Use at least two come -a - longs to pull the sections snugly together and use the water level or other lev- eling device to set all piers and shims. 6. Shim gaps. Shim any gaps up to one inch between structural elements with dimensional lumber. If any gaps exceed one inch, re -position the home to eliminate such gaps. STEP 6. CONNECT FLOORS Make floor structural connections according to the method described below. Install toed fasteners through bottom board Install fasteners at approximately a 45 degree angle (+/- 5 degrees) from horizontal as shown in (Figure 29) using the fastener type, size, and spacing indicated on Table 13. TABLE 13. FLOOR CONNECTION FASTENING SPECIFICATIONS * Increase fastener lengths by 3 inches for double rim joists. Figure 28. Marriage Line Gasket Mechanical posi- tioning system. For a pier - set home, a mechanical positioning system (such as a roller system) will make the process easier and saf- er and be less likely to damage the home. A Sealing gaps. Prior to com- pletion of the exterior close- up, gaps that do not exceed one inch are permitted be- tween structural elements provided that the gaps are closed before completion of close-up, the home sec- tions are in contact with each other, and the mar- riage gasket provides a proper seal. (PHILLIP Jg.. r -C�10R I kt N NEER i} 32035 m� �raSslonal En9�K0 June 1, 2015 MANUPACTURID IAU•ULLY' Manufacturer's Installation Manual - June 2015 37 Marriage Line oor Decking Rim Joist Fastener Stagger fasteners on eitheriside of marriage line and offset them by half the spacing distance (Figure 30). Fastener Locaton Marriage Line Half Spacing Spacing From K Table Spacing K From Spacing Table From K Table Spacing aff K From Table K -- Install additional fasteners as indicated below, making sure to repair any openings in the bottom board with tape specially made for that purpose (may be provided). • Install two additional fasteners at each end of the home at approximately a 45 degree angle (+/- 5 degrees) from horizontal. • If the home has a through -the -rim crossover duct, install one additional fas- tener at eachlside of the duct opening. • Optional - In YVind Zones II and III, fasten additional metal straps of minimum 26 gauge, 1-1/2" wide galvanized steel spaced per Table 14 and fastened per Table 15 to the underside of the floor joists (Figure 31). Select a strap length sufficient to he the required fasteners. TABLE 14 MAXIM 6 M STRAP SPACING Up to 4-in-12 96 in. 80 in. Over 4-in-12 y 48 in. T"�; 48 in. TABLE 15. STRAP FASTENING MINIMUM SPECIFICATIONS Galvanized staples 6ga 7/16" x 1" penetration 12 each side Roofing nails Ij 1-1/2° long 9 each side 38 Manufacturer's Installation Manual - June 2015 Figure 29. Floor connection through bottom board (Fas- teners must penetrate the rim joist by a minimum of 1 inches) Figure 30. Staggered offset fastening along marriage line Patch bottom board. Use adhesive spray, mastic, and/or diver- gent staples in combination with bottom board tape for a more secure and durable connection. POF ALgBq� PHILLIP J. 9 C0P ND 0' J�At `ENGINEER i} N 0. js 32035 a oK ofossional June 1, 2015 MANUFACTUREDBEA711.1 - Floor I I Joist I See Chad I rFor Spacing_ i Metal StrapI I I I I Marriage Line Manage Line STEP 7. CONNECT ROOF If the marriage line along the roof is not snug, position jacks every 20 feet or less along the outside I-beam and uniformly lift the section until the roof area is tight. Check to make sure the ceiling joint is flush before installing the connections. If not, use a jack and tee to raise whichever ceiling is low, starting at the front and working to the rear of the home. Fasten the roof along the marriage line for either double or triple - section homes. DOUBLE -SECTION HOMES Make roof structural connections in double -section homes as described below. Install toed fasteners through roof sheathing Install the fasteners through the roof deck into the ridge beams or roof rails at an ap- proximately 45 degree angle (+/- 5 degrees) from horizontal (Figure 32) according to the fastener spacing and specifications in Table 16. Stagger fasteners on each side of marriage line and offset them by half the spacing distance (Figure 30). Spacing indi- cated is on -center, both sides of ridge. Make sure fasteners penetrate the ridge beam/rail by a minimum of 1-1/2 inches both sides of ridge. Fasteners Roof Approx. Sheathing 45:r �� i Ridge Beam ` TABLE 16. ROOF CONNECTIONS SPECIFICATIONS Optional - In Wind Zones II and III install additional metal cap or straps as follows: Caps • Select metal caps made of minimum 8" x 30 ga galvanized steel or 0.019" aluminum. • Install caps continuously, overlapping by minimum of four inches at splices. • Fasten caps with 1" x 1" x 16 ga galvanized staples or 12 ga 1-114" long x 3/8" diameter head roof nails or #8 x 1-1/4" sheet metal screws at two inches o.c. both sides of ridge. Figure 31. Metal strapping for Wind Zones 11 and /// Closing the roof gap. Level and fasten the marriage line joint at the floor before jacking to tighten a roof gap. DO NOT use roof fas- teners to close any gaps. Separation of the ridge beams and trusses may occur. Figure 32. Toed fasteners through roof sheathing PHILLIP J. 'ENGINttK ji N0. 4 A 3N a� °ssionol En9`�� June 1, 2015 Installing lags. If lags are used to connect roofs, use appropriately sized wash- ers, countersink the fasten- er heads and fill the coun- tersink holes with putty or caulk to prevent shingles ",,,,e ",,,"„y_ Manufacturer's Installation Manual - June 2015 39 Straps from sinking into the holes Ide • Select metal straps of minimum 1-1/2" wide x 26 ga galvanized steel or over time. 0.019" aluminum. When to use optional metal straps. If a ridge vent will • Space straps a maximum of 96 inches o.c. for Wind Zone II and a maximum be installed, use straps in- 80 inches o.c. for Wind Zone III. stead of a continuous cap. TRIPLE -SECTION HOMES VIND ZONE I ONLY) For triple -section homes where roof lines run parallel to each other on adjacent units (Figure 34), follow the instructions below to complete the connections at the roof. Wind Zone II and III Triple Install fasteners through pre -installed sheathing Section Homes. See In - For homes where sheathing Iis in place on both sides of the marriage line (Figure 33) stallation Addendum in - install fasteners from the loud side of the roof on an angle so as to penetrate roof beams cluded with manual. on both sides of marriage line, using the fastener specifications and spacings indicated on Table 17. I oe,rc�rsaaw, ouws�wl Faawylmm�a I �. shims FleW I` &VV" Figure 33. Triple -section roof FeeOory:lils�9ed stet connection (Wind Zone 1 On- ly) I _ 12 _—� 43 MAX i F. rw I Marriage — — — — — — — — — — LineFigure 34. Triple -section home __Ridge Line — — — — — — — — — — I Marriage Lhe i I IPlan Elav tlon TABLE 17. ROOF CONNECTION SPECIFICATIONS Fastener I Spacing Type Size —Wind Zone I . Zone 11 Wind Zone III Lag screw 5/16" x 6" 14in. - Wood screw 1#10 x 5" ,j 9in. j - STEP 8. CONNECT WALLS pF AL Once the home is secured along the marriage line floor and roof, secure end walls, in- �F, 'a6q terior doorways, and marriage line partitions according to the appropriate method de- P PHILLIP J. �y scribed below. -CO NQ END WALLS NGTN IEEIR s} Install toed fasteners through sheathing 32N0o3'5 Toe fasteners through sheathing from the exterior at an approximately 45 degree angle °'°ss,,n,, (+/- 5 degrees) (Figure 35) according to the fastener specifications and spacing re- quirements in Table 18. See (Figure 30) for staggered fastener pattern. June 1, 2015 40 1 Manufacturer's Installation Manual - June 2015 MA.WAITMI IIAU•U{lY` Gasket Wall Studs Exterior or E) Underia, TABLE 18. END WALL FASTENER SPECIFICATIONS Fastener type Size Spaci Wood screw #8 x 3" 32in. o.c. Nail ! 0.131 x 3%" !f 32in. o.c. MARRIAGE WALL COLUMNS Check inside the home along the mate line for a label that identifies any support col- umn(s) requiring special attachment. If found, make connections inside the home to fasten support columns to the structure of the other section (Figure 36). By installing fasteners according to the specifications and spacing requirements in Table 19. Toe screw or through -screw to maintain 11/2 inch screw penetration. #8 X 4" SCREWS OR EQUIVALENT / FASTENERS AT 16" O.C. — TYPICAL r WALL WALL TABLE 19. MARRIAGE WALL CONNECTION SPECIFICATIONS' Wood screw #8 x 4" 16 in. o.c. Figure 35. End wall connec- tion toed through sheathing Figure 36. Marriage line col- umn connections VPHILLIPJ.-t'NO. 4L June 1, 2015 M ,. .T„M«.' Manufacturer's Installation Manual - June 2015 41 STEP 9. ATTACH TA (WIND ZONE I ONLY After the main unit has been following procedure: 1. Position and block possible at its intend ing and install piers HOME SECTION (p designed to line up accordingly. 2. Level the unit. Usln elevation of all point than 3/8 inches from inches overall. UNITS / AC GARAGES on its foundation, install all tag units according to the he tag. Position the tag unit as close to the main unit as :d location. Use a hitch jack to obtain approximate level- pports according to Set the Home, STEP 2. POSITION 28). Determine whether the tag and main unit floors are ish or are offset by a step and adjust the tag pier heights g a water level (p.33), verify that the piers are level. The along the lower flange of the I-beam should be no more the desired height and should not deviate more than 3/4 3. Connect floors. Ifithe floor of the tag unit is level with main unit floor, connect the floors together ;as described in STEP 6. CONNECT FLOORS (p. 37). If the floors are offset, use the connection detail shown in Figure 37, fastening the continuous 1 X" x 1 '/2' x 1/8" angle iron to the tag unit with minimum 5/16" x 3" lag screws or ;8 x 3" wood screws. Match fastener spacing and quantity to that used for the connection of the angle iron to the main unit. 4. Connect walls. Secure the tag unit walls to the main unit sidewall using #8 x 4" toe screws at 1112 inches o.c. (see Figure 38). Once the wall connections are complete, finish the siding installation. Tag Unit Floor Unit Floor Angle Iron 5. Connect roofs. Connect the tag unit roof to the main unit roof using #10 x 5" screws, toe screwed at each main unit vertical structural member (stud or truss) location. See Figure 39 for flush roof connections and Figure 40 for roof connections with an offset greater than two inches. Roof connections with an offset lessithan two inches do not require screws. Und.n„mnr Ty" i it n M huK V&Irzlz Piers under tag units. Some tag units have spe- cial piering needs due to the roof and/or floor con- struction. These are de- tailed in Figure 8. Note that tag unit end walls are typi- cally load bearing rather than side walls. V&Irzzj Wind Zone II or III Tag Units. See installation ad- dendum included with manual. Figure 37. (Left) Tag unit offset floor connection Figure 38. (Right) Tag unit wall connection Figure 39. (Left) Tag unit flush roof connection Figure 40. (Right) Tag unit offset roof connection I A • 42 Manufacturer's Installation Manual - June 2015 MANUEACTU0.ED BFAUTIfUIEY' STEP 10. REMOVE TEMPORARY ITEMS Once the home is properly supported and the marriage line connections are completed, remove the temporary ridge beam supports and wall/ceiling plates used to brace the ridge beam during shipment. Take care not to damage the ceiling. Remove and store or properly dispose of or recycle the hitch, axles, and wheels. These items are the property of the homeowner unless other contractual arrangements have been made. STEP 11. FASTEN HOME TO FOUNDATION Fasten the home to the foundation (typically to the sill plate) according to the fastening schedule provided by the LAHJ or approved foundation drawings. STEP 12. BACKFILL AND GRADE Backfill against the foundation wall to the height of the waterproofing, taking care to not damage the drainage system. Grade the site as described in Prepare the Site, STEP 3. CLEAR AND GRADE THE SITE (p.11). STEP 13. BUILD STAIRS Construct the basement stairs in compliance with the local building code. Take care that adequate headroom is maintained under beams and that there is sufficient landing space at the bottom of the stairs. vj ! & zz When to backfill. Backfill against basement walls on- ly after the home is con- nected to the foundation or the basement walls may deflect inward or collapse. Cutting the chassis. Do not cut, notch, bend, or alter in any manner beams, cross - members, and other parts of the steel chassis. M „�,.�,�.�o e,q�,,,�,,,_ Manufacturer's Installation Manual - June 2015 43 e e Roof omp And Exterior Walls Complete This chapter covers closing STEP 1._ ;COMPL STEP 2: COMPL STEP 3 COMPrL STEP 1. COMPL RIDGE CLOSEUP For multi -section homes, along the ridge line (Figs below. For homes with n come with the roofing m, 1. Install undei sure the roof STEP 7. COI along the len sheathing joi ga galvanize strip of roofin 2. Install shing tion, install th long, 3/8" dia each tab cut( edge (four fa and III, use b and one at e; a three -tab s oof and Exterior Walls and weatherproofing the home by completing the roofing and siding. ROOF first step in completing the exterior is sealing the roof 41). For homes with asphalt shingles, follow the procedure it or other roofing materials, follow the instructions that ials or provided as a supplement to this manual. Shingle Optional Metal (Wind Zone 2 & 3 Only) Factory Installed Shingles Factory Installed Shingles Underlayment Deck iyment (when sheathing at the ridge is installed on site). Make heathing is already installed (see Complete Multi -Section Set, NIECT ROOF, p.39). Install 15# felt or equivalent continuously .h of the ridge, covering all exposed sheathing and overlapping s by at least five inches on each side. Fasten using 1" x 1" x 16 staples. For Wind Zones II and III, also apply a six inch wide cement along each side of ridge under the underlayment. as. If shingles have been left off at the ridge line for site installa- m now using 1" x 1" x 16 ga galvanized staples or 12ga 1-1/4" ieter head roof nails. For Wind Zone I, fasten at 5/8 inch above it slot and one at each end of the shingle one inch in from the eners for a three -tab shingle) (Figure 42). For Wind Zones II 3 fasteners 5/8 inch above and on either side of the tab slots ;h end of the shingle one inch in from the edge (six fasteners for ngle). Do not fasten through the shingle tar line. Figure 41. Shingle installa- tion at ridge Weatherproofing. It is vitally important to close up the home quickly to protect the interior from damage due to inclement weather. Removing shipping protec- tion. Remove shipping pro- tection from the roof prior to completing roofing. 44 1 Manufacturer's Installation Manual - June 2015 j�36'Shingle i� 36°Shingle I� At x t z" x x x- x x x 12" x Fastener Locations 3. Install shingle cap. Starting at the opposite end of the home from the prevail- ing wind, install ridge cap shingles provided by the manufacturer or use 12" x 12" shingles (36" shingles cut into three equal pieces) (Figure 43). Install us- ing 1" x 1" x 16 ga galvanized staples or 12 ga 1-1/4" long, 3/8" diameter head roofing nails spaced 5-5/8 inches from bottom edge and 1/2 inch to 1-1/2 inches in from both edges. Cover the exposed fasteners with tar br cement. Cut shingle into three pieces as shown by doff 1 line 1�2�3 Typical Ridge Vent Fasten ridge rail together with fasteners staggered from section to section for the entire length (Screws must be located at ridge blockin Rid Ridge blockln HINGE ROOF CLOSE-UP For homes with hinged roofs, complete roofing underlayment and shingles along the hinge line (Figure 45) as follows: 1. Install underlayment. Attach the underlayment to the roof deck with a mini- mum of six-inch wide strip of cement. If necessary, trim the underlayment to allow the lowest shingle above the hinge of the roof to seal to the topmost shingle on the lower portion of the roof. 2. Install shingles. Install missing shingles according to the shingle manufactur- er's instructions. Figure 42. Shingle fastener locations for Wind Zone / (left) and Wind Zones 11 and 111 (right). Figure 43. Shingle cut into thirds ZZ &* Installing a continuous ridge vent. If a ridge vent is to be installed, follow the ridge vent manufacturer's in- structions provided with the material and connect roof with same toed fastener as in Step 7 Connect Roof (p. 39) but fasteners shall be grouped at ridge block loca- tions (Figure 44). Figure 44. Continuous ridge vent M,"e, �,�,�e,,.e,,,",t�• Manufacturer's Installation Manual - June 2015 45 Site Install Shingles In Hinged Area Per The Instructions On The Shingle Package Shipped Loose With The Home. ot��t� After Roof Is In The Raised Position, I JQQ Trim The Shingle Underlayment To Allow The Shingle Of The Upper j Roof Section To Seal Onto The Last Shingle Of The Lower Roof Section. Underlayment —� I Asphalt Roofing Cement Between Layers of Underlayment Minumum 6" Wide COMPLETE TRIPLE -SECTION ROOFS Complete roofing along triple -section home marriage lines according to one of the fol- lowing methods based on the construction of the home. Pre -Installed Sheathing 1. Install underlayment. First fold down the underlayment of the outer section roof. Then fold down the center section roof underlayment on top of the under- layment of the outer section roof. 2. Install shingles. Install missing row(s) of shingles, securing them per the shingle manufacturer's installation instructions (refer to the shingle wrapper). Center Section Outer Section Factory -Installed Shingles J Field -installed Shingleas ` Factory -Installed Shingles 12 4.3 (Optional) STEP 2. COMPLETE TAG UNIT ROOF If the home has a tag lunit, complete roofing for this unit now. The process for complet- ing the roof is different for flush and offset roofs. Follow the instructions in the appropri- ate section below. I FLUSH ROOFS For flush roofs, complete roofing along the marriage line and at the valley line as fol- lows (see Figure 47): Figure 45. Shingle installa- tion at hinge line Installing metal flashing. Install optional metal flashing over the roof decking before applying roofing cement. Fold back the underlayment and fas- ten 30 ga x 6" wide mini- mum galvanized metal with roofing nails or 16 ga x 1" crown staples of sufficient length to penetrate the roof sheathing. Space fasteners four inches o.c. or less near the edge of the metal. Overlap the metal by at least two inches at joints. Figure 46. Triple -section roof connection 46 1 Manufacturer's Installation Manual - June 2015 Shingle Undertayment Instal Flashing Rat Figure 47. Tag unit flush roof connection Marriage line Method 1: Install metal flashing (minimum 30 ga x minimum 6" wide) over the joint between the main roof dormer and tag unit roof. Secure the flashing to the roof decks on both dormer and tag unit roofs with roofing nails or 16 ga staples with a one inch crown and long enough to fully penetrate the roof decks. Space fasteners maximum two inches o.c. near the edge of the flashing. Overlap seams in the met- al by at least two inches. After flashing is complete, install shingles per shingle manufacturer instructions and ridge cap/vent according to STEP 1. COMPLETE ROOF (p. 44). Method 2: Install two layers of roofing underlayment or equivalent over the joint between the main roof dormer and tag unit roof lapping the factory installed under- layment a minimum of six inches on each side and fully cemented at the laps. In- stall shingles per shingle manufacturer instructions and ridge cap/vent according to STEP 1. COMPLETE ROOF (p. 44). Valley line Along the bottom of the valley, shingles and one or more layers of roll ,roofing may need to be installed. If fastened to the roof at the factory, unroll the roofing, overlap the tag roof and trim the roofing to the roof edge. If shipped loose, install the roll roofing at the valley, lapping it under the factory installed roll roofing a minimum of 12 inches and fully cement the roofing at the lap. Complete shingles at the valley either by interweav- ing them or by trimming back approximately four inches from the valley line and fully cementing the exposed shingle edges. OFFSET ROOFS If there is a gap between the main unit dormer overhang and the tag unit roof of less than two inches, fold up the main unit dormer fascia, slide the underlayment and flash- ing from the tag unit roof behind the fascia, and bend the fascia back down and secure into sub -fascia with metal screws (Figure 48). M. urn�Tuaen e[�utvmir- Manufacturer's Installation Manual - June 2015 47 (Shingles Not Shown on Mein Unitfor Clarity) Ddp Edge Fssda Main Unit Fadory-Installed Dormer Step Flashing ..r \ Tog Unit Donner Genies Up Into Roof Donner Sub -Fascia Kn. 3• If the gap between the main unit dormer overhang and the tag unit roof is two inches or more, bend up the inside corner trim at the dormer overhang and main unit sidewall, fold up the factory installed flashing on the tag unit roof, fold the inside comer trim back down, and secure into dormer wall with metal screws (Figure 49). Roof Decking —t Main U it Shingles Step Flashing (Or Top Cours Rocf Decking Of Vinyl Siding) Tag Unit Fastener STEP 3. COMPLETE SIDE WALLS Siding necessary to complete the exterior has been provided with the home. Follow the siding manufacturer'slinstructions (found on or with the packaging or as an addendum to this manual) and to complete the exterior siding as follows: 1. Remove shppping protection. Remove temporary shipping protection from walls. I 2. Complete crossovers. Complete any crossover connections in the walls, in- cluding: electrical, stereo speaker, doorbell, telephone, and intercom wires. 3. Install siding. Fasten siding only at stud locations, avoiding electrical wires that are present in the walls. 4. Install clo$e-up of strips. If siding has been installed on the end walls at the factory, fasten close-up strips securely along both edges and seal the edges with a waterproof sealant. 5. Install triT. Install any matching trim required to complete the installation. 6. Seal penetrations. With a waterproof sealant, seal any penetrations in the siding that may have been caused by temporary shipping protection. Figure 48. Tag unit roofing connection with less than two inch height difference Figure 49. Tag unit offset roof connection i 1 / A Covering the HUD label. Do not cover the HUD label on the exterior of the home. Removing shipping protec- tion. Remove temporary shipping protection (Poly- ethylene sheathing) from walls before installing sid- ing or serious moisture damage may result. Also, check weather resistive barrier (house wrap) for damage and repair if nec- essary. 48 I • Manufacturer's Installation Manual - June 2015 M,,,,e,,iCTe,a„ Connect Crossovers ',, This chapter covers crossover connections between units of multi -section homes, including ducts and electrical, water, waste, gas, telephone, and cable TV connections. STEP 1. CONNECT DUCTS (p. 49) STEP 2. CONNECT ELECTRICAL CROSSOVERS (p. 51) STEP 3. INSTALL ELECTRICAL BONDING (p. 54) STEP 4. CONNECT WATER LINES (p. 54) STEP 5. CONNECT DRAIN, WASTE, AND VENT LINES (p. 55) STEP 6 CONNECT GAS LINES (p. 57) STEP 7. CONNECT TELEPHONE AND CABLE TV WIRING (p. 57) STEP 8. CONNECT HOT WATER BASEBOARD HEAT (p.57) STEP 1. CONNECT DUCTS There are three main types of duct crossover connections. Based on the location of the duct, follow the installation steps on the page indicated below: • Under the floor (p. 49). • In the roof cavity (p. 51). • In floor, through -the -rim joist (p. 51) To prevent air leakage, seal all ductwork connections, including duct collars using one or more of the following materials: • Galvanized metal straps in combination with galvanized sheet metal screws. • For rigid air ducts and connectors, tape and mastics listed to UL 181A. • For flexible air ducts and connectors, tape and mastics listed to UL 181 B. UNDER FLOOR FLEXIBLE CROSSOVER DUCT When heating or cooling equipment is installed in the home, the flexible crossover duct is provided by the manufacturer. In all cases the crossover duct must be listed for exte- rior use. There are four common configurations of under floor crossover ducts depending on the number of home sections and the furnace/air handler location. See Table 20 to locate the appropriate figure. TABLE 20. UNDER FLOOR DUCT CONFIGURATIONS locationFurnace Furnace over trunk duct See Figure 50 See Figure 52 Furnace offset from trunk duct See Figure 51 y See Figure 53 VA ' ZZ Qualified personnel. Use on- ly qualified personnel to make crossover connections. Consult the LAHJ for licens- ing or any additional crosso- ver connection requirements. Access for service. Whenev- er possible maintain access to connection areas for fu- ture maintenance. Make tight connections. Permanent, durable, and tight crossover duct connec- tions are critical to the proper performance of the home. Leaky ducts can result in se- vere moisture problems in the home, discomfort from rooms not receiving the proper amount of condi- tioned air, and high utility bills from wasted heating and/or cooling energy. Manufacturer's Installation Manual - June 2015 49 A Heat Duct - Tap -Out Collar — Field -Installed Flex Duct A Section Heat Duct----� Tap -Out Collar Field -Installed FlexDud Furnace / Air Handier B Section Floor Flex Dud Support Straps Furnace /Air Ha® B Section Floor Flex Duct SupportStraps "V"-Box Under Furnace Furnace / Air A Section Handler B Section C Section Floor Heat Du IBM Tap-Uut Collar Field -Installed FlexDud "V'-13ox Under Furnace Flex Dud Support Straps Furnace / Air A Section Handler B Section C Section Heat Dud Tap -Out Collar Field -Installed Flex Duct Flex Duct Support Straps 'V"-Box Ujrder Fumace In -line "W-Box For under floor flexiblelcrossover ducts follow the steps below: 1. Locate collars. Locate the metal crossover collars (or V-box) connected to the main trun� duct (or furnace) under the home and remove temporary ship- ping protection. 2. Install innerlduct. Slide the crossover duct inner liner over the crossover col- larN-box as lar as it will go. Temporarily fasten the inner liner in place with duct tape. Install a large nylon zip -tie over the inner liner just above the "ridge" around the crossover collarN-box. Apply mastic completely over inner liner and collarN! box (alternately, the mastic may be applied to the collarN-box prior to sliding the duct inner liner over it). 3. Connect duct insulation. Bring the duct insulation up over the zip -tie and above the home's bottom board into the floor cavity. Temporarily duct tape it against the base of the trunk duct/V-box. 4. Pull duct rap. Pull the crossover duct outer wrap over the top of the insula- tion and temporarily secure it to the trunk duct/V-box with duct tape. 5. Install zipitie. Feel for the nylon zip -tie that was installed over the inner liner. Place another nylon zip -tie just under the first one to permanently secure the crossover duct insulation and outer wrap. 6. Trim duc . Trim the crossover duct to length such that the installed duct will be straig �t with no kinks or unnecessary bends. 7. Connectiother end. Follow the same procedure (steps 1 through 5) to con- nect the opposite end of the crossover duct and any other crossover ducts. 8. Seal joints. Seal the joints between the bottom board and the crossover duct with foam or mastic. Figure 50. Furnace over trunk duct, two home sec- tions Figure 51. Furnace offset from trunk duct, two home sections Figure 52. Furnace over trunk duct, three home sec- tions Figure 53. Furnace offset from trunk duct, three home sections Securing the crossover. Between Step 5 and Step 6, drill three or more 1/16 inch holes an equal dis- tance around and just below the bottom edge of the nylon zip -tie. Install #12 pan head screws in these holes, through the flexible duct and into the metal crossover col- IarN-box. The screw heads should be against the zip -tie. V&1 // Cover exposed metal. Com- pletely cover all exposed metal connectors with insula- tion. Apply sealants and tape; only to surfaces that are dry and free of dust, dirt and grease. I 50 2015 Manufacturer's Installation Manual - June - Avoid ground contact. In- 9. Support duct. Support the crossover duct(s) above the ground using nylon or stalled crossover ducts must galvanized metal straps and saddles spaced every 48' inches o.c. or less. not be in contact with the Choose straps at least 1/2 inch wider than the spacing of the metal spireals ground. encasing the crossover duct. Install the straps so they cannot slip between Unobstructed airflow. Excess sprials. Secure metal straps with galvanized screws. length, kinks and bends in the crossover duct will restrict air - ROOF CAVITY CROSSOVER DUCT flow and degrade the home's For ducts installed in the roof cavity, follow the steps below: HVAC system performance. 1. Roof Access Panel: After units have been set, locate the roof access panel. Fold back the roofing paper and unscrew panel, reach in and attach ducts as shown below. Replace access panel, cover with roofing paper and finish the shingles and ridge cap. 2. Alternate to Roof Access Panel: The units are located as close as possible at set-up and the ducts are connected. Units are then moved together, being careful not to crush the ducts. Figure 54. Duct crossover ROOFACCESBPANEL FASMTOALLFHAMINO Located in the roof cavity. NEMBERS W NXTWOOU SCREWS AT 6' O.C. MAX RO0FACCE39 PANEL F� ROOFACCESS PANEL COLLAR MIXER PS.ANOM MIXER BOX FLEX DUCTTO BE II NVAC CONNECTTHROUGH MATING LINE OF NOSE FLEXDUCT TOBEPULLED OF 0WAC CONNECTOR BOX NVACCONNECTORBOX ATTACHED TO COL ARAND NONE FROM EACH HAtF. BMIOEOATSET-UP ATTACHE0% COUARAND BANDED AT SET-UP OPTION 1-MWER BOX ON OPTION 2-V,* BOX AWAY FROM �AI1. - IN THE FLOOR CROSSOVER DUCT Where one or more crossover ducts are built into the home's floor system, connect them at their openings that run through the rim joists. Through the rim joist 1. With a through -the -rim joist design, the duct in each floor section terminates at an opening in the marriage line rim joist. Fixed through -the -rim crossovers employing a marriage line gasket such as in Figure 27 were completed in Complete Multi -Section Set, STEP 4. REPAIR OR INSTALL MARRIAGE LINE GASKET (p. 36) and require no additional work here. STEP 2. CONNECT ELECTRICAL CROSSOVERS Multi -section homes may have one or more electrical crossovers located in the wall(s) PF and/or floor(s) along the marriage line(s). ' JOINING WIRES Use,qualified electricians. Two types of connections may be present at these locations —snap connectors and All electrical work must be junction boxes. Identify matching circuits if multiple circuits exist at a single crossover performed by a qualified location. These will be coded for identification. Connect snap connectors according to electrician and comply with the connector manufacturer's installation instructions, including fastener requirements. the 2005 NEC. Connect wires injunction boxes as follows (Figure 55): Disconnect power. Turn offpower to the home before Pull wires. Pull circuit wires into the junction box, sliding them through a romex con- making connections. nector and secure snugly. (Figure 55) Do not over -tighten. MANBFACIBNFB 6EABTIfBILT• Manufacturer's Installation Manual - June 2015 51 1. Strip wires. Remo providing a minimu 2. Connect wires. C( ately sized wire nu cover plate(s), if m 20-amp circuits, or 3. Replace cover. R( (not sheet metal) s the outer jacket that holds the circuit wires together of four inches of free wire in the box. nect wires together matching like colors, using appropri- Use the ground wire to ground the junction box and/or il. Junction boxes may contain single or multiple 15 or single 240-volt appliance circuit. )sition the junction box cover and secure using machine �Whl*r-1 A orovedP lax 6c orMabl Box Black(Typical) Ground r�xl Box Used PerType Box Used (rypkal) Aund Lug Metal Box (Only) Single 15 or 20 AMP Circutl FLOOR CROSSOVER When making electrical scribed below: Method 1: Access 1. Access wires. if attached. If a board to expos 2. Route wires. joist or if there der the rim jois bumped -out ac up the rim joist the wire throug 3. Connect wire: scribed above. 4. Secure wire eight inches 5. Install smas tors (smash 1 6. Seal bottom seal the bott( vided). The location or st Double 15 or 20 AMP Circults nection(s) in the floor, use one of the wiring options de- 'ind the crossover location(s) and remove the access panel(s) :ess panel openings are not provided, cut through bottom the wiring (Figure 56). ass the wires through predrilled holes or notches in the rim a single bumped -out access panel as in Figure 57, then un- If holes or notches have not been provided and there is no ass panel, drill maximum one -inch diameter hole(s) half -way on each home section, making sure the holes align and feed the hole. Connect wires via a junction box or snap-connector(s) as de - Secure wires with staples to adjacent joists or studs within junction box or snap-connector(s). plates. For notched perimeter joists, install steel wire protec- board. Replace insulation and re -install access panels and/or r board with tape specially made for that purpose (may be pro- cess panel(s) may be temporarily installed near the crossover pped loose with the home. Hole Through f - , Rim Joist r i T 1� Junction Box or I _ HJoists Ara tdotdted, Steel Protectors May I Be Provided With the Fbme Snap -Connector ll l I ----_Be Provided Panelss May Proper use of GFCI circuits. Ensure Ground Fault Circuit Interrupted (GFCI) circuits are connected to the proper GFCI protected circuits from the power supply. Figure 55. Types ofjunction box wiring connections Appoved Connecbs Lug Petal Boxes Only) 240V Appliance arcull i ' // Using snap connectors. Do not use oversized nails or drive nail heads into snap connectors. Some con- nectors are designed for one-time use only — a new connector must be used if they become separated. Protect cables. Cover all cables with conduit or other suitable weather -resistant and protective material. Figure 56. Electrical crosso- ver floor wires with flush ac- cess panels 52 I Manufacturer's Installation Manual - June 2015 MANYIACIUR.0 eeAerirurt- Box orSreP 03mecty P1Dt8dhf60— (N Not PwIded, Patch Bettor Bead.) Method 2: Junction box with conduit 1. Access boxes. If junction boxes are not exposed, access them inside the floor by cutting the bottom board or by removing the access panel(s). Remove the junction box covers. 2. Connect wires. If wire is coiled inside one junction box, insert it into provided flexible conduit and pass it under the rim joists to the opposing box and make the connection as described above. If no coiled wire is provided, install pro- vided ship -loose conduit with wire making connections in both boxes (Figure 58). 3. Cover boxes. Replace and secure covers on junction boxes. 4. Seal floor. Replace any displaced insulation and replace access panel or seal the bottom board with tape specially made for that purpose (may be pro- vided). Variation to Method 2: A junction box may be installed only on one side with the other side containing conduit behind an access panel. Bring the conduit to other side and make one connection in the junction box. Z�� �So goo Junction Box (May Be Under WUe Por Crossover orAlongside Floor Joist ay Be Coiled Inside Junction Box Iexible Conduit WALL CROSSOVERS Connect electrical, phone, cable television, and stereo speaker wires in marriage walls and/or partition and end walls. If access panels into the marriage walls are not provided, then the connection should have been made prior to bringing the home sections together. If access panels are provided in marriage, end or partition walls, remove the panels, join the wires as de- scribed above using the provided snap -connector, junction box, or at a receptacle, and re -attach the access panel (Figure 59 for marriage walls and Figure 60 for partitions and end walls). Figure 57. Floor electrical crossover wires with bumped -out access panel Figure 58. Under the rim joist electrical crossover connection with conduit Avoid damaging crossover wires. Carefully fold mar- riage wall crossover wires so they stay within a single bay and are not sand- wiched between studs when the sections are pulled together. Mu,drnctuxteee�urvmtr• Manufacturer's Installation Manual - June 2015 53 Optional Access - Panel Endwall Access to Junction Side'A' Box -Inside Home Connect Wires at Junction Box, Receptacle, or Snap -Connector Factory -Installed Wire Protectors I\ Marriage Line Endwall Side 'B' STEP 3. INSTALL ELECTRICAL BONDING To ensure all metal parts dare effectively grounded, electrically bond all chasses to- gether as follows (Figurel61): 1. Find lugs. Detelrmine if solderless ground lugs are provided on the front or rear frame outriggers or headers. 2. Attach wire. If�ugs are provided, uncoil the bonding wire (#8 minimum bare copper wire) from one side of the home and connect it to the lug provided on the opposing side using the provided paint penetrating star washer, tighten the set screw firmly on the wire and repeat for any additional home sections. arriage Line Rear Outrigger at J (_#8 Min. Copper �Soldedess Lug Each Marriage Line I Ground Wire Half of Home 3. Attach strap 1 If ground lugs and copper wire are not provided, attach the pro- vided four -inch bonding strap to each pair of adjacent chasses with two #8 x 3/4" self -tapping metal screws (one screw each side). STEP 4. CONNECT WATER LINES Connect water lines iside the floor through access panels or below the bottom board as follows: WATER LINES ACCESSED THROUGH PANELS 1. Remove pa�els. Remove access panels from each home section. 2. Remove caps. Remove shipping caps from ends of water lines. 3. Pull lines. Pull water lines through holes in rim joist. If holes are not provided, drill round oles in the center of the rim joist, with a maximum diameter of one third the rinj joist depth (Figure 62). Figure 59. Inside marriage wall crossover connection Figure 60. Inside partition or end wall electrical crossover connection Figure 61. Electrical bonding of multi -section homes V&AZZ Applying cement. Follow ce- ment manufacturers instruc- tions with respect to applica- tion and drying time. Allow cement to fully cure before filling pipes with water. l54 Manufacturer's Installation Manual -June 2015 _ 4. Connect pipes. Connect threaded water lines using provided connector fit- tings (do not use lubricants or sealants). Connect non -threaded water lines using provided fittings and cement, inserting pipe to full depth of each fitting (a short connector pipe may be provided to bridge the gap between sections). 5. Test. Test connections for leaks. 6. Seal floor. Securely replace insulation and access panels. WATER LINES DROPPED BELOW BOTTOM BOARD 1. Remove caps. Remove protective shipping caps from ends of pipes and make sure pipe ends are clean and smooth. 2. Connect pipes. Connect threaded water lines using flexible pipe or a rigid connector line (if provided) and connector fittings (do not use lubricants or sealants). Connect non -threaded water lines, pipe, and elbows with cement provided, inserting pipe to full depth of each fitting (Figure 63). 3. Test. Test connections for leaks. 4. Protect pipes. Wrap water lines with insulation and bottom board shipped loose with home or otherwise protect to prevent freezing. Tape bottom board using tape specially made for that purpose (may be provided) and staple with 7/16" x 1/2" staples at four inches o.c. around bottom board using a divergent (stitch) stapler or equivalent. If heat tape is used it must be listed for manufac- tured home use and be installed in compliance with manufacturer instructions. I� Marriage Line Supply Side Ir (Side With Water Heater) j Receiving Side Diection of Row i I I ! Gasket Cap to Be .b Protective Cap Removed on Site YJ Water Line and Elbows Shipped Loose to be Added on Site STEP 5. CONNECT DRAIN, WASTE, AND VENT LINES Complete portions of the drain, waste, and vent (DWV) system that are below the floor as follows: 1. Remove caps. Remove shipping covers from pipes extending through the bottom board; inspect pipes and fittings and clean them of dirt, obstructions, and burrs. 2. Assemble pipes. Using the drain schematic drawing provided with the home, begin assembling the DWV system starting at the location farthest from the sewer/septic connection and working towards the outlet, fastening the pipe with cement or adjustable screw -clamp connectors, if provided (Figure 64). As the system is assembled, support the piping with temporary blocking. Un- less otherwise noted on the schematic diagram, provide a minimum 1/4 inch per foot slope towards the sewer/septic using a plumber's level. Where a slope of 1/4 inch per foot cannot be maintained, use a minimum slope of 1/8 inch per foot and install of a full-size clean -out at the uppermost point of the run (Figure 65). Figure 62. Waterline cross- over with access panels Choosing cement type. Use the proper cement for water lines as it may differ from the cement used for the DWV system. Figure 63. Waterline cross- over through bottom board ' o z Providing required clearances. Provide the drain outlet with a minimum clearance of three inches in any direction from all parts of the structure or any appurtenances and with not less than 18 inches unrestrict- ed clearance directly in front of the drain outlet. Provide any cleanouts with a minimum clearance of 12 inches directly in front of its opening. M „orncrucen eenurirour• Manufacturer's Installation Manual - June 2015 55 Cement Coupling (Provided) to Endof Pipes Drain Pipe FasOen ('.o�lirg (Provided) b PipN Wlfh Clamps Support Straps r Direction of Flow and Slope Direction of Flow and Slope Coupling Connection Pipe Coupler �UCX�CX�2�� X_X Pipe Dust rain Supports —`I r.mFor Dropout Figure 64. Drain crossover connection Figure 65. DWV system Dropout Cover Turn EII Cover Tee Slo Wye Long TurnTee Wye (Su bsitutefor Obow lean -Out Plug Double DI I ong Tum DI and Provide a Full -Long Turn El Size Clean Out When To Sewer/Septic Required) 3. Test. Conduct a two-part leakage test on the completed drainage system as follows: • Part 1. With all fixtures connected, and all tub and shower drains plugged, fill the system with water to the rim of the toilet bowl through a higher fix- ture. Release all trapped air, replace tub and shower plugs, backf(ll fix- tures, and allow the system to stand at least 15 minutes. Check for leaks. Drain the s� stem. If leaks are found, repair and retest. • Part 2. Plug all fixtures, sinks, showers, and tubs and fill with water. Re- lease the %Later in all fixtures simultaneously to obtain the maximum pos- sible drainlpiping flow. As water is draining, check for leaks. If any are found, repair and retest. 4. Connect to outlet. Connect the main drain line to the site sewer/septic hook- up, using an approved elastomer coupling (Figure 66). Examples of i Connection Pipe I and Fittings (Not Supplied by the w Manufacturer) Support Strap at Maximum of 4 Feet on Center Cap and Chain Approved Site Sewer Hook Up 5. Install supports. Install permanent drain line supports at a distance of four feet o.c. or less (see Figure 64, Figure 65, Figure 66, and Figure 67). i ' /, Choosing glues. Use only solvents and glues compat- ible with the pipe (ABS or PVC). Follow manufactur- er's instructions. Figure 66. DWV connection to sewedseptic 56 1 Manufacturer's Installation Manual - June 2015 MANOIACTUnlO Off-TIrOLLY' ,//"-(2) 0.131'Diax3 a Nails Min.2x3 Lumber 0.131' Diax3kNail — Galy. or Alum.Ship — M1n.1x3Lumber — (2) 0.131'Diax3 }" Nalls Into Floor Jdst (2) a x2'x16G4 Staples or(2) 0.131' Dia x 3 a Nalls Each End (2) Staples or Screws Each Side or Alum Strip x3Lumber . Pipe — 6. Insulate. Replace any insulation and make sure all potentially exposed portions of the DWV system are well insulated to protect against freezing. STEP 6. CONNECT GAS LINES The gas crossover connection may use quick disconnect fittings or threaded connect- ors. Find the connection location below the floor at the marriage line and gather the connectors (they may be shipped loose if not present under the home). For quick disconnect fittings (Figure 68), remove any dust caps and then with one hand, pull back on the quick disconnect device, snap it over the quick disconnect adap- tor and release it to complete the connection. For threaded connectors (Figure 69), remove the black cap and nipple (or any other plugs, such as a black iron plug) from both the supply and receiving sides and screw the connector onto the supply and return pipes as necessary. Check for leaks before connecting to gas service (see Connect Utilities, STEP 3. CONNECT GAS SERVICE, p. 76). Quick -Disconnect Male Fitting Flex Factory Installed Quick -Disconnect Female Fitting Installed on Inlet Side Male Cap Female Cap Direction of Gas Flow Shut-OffValve Installed on Inlet Side Flex Connector Factory Installed Female Cap 77 'Or Male Cap Direction of Gas Flow STEP 7. CONNECT TELEPHONE AND CABLE TV WIRING Install telephone and cable television wiring in accordance with the requirements of the LAHJ, the NEC, and NFPA No.70-2005. When making crossover connections or in- stalling telephone or cable television wires, do not run them in the same raceway as, or in close proximity to -"high voltage electrical conductors or cables. Wires should only be installed by trained professionals. STEP 8. CONNECT HOT WATER BASEBOARD HEAT Install all crossover connections for hot water baseboard heat with copper sweat fit- tings, copper unions or other approved metal connections. Figure 67. DWV pipe sup- port options ' /, Protect pipes from freezing. If the home is to be left un- heated in cold weather, pour antifreeze solution into all drain traps, including sinks, tubs, and toilets. Be sure that the antifreeze is safe for the fixtures and P-traps. Installing quick disconnect fittings. Do not use tools, lubricants, or sealants with quick disconnect fittings. Gas test precautions. Do not connect to gas service until tests described in Connect Utilities have been successfully completed. Figure 68. (Left) Gas cross- over with quick disconnect fittings Figure 69. (Right) Gas crossover with threaded connectors Installing wiring. When in- stalling telephone and ca- ble television wires, do not damage electrical wires, plumbing lines, or ducts. Serious personal injury or death could result from damage to electrical wires. M�ayr�craprn sr.er„a«.- Manufacturer's Installation Manual - June 2015 57 Complete the Interior This chapter covers the co cellaneous items. of the home's interior finishes including finishing walls, ceilings, flooring, trim, and mis- STEP 1. ALIGN MARRIAGE WALLS (p. 58) STEP 2. FINISH GYPSUM BOARD (p. 58) STEP 3 COMPLETE WALL AND CEILING FINISHES (p. 59) STEP 4. COMPLETE CARPET (p. 59) STEP 5. COMPLETE TRIM (p. 59) °, STEP 6. INSTALL SHIP LOOSE ITEMS (p. 59) STEP 1. ALIGN IMARRIAGE WALLS Align and secure walls at marriage line openings as follows: 1. Align walls. Align walls and clamp in place. 2. Fasten walls. Secure clamped walls together with metal straps or long screws so they do not nj ove when the clamps are removed. Insert wood wedges in gaps between Walls, and glue and screw to create a tight connection. 3. Fill gaps. Fill any remaining gaps with wood or sheathing material. STEP 2. FINI Finish all unfinished c 1. Install pane bead of adhi wall screws, inches o.c. ii 2. Mud seams sions. Follow 3. Paint. Wher sum board t iH GYPSUM BOARD jpsum board walls and ceilings as follows: s. Install ship loose gypsum panels using a 1/4 inch diameter sive on all framing members and minimum 1-1/2 inch long dry- iails, or staples at six inches o.c. along panel edges and 12 the field into framing members. Mud and tape all seams and corners, filling all fastener depres- mud manufacturer's directions. the final coat of mud is dry, prime and paint all unfinished gyp - match existing paint color and finish texture. OFF V Fastening gypsum. When attaching gypsum board, depress, but do not break the paper face with the fas- tener. Breaking the paper will weaken the connection. Using alternative materials. Obtain the home manufac- turer's approval before us- ing interior finish materials other than those provided with the home. 58 Manufacturer's Installation Manual - June 2015 � � _ STEP 3. COMPLETE WALL AND CEILING FINISHES Install interior ship loose wall and/or ceiling panels using a 1/4 inch diameter bead of polyvinyl acetate (PVA) adhesive on all framing members and fasten with minimum 1- 1/2 inch long staples or nails at six inches o.c. along panel edges and 12 inches o.c. in the Feld into framing members. STEP 4. COMPLETE CARPET Install and seam ship loose or rolled carpet as follows: 1. Prepare floor. Clean the floor of all dirt and debris and smooth the floor deck at the marriage line seams as necessary to ensure a level and smooth sur- face. 2. Lay pad. Lay down the carpet pad, if provided. 3. Stretch carpet. Ensuring all carpet "grain" runs in the same direction, fit and secure the carpet using a power carpet stretcher. Stretch the carpet up to the seam and tack it down temporarily until the carpet is seamed. 4. Butter carpet. "Butter' with carpet adhesive the edges of the carpet along the seam. 5. Seam carpet. Place heat bond tape under the seam with the glue side next to the carpet and apply heat from a seaming iron to the top of the seam, press- ing the carpet into the glue. 6. Keep scraps. Retain reasonable size carpet scraps to protect carpet and flooring during move -in. STEP 5. COMPLETE TRIM Using fine gauge wire staples or pin nails, install ship loose molding,and wainscot pan- eling to finish trimming out ceilings, marriage line walls, front and rear end walls, and passageway doors where necessary. STEP 6. INSTALL SHIP LOOSE ITEMS Remove all strapping, blocking, and packaging from appliances, windows, and doors. Install any drapes, mini -blinds, mirrors, door stops, closet shelves, and hardware per the product manufacturer's installation instructions. 'j ! &�� Installing carpet. Only ex- perienced carpet installers should install carpet. Fail- ure to follow the carpet manufacturer's directions may void the carpet war- ranty. Stagger seams. Stagger all seams. For ex- ample, locate the carpet pad seam three inches to left of marriage line and the carpet seam three inches to right of marriage line. • • M.�+�F��,.aE„Eq�,,,�,�.. Manufacturer's Installation Manual - June 2015 59 Install Stabilizing Systems This chapter covers the design and installation of the stabilizing system which secures the home against lateral and up- ward forces caused by wind! The system covered here uses earth (or ground) anchors and steel straps connected to the home's longitudinal steel beams and/or exterior walls. Stabilizer plates shall be used to prevent the anchor head from moving laterally in the ground. An anchor, strap, and stabilizer plate together are referred to as a tie -down. Anchors can also be mounted in concrete footings when there is enough concrete mass (weight) to resist the lateral and upward forces. This type oflsystem is not covered in this manual. STEPI. DETEI STEP 2 -'DETEI STEP 3. , SELEI STEP 4. , INSTA •i VTSTEP 5 `-INSTA STEP 6 TIGHI STEPI. DETE Create a sketch of the h and frame 1-beams (this page 15). MINE ANCHOR LOCATIONS (p."60) IIINE ANCHOR LOCATIONS e plan showing the exterior walls, marriage line(s) (if any) I be similar to the base sketch created in Install Footings, See Table 21 for a list of anchor locations, types, and where they are required. Pages where the requirements Iare provided are noted in the last column. As each anchor location is determined, mark it on the sketch, noting important dimen- sions such as spacing between anchors. When complete, this will be the home's tie - down plan (Figure 70 qnd Figure 71). TABLE 21. ANCHOR LOCATION TYPES' Location... Frame Yes Yes 61 .- - Vertical No it Yes 65 Frame Yes Yes 65 End wall Vertical No �' No I 65 Frame Yes NA 65 Tag Unit Vertical ry No 7 NA 65 Porch •. I Vertical No At Vertical Straps 65 ____&ff Set UnitSame as Single j; Section Home �r 65 T Connect any factory -installed sidewall tie -down straps to a ground anchor regardless of the wind zone in which the home is placed. Figure 70 and Figure 71 illustrate typical anchor locations for a double -section home in Wind Zone I and Wind Zones II and III respectively. V&0ZrZj Need for a stabilizing system. The manufac- tured home must be se- cured against the wind by the use of an anchor assembly or an alterna- tive foundation system. Where site or other conditions prohibit the use of the manufactur- er's instructions, a reg- istered engineer or reg- istered architect must design the stabilizing system. Flood and seismic forces. The stabilizing system re- quirements in this chapter do not consider flood or seismic loads and are not intended for use in flood or seismic hazard areas. In those areas retain a regis- tered engineer or registered architect to design the sta- bilizing system. 60 1 Manufacturer's Installation Manual - June 2015 - 0 --------------------- itG----IF---------I------ Sidewall Frame Tie -Down —[-Beam End Wall Tie -Downs Marriage -----'0--- Line Key. h I?-"--AnchorHead I+—Stra p Vertical Tie- &.* —Down Standard PierArea rLaeoLongitudinalAnchors�.1 ---------------------------- -- 1Man Beam —C�� --- --- ----- -----k—A ---- ---e— Larerol rame Tie•Down High Pier Area Standard PierArea Sidewall ertical Lateral Frame Tie -Downs Tie -Down to Far Beam SIDEWALL FRAME ANCHORS Use Table 22, Table 23 and Table 24 to determine the spacing between anchors for Wind Zones I, II, and III, respectively. Spacing requirements will vary depending on the type of home (single or multi -section), the slope of the roof, the width of the floor for each section, the sidewall height, I-beam spacing, and the height from the ground to the strap attachment point. Determine the values for the home. Using the table for the appropriate wind zone, determine the column and row that corresponds to the charac- teristics of the home. The value on the tables is the maximum distance between an- chors. Keep in mind that sidewall frame tie -downs must be located no more than two feet from each end wall and no closer than four feet to another tie -down.. Figure 70. Typical anchor locations for a double -section home in Wind Zone I Figure 71. Typical anchor locations for a double -section home in Wind Zones ll or 111 V&1PZrZj Maximum spacing require- ments. The LAHJ may have anchor spacing requirements that supersede the values pro- vided in this manual. Manufacturer's Installation Manual - June 2015 61 TABLE 22. WIND ZONE I SIDEWALL FRAME ANCHOR MAXIMUM SPACING (MINIMUM ANCHOR SPACING 4'-0") 9' — 09" 10, —11" 9" — 09" ` 13' — 05" '10'-03° '11'-08" 13.-05 10,-10" •12'_01" •13'_03" ,13'-05" 11 —04, 12'y04°�'12'-05" 12'-09_" 8'-10" "9'-07" 8'-10, 12'-01" `8'-11" 11Y— '10'-04" w '12'-00" — `12'-01" _ ' 9' — 06" 10108"_-- 11' _ 11. 12' — 01 ° '9'-10" — `10'-11" iS •11'-02" s 11-06" 8' — 00" ' 8' — 06" 8' — 00" ' 10, — 09" '7-_10" 'j — '9"-02"�—'10'707" tl tl'10'-09-- `8'-05" '9'-07" 10,-08" '10,-09" .9 -10" _ [ 10'— 02" i _�.101— 05" 11' — 07" 9' —10" 11' — 07" 9' —10" 9'-0F 17 • 10 —1'1" fl 9'-04" �13-05_^ ' 10, — 03" ' 11' — 06" ' 13' — 05" ' 13' — 05" ' 10 — 09" ^ • 11' —10" y n , 12, _ 09„ _ 13' - 01 10, — 05" 8' —10" 10, — 05" 8' —10" 8' — 04" 9' — 06" 8' — 04" 12' — 01" '8-11" 10'-01" '12'-01" •12'_01" '9' — 05" `10' — 05° ~i ' 11' — 06" `11' — 09" 9' — 06" 8' — 00" 9' — 06" 8' — 00" `8'—.05" n T-07' 'T-10" '8'-11" '11'-00" ' 8— 03°� ' 9' — 03"� • 10' — 05" i 10-08. 4 12' —10" 11' — 09"� 12' —10" 11' — 09" 10'-10V ~^ 9 —06" I" -- — -- 10'-10" 9'-06° 9' — 02" T — 09" 9' — 02" T — 09" T-10' .1l'_06"—�� 7'-10" 13'_05.._. 11'—O6' 10'-07" 11'-06" 10'-07" 9 — 09" — 07"—�L 9' — 09" 8 — 07"- �«-8- 8' — 03" 7' — 00" 8' — 03" 7' — 00" T-01" ii '10,-00" i'~ 7'—b1" i�—_'12'-01" 10'— 06" 9' — 07" 10'-06" 9' — 07" 8 —10" __.i_M....._.._T — 09 i 8, _ 10" — �{ 7 — 09" 7' — 06" 6' — 04" T — 06" 6' — 04" 6-05" i `8-10- 6'-05° � '101 —11" 13' — 05" 13' — 02" 13' — 05" 13' — 02" 12' — 02" 11' — 04" 12' — 02" 11 - 04" 10, — 08" 9' — 08" 10, — 08" 9' — 08" 9' — 05" it ~ 8' — 04" 9' — 05" i 8' — 04" 11'-08" 11'-10" 12'-01" 11'-10" 11' — 00" 10'— 02" 11' — 00" 10 — 02" 9' — 07" 8' — 09" 9' — 07" 8' — 09" T — 06"� 8' — 05" 'r. 7`— 06" _ L 9'-01, 10'-09" 11'-00" 10,-09" 10' — 00" ii 9' - 03" Y .. 10' — 00' -- _ 9"— 03" .._____ 8'-09" T-11" 8'-09" T-11" o 6' —10" u T — 08" 6' —10" * Indicates a configur tion that will require an additional strap connected to the far beam (seelFigure 72). OF ALgB q `9 PHILLIP J. 9 CoP ANQ I At �L NEER i} z} N 0jz 320 .5 4 0� tonal June En9�nm June 1, 2015 62 1 Manufacturer's Installation Manual - June 2015 TABLE 23. WIND ZONE II SIDEWALL FRAME ANCHOR MAXIMUM SPACING (MINIMUM ANCHOR SPACING 4'-0"1 ' S - 04" ' 5' - 04" 5' - 04" ' 5' - 04" -- '5'-04" 5'-04" 5-04 '5'-04" 5' - 04" ' 5' - 04" ` 5' - 04" ' 5' - 04" .. 5'-04" 5'-04- '5'-04" '5'-04" '5'-04"- - 5'-04" 5'-04" `5'-04" 5 04" - -- �5 - 04 _ ._...- 5 - 04° 5- 04" - 5' - 04" ' 5' - 04" ' 5' - 04" ' 5' - 04" -' 5 -04- - - - .5. -04 _._.._a�.5.-.04- 5 -04- `5'-04" '5'-04" 5'-04" '5'-04" 5' - 04" - - -- .-5' - 04" 4- -- .-.------- ' 5' - 04" ` 5' - 04" ' 5' - 04" ' 5' - 04" 5' - 04" - - -, 5' - 04" 5' - 04" 5' - 04" ` 5' - 04" 5' - 04" 6-04" 5'-04" - `5'-04" a`5'a 04" '5'-04" '5'-04" '5'-04" '5'-04" `5'-04" `5=0404_-_ 5 .54" •5 04" -5'-04"- 5' - 04" ' 5' - 04" 5' ' 04" ' 5' - 04" 'S'-04^---5'�04"-,-__...-.5 '04"------5,04-- 14 Wide, 5' - 04" ' 5' - 04" ' 6 - 04" ' 5' - 04' -- 5, _ 04 - - - 5, _ 04e- 6' -p4° - -- -• 5'-- 04" - 04" ' 5' - 04" 5' - 04" ' 5' - 04" 5'-04" `5'-04" - `5'-04" "5'-04" '5'-04" - '5'-04" '5'-04" '5'-04" 5- 04" 5' - 04" 5' - 04" ' 5' - 04" 5' - 04" 5' - 04" 5' - 04" 5' - 04" - -- 5' - 04" -- - . 5 - 04" _ 5' - 04" .. --- ; 5' _ 04-- 5' - 04" ` 5' - 04" ` 5' - 04" - -- 5' - 04 -5-- 04" - 5' - 04 - -5'-- 04- M. 5' - 04" 5' - 04" 5' - 04" 5' - 04" 5' _04 _ ` ' 5' - 04" -.--- - - 5' - 04" --.. _ ' S - 04 16 Wide .5'-04" '5'-04" '5'-04" '5'-04" ' 5' -04" ' '- 04" - ' S - 04_- -5e- 04� -- - 5 - 04" - ---- 5 - 04" 5' - 04^ - 5' - 04" -- '5'-04" - "5'-04" -;;- 5'-04- '5'-04" 5' - 04" 5' - 04" ` 5' - 04" ' 5' - 04" ---5'`04- 5' _04" 5 04 _ .._-._.'._5'-04_- - 5 - 04" -._ 5' - 04" 5' - 04" 5' - 04" 5' - 04. -5' - 04" 5' - 04" j -5' - 04" 5' - 04" 5' - 04" 5' - 04" 5' - 04" , 5, - 04" 5, _ 04„-' , ---; 5, _ 04- -- 5, _ 04".-.. 5' - 04" 5' - 04" 5' - 04" 5' - 04" 5 = 04" - 5' - 04"- - 6-04" 5' - 04" 1:8 Wide ® - _ 5' - 04" ` 5' - 04" 5' - 04" 5' - 04" 5' - 04" - 5' - 04" 5' - 04" ' 5' - 04" ----------.-_r.._...�_....._._...._._-_-__.._"- - -- - - 5 _ 04"------- 5' - 04" ----___ -- 5' - 04,- ..----- --5 _ 04" --- -- 5'-04°---- - 5 -04^ 5'-04"--5'04" - ' 5' - 04" ' 5' - 04" 5' - 04" ' 5' - 04" .. .-_.-• 5 - 04" ----- 5, _ 04" - 5' - 04^ - -- 5, - 04" - Indicates a configuration that will require the frame strap connected to the far beam (see Figure 72). P�OF ALq q� PHILLIP J. 9 co P N4. �I Ak NGINEER N0. A 32035 � June 1, 2015 Manufacturer's Installation Manual - June 2015 63 TABLE 24. WIND ZONE III S'IDEWALL FRAME ANCHOR MAXIMUM SPACING (MAXIMUM ANCHOR SPACING 4'-0" 1 • r 4'-00" `4'-00" 4'-00" '4'-00" '4`-00"_ g � "4'-00" _ '4'-00' � `4'-00" •4'-00" •4'-00" '4'-00" -4'-00" "4'-00" ;f '4'-00"; '4'-00" •4'-00" r 4'-00"� '4'-00" 4'-00" '4'-00" '4'-00" ;! "4'-00" '4'-00" Ir -4'-00" '4'-00" '4'-00" '4'-00" '4'-00" '4'-00" '4'-00"-00° p '4'-00° r •4'-00" -4'-00" 4'-00" •4'-00" 00" ;, _ •4'-00" { •4'-00" '4'-00" `4'-00" '4'-00" 4'-00" '4'-00" '4'-00"- 'V 4- 00" '4'-00" '4'-00" r 4'-00" 4'-00" 4'-00" 4'-00" 4'-00" ; '4'-00" 4'-00" " `4'-00" '4'-00° •4'-00" -4'-00° '4'-00"4 • --ter---'^-----^- °4'-00" 6` •4'-00" "+ ii 'a'-00" %' `4'-00" 4'-00" 4'-00" 4'-00" 4'-00" ^�. i •4'-00" "�_ "4'-00" ^ ii 4'-00" a "4'-00" 14 Wide r 4'-00" '4'-00" `4'-00" `4'-00" 4-00"•4'-00" •4'-00" r I 4'-00" -4'-00" 4'-00" 4'-00" '4'-00" `4'-00" ° '4'-00" P, '4'-00" '4'-00" '4'-00" -4'-00° `4'-00° '4'-00° ;, •4'-00" �ii �4'-00° In�4'-00° 4'-00" 4'-00" 4'-00" 4'-00" 4'-00" p, - 4'-00" " � 4'-00° u 4- 00" 4'-00" 4'-00" 4'-00" •4'-00" •4'-00" 4'-00" •4'-00" 4'-00° r 4' - 00" 4' - 00" 4' - 00" 4' - 00" 4'-00" 4'-00"�0 4'-00" 7 4'-00" 16 Wide 4'-00" '4'-00" 4'-00" '4'-00" 4 -DO 4'-00" 4'-00"- • r 4'-00' 4'-00" 4'-00" 4'-00" 4'-00" •4'-00" i 4'-00" 4'-00" '4'-00" '4'-00" `4'-00° '4'-00" r 4' - 00"—'��------ 4' — 00" i� 4' - 00— .. • 4' - 00" a —oo• a'—oo" a'—oo° a'—oo• a'-0o" r a'-00" '-0o 4'-00" 4'-00" 4'-00" 4'-00" 4'-00• a '-oo° .4'-00° Q a'-oo" •4'-00" • r 4'-00° 4'-00" 4'-00' 4'-00" �r. 4'-00" u 4'-00" 4'-00" 4'-00• 18 Wide 4'-00° 4'-00" 4'-00" 4'-00" 4'-00° „ `4'-00" h 4'-00" '4'-00" r 4'-00" 4'-00" 4'-00" 4'-00• 4--00- 4''- 00" 4' - 00" 4' - 00" 4'-00" 4'-00" 4'-00" -4'-00° 4-00" 4�-00" 4'-00" R '4'-00" * Indicates a configuration that will require the frame strap connected to the far beam (see Figure 72). June 1, 2015 64 Manufacturer's Installation Manual - June 2015 SIDEWALL VERTICAL ANCHORS Homes designed for Wind Zones II and III also require vertical tie -downs along the sidewalls. The vertical tie -down anchor straps (or brackets for connecting to the home) are factory installed and indicate the locations. Vertical and frame sidewall tie -downs shall connect to one double -headed anchor. Any factory -installed sidewall tie -down straps must be connected to a ground anchor regardless of the wind zone in which the home is placed. END WALL FRAME ANCHORS End wall frame tie -downs are especially important for homes that are wider and have higher roof pitches because those features increase the surface' area exposed to wind loads at the ends of the home. Use Table 25 to determine the number of end wall frame anchors required at the each end of each home section. TABLE 25. END WALL FRAME ANCHORS REQUIRED PER,HOME SECTION ON EACH END OF THE HOME MAXIMUM ROOF PITCH 4.35 / 12 END WALL VERTICAL ANCHORS End wall vertical anchors are not required. TAG UNIT FRAME ANCHORS (WIND ZONE I ONLY) Use sidewall anchor quantity on end walls and use end wall anchor quantity on side walls. TAG UNIT VERTICAL ANCHORS Tag unit vertical anchors are not required. PORCH POST ANCHORS Wind Zone I anchors not required. Wind Zone II and III anchors located at vertical straps. OFFSET UNIT ANCHORS Anchor same as single section home (Figure 8). STEP 2. DETERMINE TIE -DOWN CONFIGURATION There are two primary tie -down configurations: the near beam and the far beam methods. If the anchor spacing selected in the appropriate anchor table (Table 22, Table 23 or Ta- ble 24 has an asterisk (") then use the far beam method. Otherwise, use the near beam method (Figure 72). Each method varies by wind zone as described below. • Near beam method. For all Wind Zones, connect an anchor strap from the an- chor head to the beam closest to the anchor. In addition for Wind Zones II and III, connect a vertical strap from the sidewall of the home to the anchor head us- ing a double -headed anchor. • Far beam method. For Wind Zone I connect anchor straps from the anchor head (using a double -headed anchor) to both of the home's main frame beams. For Wind Zones II and III connect one anchor strap from the anchor head (using a double -headed anchor) to the home's far beam and one to the sidewall of the home. PHILLIP J. N0. 4 A 32035 m �N-nd En91�0 June 1, 2015 MANWA . M—UG YEAi1T„ U Y• Manufacturer's Installation Manual - June 2015 65 Naar Beam Floor FrameTI.Doam Floor Near Beam (Omd In Wand im Frame Zones II and I10 Tie -Down Vertical Si9 � 60' p7azimum Vertical Sidewall am Frame TieaDow (ro Be T,-Doom (7W,rt \ 1 Tie -Down (Wind7�70ro7mdLewelExceeds When NearBeam Strom Ang e Zone II and III \ Oround Level 00'As Indicated By r) On Om) I OOo�)sII and IIIr Charts) -Stabilizer Plate I Stabilizer Plate OroundAnchor 1' OroundAncnor STEP 3. SELECTIANCHORS Use the torque probe results from Prepare the Site, STEP 5. DETERMINE SOIL - BEARING CAPACITY ANDI FROST LINE (p. 12) and the anchor manufacturer instruc- tions; select the type and le nI gth of anchor to use. The installed ground anchor size (length) must be listed (i.e. approved) for the soil class. Make sure the anchor is of sufficient length such that the top of the helix is below the frost line. Select a shaft diameter sufficient to resist excessive torsion, "ring -off' (when the helix or anchor head separates from shaft) or shaft splitting. Consult the anchor supplier for guidance. Review all of STEP 4. INSTALL ANCHORS (p. 66) and STEP 5. INSTALL STRAPS (p. 68) before making final anchor selections to determine when single -headed vs. double -headed anchors should be used. Follow the specifications in Table 26 when se- lecting stabilizing system components. TABLE 26. ANCHOR MATERIALS SPECIFICATIONS Figure 72. Lateral tie -down con- figurations Anchors must be tested and listed to resist a minimum ultimate load of 4,725 Ibs and a minimum allowable working load of 3,150 Ibs or ultimate and corresponding working load limited by soil conditions and anchor length. The working load is the maximum load the designer can use. Ground anchors must be provided with protection against weather deterioration and corrosion at least equivalent to that provided by a coating of zinc on steel of not less than 0.30 oz per sq ft of surface coated. Straps must be minimum 1-1/4" x 0.035" zinc -coated (0.30 oz per sq ft) steel strapping conforming to Straps ASTM D3953-97, Type 1, Grade 1, Finish B with a minimum allowable working load capacity of 3,150 Ibs and a minimum ultimate load of 4,725 lbs. Slit or cut edges of zinc -coated strapping do not need to be zinc coated. The size and type of stabilizer plate, required by the ground anchor manufacturer, will be specified in the anchor manufacturer's instructions. Stabilizer plates must be provided with protection against weather Stabilizer plates deterioration and corrosion at least equivalent to that provided by a coating of zinc on steel of not less than 0.30 oz per sq ft of surface coated. Alternatively, ABS stabilizer plates may be used when listed and certi- fied for such use. (Minimum allowable working load of 2730 Ibs) STEP 4. INST Before beginning anch piers and frame memb utility companies to de and phone lines, and v chor locations. Also ch connecting exterior ligl FRAME ANCHORS Frame anchors shall LL ANCHORS installation, check for obstructions under the home such as that may interfere with the tie down strapping. Check with nine the location of underground utilities, such as electrical ar, sewer, and gas pipes that may be buried in potential an- < for homeowner -installed wires and pipes, such as those 0 or sheds to the home. These must also be avoided. installed against a stabilizer plate. Grading area around anchors. Anchor heads should not rest in sunken spots. Grade the ground so that water does not collect around anchor heads, but runs away from the anchor and out from under the home. Do not bury anchor heads. 66 I Manufacturer's Installation Manual - June 2015 PM Sidewall Frame Tie -Down Strap Ground Anchor with Stabilizer Plate Stabilizer Plate Configuration Stabilizer plate configurations Figure 73 are suitable for homes in all wind zones. An- chors may be installed after the home is set. A stabilizer device, typically an ABS or metal plate, is used to prevent the top of the anchor from slicing through the soil when the load is applied. Stabilizer plates are available in a variety of widths. Choose the widest plate that can be driven into the soil to maximize resistance to movement. The LAW may have stabilizer plate requirements. Install anchors with stabilizer plates as follows: 1. Locate anchor. Select a location for the anchor under the home but within four inches of the exterior wall Figure 74. Avoid locations that will interfere with skirting. 2. Install anchor. To assure that the anchor attachment point will end up at the stabilizer plate, start the anchor insertion approximately 12 inches back from the desired location if using a 48 inch long anchor, or approximately 16 inches if using a 60 inch long anchor. Install the anchor at about 15 degrees off verti- cal, with the head tilted away from the home. Install the anchor to a depth of approximately one half its length. 3. Drive stabilizer plate. Drive the stabilizer plate into the ground to its full depth at the point determined in Step 1. 4. Complete anchor installation. Screw the anchor the rest of the way into the ground. The finished anchor must be installed to its full depth. VERTICAL ANCHORS To install vertical anchors, screw the anchor into the ground directly under the strap at- tachment point on the home until the bottom of the anchor head is flush with the ground or no more than one inch above grade. STEP 5. INSTALL STRAPS Figure 73. Stabilizer plate configuration Figure 74. Determining an- chor and stabilizer plate loca- tion Soil depression. Do not locate anchor heads in soil depressions where water may pool. June 21)15 Manufacturer's Installation Manual -67 Follow the instructions below tb connect straps from the home to sidewall frame, end wall frame and vertical anchors. Always protect straps at sharp corners including around I -beams with radius clips or other methods (Figure 75). Radius clips may be fabricated from 26ga (min) by 1 '/4— inch wide galvanized steel strap formed to fit around corners. Longitudal Bracket Protect Top and Bottom of Beam if —I -Beam (V Strap is Wrapped Around Beam SPLICING STRAPS Splicing may be required when a pre-cut strap is of insufficient length. Splices in tie - down straps are not permitted in a 'Y' configuration. Overlap straps by 12 inches, ap- plying one splice clip from above and the other from below; use a crimping tool to tight- ly seal the splice clips (Figure 76). Do not run any portion of the splice through an an- chor head bolt. Apply Splice Clips In Direction of Arrows SIDEWALL FRAME Ah Install straps to sidewall 12" anchors as follows: Y Splice Not NO Permitted 1. Connect strap to home. Connect one end of the strap to the home connec- tion point usinglapproved buckles or clips (swivel or hook clip preferred). 1OWraplstraparound main 2O Connect hook totopof beam) main beam and connect other end of strap to anchor head. 2. Connect strap to anchor. Connect the other end of the strap to the split bolt in the anchor. Leave enough strap length to be able to make at least three, Figure 75. Radius clips Figure 76. Tie -down strap splice Figure 77. Strap to beam connection i ' // Strap to beam connection. Regardless of the strap suppli- er's recommendations, the strap must be connected to the top of the main beam to pre- vent damage to the structure. 68 I Manufacturer's Installation Manual - June 2015 �rau...cmneo eewun.mw- but no more than five complete turns around the bolt before it becomes tight (approximately 2 1/2 inches per turn or 7 1/2 to 13 inches total). Fewer than three turns and the strap may not hold onto the bolt when force is applied. Conversely, more than five turns may not fit within the U-channel of the an- chor head. Follow the procedure outlined in Figure 78. (P 0 0 OInsert the tension bolt into the qO place the strap through the slotted SO Using a 16/16" socket or open end anchor head and loosely attach shank of the tension bolt and bend wrench, rotate clockwise, wrapping the hex nut. plt g up to 90°. the strap around the tension bolt. OOnce tensioned to the point that O Once fully tensioned, align the If approved by the manufacturer, counterclockwise resistance square neck of the boltwith the double head anchors may be used appears, use a 5/8" open end square recess in the anchor head for both diagonal and vertical wrench to hold the square neck and tighten the hex nut. This will tie -down strap tensioning. Tension while repositioning the15116" draw the two togetherand bck the the diagonal tie -down strap first. tensioning wrench to continue system into final position. Follow Steps 3 through 7to install tensioning. Repeat as required. straps to anchorhead. 3. Pretension anchor. For anchors with stabilizer plates, pretension the anchor by pulling it up to the stabilizer plate using the strap and take-up bolt to move the anchor head. Continue pulling the strap until the plate moves a small amount (about 1/2 inch). This is called packing the plate and it will yield the strongest resistance (the bottom of the anchor head should be maximum 1/4 inch above the top of the stabilizer plate). END WALL FRAME ANCHORS Attach straps to the bracket welded by the manufacturer to the frame (Figure 79). If no brackets have been installed, use approved beam clamps designed specifically for this purpose, available from anchor suppliers. Connect straps to anchors following same procedure as for sidewall frame anchors. When more than one anchor per frame is re- quired, use swivel brackets and space anchors a minimum of 48 inches o.c. Figure 78. Procedure for connecting the strap to frame and anchor V&t Z Anchor head location. As the anchor is pulled up to meet the stabilizer plate, the head of the anchor will rise. In its final position, the bottom of the anchor head should be no more than 1/4 inch above the top of the stabilizer plate. No F—Im"T • • MANurneru�eoeeauri,uur- Manufacturer's Installation Manual - June 2015 69 Main Beam i Bracket Pier End Wall s," Tie Down Strap 45 t 5 Degrees Anchor with E11i1 l�iiil1 StabilizerPla STEP 6. TIGHTEN AND ADJUST STRAPS After all anchors have been installed and pre -tensioned, recheck all anchor straps to assure that they are tight apd that the anchor shafts have remained in contact with the stabilizer plates. Do not over -tension straps. Figure 79. End wall frame anchor attachment method 70 I Manufacturer's Installation Manual - June 2015 Connect Utilities This chapter contains procedures and requirements for the connection and testing of utility hook-ups. Responsibility for making utility connections varies by location. Consult the LAHJ and the utility before connecting the home to any utilities. STEP 1. CONNECT ELECTRICAL SERVICE The home is designed for connection to an electrical wiring system rated at 120/240 volt AC. All electrical field work must be done by a licensed electrician or other person approved by the LAHJ. FEEDER WIRE AND EQUIPMENT SIZES The current rating (in amperes) of the home can be found on the tag located on the outside next to the feeder or service entrance, and on the electrical distribution panel. Using this information, determine the required feeder wire size from Table 27. These sizes are based on an ambient temperature of 86 degrees Fahrenheit and do not take voltage drop into consideration. Acceptable conductor types are: RHH, RHW, RHW-2, THHN, THHW, THW, THW2, THWN, THWN-2, XHHW, XHHW-2, SE, USE, and USE-2. TABLE 27. ELECTRICAL FEEDER WIRE AND EQUIPMENT SIZES FOR COPPER CONDUCTORS Size ConductorsMinimum li[' .. Raceway Conduit Diameter R d I White (Neutral) (Grounding Green Bare Ground -. "r) NA 1 ;,' #4 AWG °; #8 AWG #8 100 70 10x10x4 1-1/4 #4 AWG #4 AWG #8 AWG #8 -o 200 s 140 8 --r- 10x16x4 --- 2 2/0 AWG S 1/0 AWG 3 #6 AWG ;; #4 225 158 10x16x4 2 3/0 AWG 2/0 AWG #4 AWG #4 400 280 1:'; 10x24x4 3 }j 400 kcmil i 300 kcmil {; #3 AWG v! 1/0 Z ZZ Special precautions when installing electrical ser- vice. Installation of the electric power to the home can cause exposure to live electrical circuits. Exposure to live electrical circuits or improper grounding of the conductor in the panel board may result in severe shock or possible electro- cution. A qualified installer must make the connections for the electric power. MANUFACTURED BEAUTIFULLY' Manufacturer's Installation Manual - June 2015 71 FEEDER CONNECTIONS Feeder connections are made from above or from below the home as follows: From above — mast weatherhead feeder The routing, connection, and support of the service drop must meet local codes. Homes equipped this way cdntain all necessary conduits to the electrical distribution panel. However, the feeder conductors (not provided with the home) are installed on site. If the masthead is located above the roof overhang, allow a minimum clearance of eight feet above all roof poll Its that the conductors pass over. There are two exceptions to this rule: (1) The vertical clearance may be reduced to three feet if the roof has a minimum slope of 4 in 12; aid (2) The vertical clearance may be reduced to 18 inches if no more than four feet of service -drop conductors pass above the roof overhang, and if they terminate at a through -the -roof raceway or approved support. A minimum clear- ance must also be provided from the final grade to the service -drop conductors. This measurement may vary fro 1 10 feet to 18 feet; depending on the types of traffic antici- pated below the service drop (refer to the NEC). Unless impractical, locate service heads above the point of attachment of the service -drop conductors and make them rain -tight. If individual conductors do not extend downward, form drip loops. From below — underside junction box feeder A section of conduit is factory installed through the floor cavity. Connect to that conduit with approved fittings and conduit (not provided with the home) to the point where the service entrance cable enters the crawl space. Install properly -sized service entrance conductors from the main �ower supply to the panel board. Depending on the location of the main panel board inside the home, or the point at which the service entrance conductors enter the craw space, a separate service disconnect may be required. Re- fer to Table 27 for the conductor and junction box requirements. The installer must provide the supply connection including the feeder conductors, junction box, and con- duit connectors. Protect conductors emerging from the ground from a minimum of 18 inches below grade to eight feet above grade, or to the point of entrance to the home. The distance measured f�om the top surface of a buried cable, conduit, or raceway to the finished grade must nl eet the minimum burial requirements outlined in the NEC. Use a moisture -proof bushing at the end of the conduit from which the buried cable emerges. GROUNDING The home must be properly grounded to protect the occupants. The only safe and ap- proved method of grounding the home is through an electrically -isolated grounding bar in the manufactured home distribution panel board. This grounds all non -current - carrying metal parts to the electrical system in the home at a single point. Each neutral conductor Must be connected to the system grounding conductor on the supply side of the main disconnect in accordance with Articles 250.24, 250.26, and 250.28 of the National Electrical Code, NFPA No. 70-2005. Where the meter base has a disconnect (typically when the meter is more than 6 feet from the service electric panel, although this may vary by LAHJ) the ground and neutral should be bonded at that disconnect and then grounded to the driven earth ground. Four wires willlleave the service electric panel to the disconnect. Three wires will enter the disconnect from the meter base (refer to Figure 80). Where there is no disconnect on the meter base or between the meter base and ser- vice electric panel (typ'cally when the meter is within 6 feet from the service electric panel, although this may vary by LAHJ), the main circuit breaker in the service electric panel becomes the first disconnect. In this case, the neutral and ground are bonded in the service electric panel and connected to the driven earth ground from the service electric panel. Three 7ires lead between the meter base and the service electric panel (refer to Figure 81) i , // Power supply. A large enough power supply must be available at the site. An inadequate power supply may result in improper op- eration of and possible damage to motors and ap- pliances. It may also in- crease electricity costs. i ' // Grounding the electrical system. Do not provide electrical power until the grounding electrode is in- stalled and connected. When the meter base is not on the house never use the neutral conductor of the feeder cable as a ground wire. • 72 Manufacturer's Installation Manual - June 2015 Ground Bus Bar Grounding Lug To Chassis Metallic Conduit Or Fittings To Be Effectively Grounded To Equipment Ground — Ground Bus Bar Grounding Lug To Chassis To Grounding Rod Metallic Conduit Or Fittings To Be Effectively Grounded To Equipment Ground — Service Entry Main Panel (May Be Above Or Below Ground) Enclosure f-2' Conduft To Neutral Service Head Bus Bar Meter UutilityCompann y Meter Enclosure Bonding Strap Not Installed Disconnect 2' Conduit (Fused)—� Installed at Factory To Main Black -'HOT° To A Or B Red - °HOT' To A Or B White To Neutral Bus Bar Ground To Equipment Ground Ground From Disconnect ,2' Conduit To Grounding Rod Main Panel Service Entry Enclosure (Above Or Below Ground) 2'ConduitTo Neutral Service Head Bus Bar Meter By UtllltyCompany t2- Meter EnclosureBonding Strap Not Installed Conduit 2' Conduit � 'Installed at Factory To Main —Panel Black - °HOT° To A Or S Red - •HOT' To A Or B White To Neutral Bus Bar In all cases, a grounding electrode conductor and a ground wire must be installed ac- cording to the following specifications: 1. Grounding wire to be per Table 27 provided by the manufacturer. If manufacturer provides a minimum 1/2 inch EMT or conduit raceway, the #6 minimum bare cop- per wire is provided by the retailer for installation. 2. The clamp connecting the grounding wire to the electrode shall be suitable for di- rect burial and located flush or below ground level. 3. Use a listed 5/8 inch diameter by eight foot long iron electrode or nonferrous rod of at least 1/2 inch diameter by eight feet long for grounding (larger sizes may be re- quired by the LAHJ due to soil impedance). 4. Drive the electrode to a depth of not less than eight feet so that at least eight feet of the electrode is in contact with the soil. 5. When rock is encountered, the electrode may be driven at an angle not to exceed 45 degrees from vertical or buried in a trench that is at least 2-1/2 feet deep. FIELD INSTALLED METER BASE When a meter base is installed in the field, Figure 82 and the following requirements must be adhered to: • Install the meter base according to the manufacturer's instructions. • Use straps to support any conduit. Do not use the meter base equipment for support. • Use exterior equipment and enclosures listed as weatherproof and entrance conductors listed for wet locations. Figure 80. Electrical feeder connection when meter has a disconnect installed (typi- cally more than 6 feet from service electric panel). Figure 81. Meterbase wiring when there is no separate disconnect installed (typically within 6 feet of service elec- tric panel). MANUTACTUXID SEAUTIrUIkV- Manufacturer's Installation Manual - June 2015 73 • The grounding bar es of testing the el • The grounding bar attached, after the • Check with the loc cations and distani • The field installed its listing. Fasten $ tight seal. I • Check the local cc l base. STEP 2. CONI CONNECTION To connect the home's ed under the home (us follow the procedure d 1. Flush pipe. F tion to the ho i 2. Clean thread 3. Install press stall a pressd 4. Connect vall the inlet on t� jacent to thel valve. To pre siphon valve lay be installed separate from the neutral bar for purpos- trical system. lay be isolated during the electrical check and re- sts are completed. electrical utility to verify meter base requirements and lo- s for the main panel and meter box. :ter base enclosure must be installed in accordance with surely to exterior wall studs and provide for a weather - for any requirements regarding the location of the meter Exterior Wall Meter Encbsure 1/4" Air Space Between Meter Enclosure And Exterior Wall ECT WATER SERVICE water system to the water source, identify the water inlet locat- ually below the water heater compartment or utility room) and escribed below (refer to Figure 83): lush field -installed water piping free of all debris prior to connec- me's water inlet. s. Ensure that pipe threads are clean. ure-reducing valve. If the local water supply exceeds 80 psi in - re -reducing valve. ve. Install a main shut-off valve between the water supply and e home. Locate the riser for the shutoff valve underneath or ad - home. Select a full flow gate or ball shutoff valve, or equivalent vent the possibility of fresh water contamination install an anti - on all field installed exterior faucets. Figure 82. Meter base clearances. Maximum water pressure. The water system for the home was designed for a maximum inlet pressure of 80 psi. 74 I Manufacturer's Installation Manual - June 2015 Water Pipe Optional Hose Bib (Not Supplied) Connect To T N96K — �li-------------' . Here For Water System Test Service Connection (Not Supplied) Locate Water Riser Underneath or - j Mandatory Shut -Off Adjacent to Home j Valve (Not Supplied) 5. Install water heater discharge drain. Inspect the drain opening on the water heater to ensure that it is clear of any obstruction. If the home is to be installed on a basement or enclosed crawlspace, install drain pipe connecting the dis- charge from the water heater temperature and pressure relief valve to the out- side or to a sump. 6. Install water heater drip pan drain. Assure that the drain for the water heat- er drip pan does not terminate under the home. Using the materials provided and the accompanying instructions run a drain line from the water heater drip pan through the wall or floor to the exterior of the crawl space. Terminate the line between six and 24 inches above grade. (Figure 84). Make the termina- tion point rodent proof. 7. Insulate. In areas subject to freezing temperatures, protect with insulation or heat tape pipes, valves and pressure reducers that are exposed to the outdoors; and pipes in water heater compartments with non -insulated doors. Connect heat tape to the electrical outlet under the home near the water supply inlet. Figure 83. Water system connection Using check valves. Install a check valve on the water inlet to prevent water system drainage in the event of a loss of water pressure from the source. Such pressure loss could cause the water heater to drain, exposing the heating elements of electric water heaters caus- ing them to fail. Figure 84. Water heater drip pan and drain i ' ,Z Selecting heat tape. Use only pipe -heating cable (tape) listed for manufac- tured homes, and install it in accordance with the ca- ble (tape) manufacturer in- stallation instructions. Testing water lines. Only use pneumatic (air) testing when hydrostatic testing is not practical. Air under pressure is explosive. Ex- ercise extreme caution and notify all site personnel of • MANUFACTURED 6EAUTiruur- Manufacturer's Installation Manual - June 2015 75 TESTING the test. Wear protective After testing the electrical ystem and connecting the water lines check the water sys- eyewear and take precau- tions to prevent impact tem for leaks using one of he procedures described below. Before testing, close all damage to the system water faucets, spigots, an toilet -tank float valves. while the test is in progress. Hydrostatic (preferred): I Do not pneumatically test 1. Fill water heater. Confirm that the water heater tank is full of water. 2. Pressurize systConnect a hydrostatic valve, and gauge to the lo- CPVC systems. Pneumati- sally test Flow Guard Gold em. pump, cation shown in Figure 83. Pressurize the system with water at 100 psi, and systems only at low r les- sure levels (20 psi or less). then isolate it frog the pressure source. Bleed all air from the highest and far- Pressurizing water lines. thest points in the system. P Y When pressurizing the wa- 3. Hold pressure. f Monitor the pressure for at least 15 minutes. ter system, connect the 4. Fix leaks. If the ressure drops below 100 psi, locate and correct any leaks pump to a location above a by cutting out aqd discarding bad pipe sections or joints and installing new closed shut-off valve so as pipe or joints with couplings. not to introduce pressure 5. Repeat. Repeat the test until all leaks have been eliminated. into the municipal water supply. Pneumatic: Toilet -Tank Water Level. 1. Bypass water _seater. Bypass the hot water heater by disconnecting the hot Adjust toilet tank water lev- outlet and cold inlet water lines from the water heater and joining them to- el to level indicated using gether. This willl protect the hot water tank from damage and protect those in- the water level adjustment volved in the test from possible injury. screw located on the toilet 2. Pressurize system. Connect an air pump and pressure gauge to the water tank float valve. inlet, pressurize the system to 100 psi and isolate the pressure source from the system. 3. Hold pressures Monitor the pressure for least 15 minutes. If the pressure i /, drops below 100 psi, locate any leaks by applying soapy water to the connec- tions and Iooki i g for bubbles. Anti -Scald Valves. Anti- 4. Fix leaks. Correct any leaks by cutting out and discarding bad pipe sections Scald valves have been in - or joints and;intailing new pipe or joints with couplings. stalled on all tubs, 5. Retest. Repeat the procedure until all leaks have been eliminated. tub/showers and showers in the home. The 6. Restore connections. Reconnect the water heater and the water supply. valves are preset by the valve manu- FREEZE PROTECTION FOR UNOCCUPIED HOMES facturer to about 105°F (41 °C). After the water lines If the home is to be left unheated in cold weather, protect water lines from freezing as have been flushed, the out- follows: let temperature at each tub, 1. Disconnect s pply. Turn off the water supply and disconnect the water sup- tub/shower and shower ply inlet. I must be tested to ensure 2. Drain water I?eater. Turn off the water heater; if necessary, attach a hose to that it does not exceed the valve to d'rect water away from under the home, open the drain valve and 120°F(49°C). Water should drain the tan completely. completely. run for at least one minute 3. Drain faucets. Open all faucets throughout the home (including the laundry area if plumb�d, and any exterior faucets) and let them drain completely. on the hottest setting be- fore taking the temperature 4. Drain toilets Flush toilets and drain water tanks completely. t faucets the of one. reading. Some customers may desire temperatures °C). 5. Close faucets. Close all water with exception higher than 105°F (41 6. Connect compressor. Connect a maximum of 30 psi air supply to the water Temperature may be ad - inlet connection using a low pressure compressor. justed using the instructions 7. Open faucets. With the air supply on the system, open one faucet at a time provided with the valve. In throughout tf a home. no case should the temper- Disconnect (compressor. After the entire system has been drained of all water, ature8. exceed suit i serious as this may result in serious disconnect te air supply and close the water inlet valve. bodily harm and/or death. 9. Pour antifreeze. Pour an antifreeze solution into all drain traps, including Valve instructions can be sinks, tubs, nd toilets. Be sure that the antifreeze is safe for the fixtures and found in the HomeOwners P-traps. manual. STEP 3. CO NECT GAS SERVICE i /Z CONNECTION If the home uses nat ral or liquid petroleum gas (LPG, also known as propane) for water Installing gas lines. Only qu or space heating, co king or other appliances, follow the procedure described below: ified professionals may con- nect and test gas service. 76 Manufacturer's Installation Manual - June 2015 M�wurwmueen ee�unruuv- 1. Inspect vents. Assure that all exhaust vents on gas -fired' equipment are se- curely connected and that roof jacks and stacks have not come loose during transit and they are properly installed. 2. Review appliance instructions. Review each appliance manufacturer's in- structions before the home is connected to the gas supply. Most gas appli- ances are typically configured to operate on natural gas. If the gas supply will be LPG, consult the appliance manufacturer's instructions to determine what changes need to be made. For homes located above 3,000 feet, appliances may require a different orifice. 3. Remove cap. Remove the protective cap from home inlet pipe and install a full flow shut-off valve at the supply inlet (Figure 85). 4. Install regulator. The gas piping system is designed for a pressure that is at least seven inches of water column (4 oz. per sq in or 0.25 psi) but not more than 14 inches of water column (8 oz. per sq in or 0.5 psi). If gas from any supply source exceeds, or could exceed this pressure, install a regulator if re- quired by the LAHJ. 5. Connect supply. Using matching threaded fittings, connect the gas supply to the inlet side of the shut-off valve. 6. Close valves. Close all valves at appliances prior to opening the main supply valve. Full Flow Shutoff Valve Required (Supplied By Others) Source of Gas TESTING Union (Supplied By Others) Test the gas piping system in the following two ways: 1) piping only and 2) entire sys- tem. Consult with the LAW for any additional testing or start-up requirements. Before testing is begun, the temperature of the ambient air and the piping should be approximately the same. Conduct the tests when and where air temperatures will re- main constant. Piping only test (all appliances isolated) 1. Isolate appliances. Isolate all appliances from the system by closing all ap- pliance shut-off valves. 2. Attach gauge. Attach to the home's gas inlet a mercury manometer or slope gauge calibrated in increments of not more than 1/10 lb. 3. Pressurize system. Using an air compressor, pressurize the system with compressed air to three psi and isolate the pressure source from the system. 4. Monitor pressure. Monitor the pressure for at least 10 minutes. 5. Check for leaks. If pressure drops below three psi, check for leaks by apply- ing a non -corrosive, ammonia -free gas leak detection fluid to the joints at all valves, appliance connections, and crossover connections (do not use dish washing detergents, soap, or other household chemicals). If bubbles form, tighten the connection and recheck. 6. Repair leaks. If leaks persist, replace defective pipes or fittings with sound material and retest. 7. Release pressure. Release pressure and open all appliance shut-off valves. 8. Rinse connections. Thoroughly rinse all tested connections with water to remove leak detection fluid. Figure 85. Gas service con- nection Fill gas water heaters. Be- fore lighting the pilot on a gas powered water heater, fill the tank with water. Fail- ure to do so could damage the water heater. • • Manufacturer's Installation Manual - June 2015 77 Entire system test (with 1. Close appliance cording to the ini 2. Open valves. A; open position. 3. Attach gauge. F ounces. I 4. Pressurize sys1 ounces (3/8 to 1f 5. Check for leaks only test. Rep la� 6. Rinse connectu remove leak dell Close all gas equipment controls and pilot light valves ac- dual gas equipment manufacturer's instructions. re that gas shut-off valves for all gas equipment are in the to the home's gas inlet a pressure gauge calibrated in m. Pressurize the system with compressed air to six to eight psi, or 10 to 14 inches of water column). Check for leaks as described above in step 4 of the Piping defective pipes or fittings with sound material and re -test. ns. Thoroughly rinse all tested connections with water to ;tion fluid. GAS APPLIANCE START-UP Open the shut-off valve for each appliance and adjust the burners according to the appli- ance manufacturer's instructions. Verify that the furnace and water heater thermostats are operating properly, a�d set them to the desired temperatures. STEP 4. CONNECT OIL SERVICE Homes that are equipped with oil burning furnaces must have oil supply piping installed and tested on site by a qualified professional in accordance with NFPA 31, Standard for the Installation of Oil Burning Equipment, 2001 or the requirements of the LAHJ, which- ever is more stringent. The home manufacturer does not supply oil piping or tanks. OIL CONNECTION Consult the furnace manufacturer's instructions for proper pipe -sizing and installation procedures. Where piping is run through the bottom of the home, ensure all holes in the bottom board are sealed tight with foam, mastic, and/or tape specially made for that purpose and made ro ent proof. When equipping the h me with an oil storage tank, comply with the following: • Install the pnine with a gradual slope toward the fill end or drain plug (if so equipped) ;to �facilitate pumping or draining of water and sludge. • Provide a re�dily accessible approved manual shut-off valve at the outlet, in- stalled to close against the supply. • Equip the.tal k with an approved oil filter or strainer located downstream from the tank shy t-off valve. Use a filter or strainer containing a sump with a drain to trap water. • Equip under ground tanks with a filler neck extending one foot above grade and a minimum 1-1/4 inch diameter vent pipe extending at least two feet above grade. • Locate the tank to be accessible for service and inspection, and safe from fire and other hazards. • If the tank is located inside a compartment of the home, provide ventilation at the bottom lof the compartment to permit diffusion of vapors. If the tank is fixed to the l home, provide for filling and draining from the outside. • Insulate interior tanks from the structural members of the home. Provide tanks so installe6 with an outside fill and vent pipe and an approved liquid level gauge. • Install tanks that feed vaporizing type oil furnaces so that oil flows by gravity. To achieve efficient gravity flow, make sure that the bottom of the tank is at least 18 inches above the furnace oil control level. • Tanks forlgun type oil furnaces (these furnaces include a fuel pump) may be installed above or below ground. OIL SYSTEM TESTING Before operating t'Je system, fill the tank to capacity with the fuel to be burned and visual - Iv check all ioints in the system for leakage. Replace (do not repair) parts that leak. V&IOZ Testing oil tanks. All oil storage tank and piping in- stallations and tests must meet all applicable local regulations and should be made only by experienced, qualified personnel. W"MMMUM 78 I Manufacturer's Installation Manual - June 2015 ZAr=3•rrr:s-1• Prepare Appliances and Equipment This chapter provides instructions for installing and/or preparing appliances and other equipment. While the items below can be completed in any order, the last item, CONDUCT ELECTRICAL TEST, must be done last. INSTALL AIR CONDITIONER OR HEAT PUMP (p. 79) PREPARE HEATING SYSTEM (p. 80) INSTALL REMOTE HEATING AND COOLING EQUIPMENT (p. 80) PREPARE VENTILATION SYSTEM (p. 81) PREPARE FUEL -BURNING WATER HEATER (p. 81) INSTALL EVAPORATIVE COOLER (p. 82) PREPARE CLOTHES DRYER (p. 83) PREPARE SMOKE ALARMS (p. 84) PREPARE FIREPLACES (p. 84) PREPARE KITCHEN AND BATH APPLIANCES / FIXTURES (p. 86) INSTALL EXTERIOR LIGHTING (p. 87) INSTALL CEILING FANS AND LIGHTING (p. 87) TEST ELECTRICAL SYSTEM (p. 88) INSTALL AIR CONDITIONER OR HEAT PUMP (if applicable) CENTRAL UNITS Install split system or unitary central air conditioners and/or heat pumps as follows: 1. Check suitability. Check the home's Comfort Cooling Certificate (may be includ- ed with the data plate) to confirm that the home is suitable for installation of cen- tral air. If so, note the air distribution system's rated duct capacity (BTU/hr), any equipment sizing guidance provided by the manufacturer and information provid- ed to calculate the home's heat gain. 2. Select equipment. Select equipment with a rated heating capacity (BTU/hr) not exceeding the maximum indicated on the home's data plate and a rated cooling capacity sized in accordance with Chapter 28 of the 1997 ASHRAE Handbook of Fundamentals or ACCA Manual J, Residential Cooling Load, 8th edition. Infor- mation needed to calculate the home's heat gain can be found on the home's comfort cooling certificate. Choose equipment with a minimum circuit amperage (found on the equipment rating plate) no greater than the branch circuit rating of the exterior air conditioning receptacle (indicated on the adjacent tag), if present. 3. Install A -coil. When installing a cooling A -coil in a down -flow furnace that incorpo- rates a fresh air intake duct, position the duct in the furnace cavity according to the furnace manufacturer's instructions (Figure 86). For electric down -flow fur- naces, trim the ventilation duct as needed to allow installation of the A -coil and secure the duct to the wall of the compartment or to the top of the A -coil. Do not restrict the flex duct opening; allow the duct insulation to contact the A -coil, or al- low the duct to become kinked, restricted, or configured to form a trap. Z&V OFZZ Use listed appliances. All appli- cable appliances must be listed or certified by a nationally recognized testing agency for the application for which the unit is intended and installed in accordance with the terms of its listing or certification. Properly sizing equipment. Oversized cooling equipment can lower energy efficiency, reduce comfort, shorten equipment life, and may cause moisture prob- lems in the home (including po- tentially damaging the home's structure). Sizing guidance is pro- vided by the Manufactured Hous- ing Research Alliance Cooling Equipment Sizing Guidelines available at www.mhrahome.org. MANUFACTURED BEAUTIFULLY' Manufacturer's Installation Manual - June 2015 79 I "Whole House Ventilation' Flex Dud A -Coll Furnace l vl Cabinetl- I Fumaca PREPARE HEATING SYSTEM If the home does not conta'n a factory installed heating appliance, install a remote heating appliance according to INSTALL REMOTE HEATING AND COOLING EQUIPMENT, p.80. Prepae fuel -burning heating systems included with the home as follows: 1. Inspect for damal manufacturer. 2. High altitude. If th indicated in the fur each 1,000 feet at; some jurisdictions, 3. Convert for LPG I from natural gas;tc (if required by the 1 4. Install intake air F maximum allowab, ative to expected acceptable materi 5. Install flue. For, cc sembly as describe INSTALL REMC Install remote units in in this chapter above 1. Locate connec labels, or tags i. ply and return supply duct locl registers forwai center of the he 2. Install ducts. li tween the remc the instructions 3. Install damper stalled furnace, system, and be warm air in hea sa. Inspect the furnace and report any damage to the home home is located more than 2,000 feet above sea level or as lace manufacturer's instructions, derate gas furnaces 4% for we sea level. This work must be done by a qualified (and in licensed) technician. as. If LPG gas (propane) will be used, convert the appliance LPG gas use. Conversion must be made by a qualified and AHJ) licensed technician. ipe. Consult the appliance manufacturer's instructions for pipe run length, requirements for air dampers, locations rel- iow levels (check with the LAHJ for expected snow levels), s, pipe supports, and pipe termination requirements. nbustion appliances, install the flue roof cap and stack as- d in PREPARE FIREPLACES, Chimneys (p.84). iE HEATING AND COOLING EQUIPMENT mpliance with all heating and cooling equipment requirements d the following: ons to. the home. Find the manufacturer -installed connectors, der the home indicating the required connection points for sup - If connectors are not provided nor location indicated, select a on such that there are approximately equal numbers of supply and rear of the connection point. Locate the return duct in the :all the appropriate supply and return ducts (not provided) be - unit and the home (Figure 88) making connections according to r crossover ducts in Crossover Connections (p. 49). If installing a remote cooling unit in a home with a factory in- stall dampers between the furnace and the home's air duct Ben the remote unit and the home's air duct system to prevent g mode from escaping to the remote cooling unit and vice ver- Figure 86. Whole house ventilation flex duct in an electric down -flow furnace. From left to right: as pre- pared in the factory, • proper installation with A -coil, im- proper installation with A -coil // &* Selecting A -coils. Use only A -coil units compatible and listed for use with the fur- nace in the home and in- stalled in accordance with the furnace manufacturer's instructions. Installing flue stacks with a hinged roof. If flue stack components are installed above the finish roof line (as is often the case with hinged roofs), an Alterna- tive Construction letter is required along with a fol- low-up inspection. Contact the factory for guidance. Venting appliances to the outside. Vent to the exteri- or of the home all combus- tion appliances except ranges and ovens. Selecting ducts. Exterior ductwork for remote units must be provided by the in- staller or HVAC contractor. Ducts must be approved for exterior installation and should be wrapped with in- sulation of at least R-8 un- der a vapor barrier with a perm rating of not greater than one. (For ENERGY STAR homes, the R-value must be at least that speci- fied on the manufacturer's ENERGY STAR Site Instal- lation Checklist —generally a minimum of R-8.) 80 1 Manufacturer's Installation Manual - June 2015 �1'J�\ �41'd��• Home 4. Connect wiring. Install a thermostat containing a fan switch. Connect utilities in accordance with all manufacturer's instructions and local codes. 5. Seal penetrations. Repair or replace all floor insulation disturbed during the duct installation and seal holes in the bottom board using foam, mastic, or tape specially made for that purpose. Air Conditioning or Heating Equipment Supply Marriage SUP Retu Duct Line Duct l Duct Support Straps at upport Block 48" in. O.C. Minimum Minimum Clearance Between Ducts and Ground tobe4in. PREPARE VENTILATION SYSTEM Prepare the whole -house ventilation system according to the ventilation system manufac- turer's instructions. Confirm that any fresh air intake ducts extend to the exterior and do not draw air from the crawlspace under the home. Do not allow any fresh air ventilation intake ducts to become kinked or restricted, forming a trap (Figure 86). PREPARE FUEL -BURNING WATER HEATER The water heater discharge and drip pan drains should have been installed in Connect Utilities (p.75). In homes with direct -vent water heaters (that utilize gas, oil, or other combustion fuel), and where the water heater is not independently vented to the exterior through a grilled opening, provide combustion air from under the floor using pipe and cement acceptable to the appliance manufacturer or through the roof via a double -walled flue pipe. If provid- ed through the floor, run the air piping to the exterior of the home, with supports spaced every 3-1/2 feet o.c. or less. Terminate the pipe facing downward a minimum of 12 inches above the ground surface and provide a screen on the pipe vent cap. Figure 87. Remote unit damper locations Figure 88. Ducts connecting exterior heating and/or cool- ing equipment to the home ' /A Choosing pipe lengths. The appliance manufacturer may designate the length of the pipe run based on the pipe di- ameter and the number of turns in the pipe run. MANUrACrURro BEManufacturer's Installation Manual - June 2015 81 INSTALL EVAPORATIVE COOLER OPTION Install evaporative coolers (alsolknown as swamp coolers) as follows: 1. Check suitability. Chi with the data plate) to ( evaporative cooler and facturer. Only install a with a platform and ele, 2. Select equipment. Se the unit will be roof moi cluding water) of 220 It 3. Install. To install the unit, follow the manufacturer's instructions complying with the requirements of the cooler's listing, all applicable local jurisdiction regulations and the requirements in this manual, whichever is more restrictive. I cooler. To eliminate potential leaks with roof -mounted :s over the side of the home and attach them to roof truss the roof itself. Do not attach guy wires to roof vents, flues, or from the roof. r roof -mounted units, install ceiling discharge grills no closer smoke alarm. For ground -mounted units, install ducts below the exception of vertical risers into registers. Follow all ap- t installation instructions (Connect Crossovers, STEP 1. 49) when installing an under floor duct system to make 4. Secure roof-mou coolers, route guy edge rails, rather t other items protrui 5. Install air supply. I than three feet from the bottom board, w plicable crossover d CONNECT DUCTS, ducts airtight. 6. Seal penetrations. �o prevent water and air leakage into the home, take the follow- ing steps: For roof mounted units, seal all fastener penetrations, roof penetrations and the boot connecting the cooler to the roof opening. For ground -mounted coolers, seal the bottom boar�d where it is penetrated by vertical risers using foam, mastic Y made for that purpose. ply. Connect the cooler to an external water supply and attach the accumulation pan. Route overflow water away from the ck the home's Comfort Cooling Certificate (may be included infirm that the home is suitable for the installation of an f so, any equipment sizing guidance provided by the manu- oof mounted unit if the manufacturer has provided the home trical supply intended for this use. ,act a unit with a maximum blower capacity of 500 CFM. If nted, choose one with a maximum operational weight (in- and/or tape special) 7. Connect water su an overflow hose t home. 8. Connect wiring. Using wire nuts, connect the wires from a junction box (Figure 89) to the cooler'ar�d replace the cover on the box. Install coolers rated at 16 AMPS on a 20 AMP circuit and coolers rated at 12 AMPS max on a 15 AMP max circuit. Use one J ction box per cooler and the following color codes for assigning wires: ■ White = Neutral • Yellow = Pump ■ Black = Low Fan • Red — High Fan • Gre n = Ground 0 0 0 0 0 0 0 0 0 o p 0 0 0 0 0 0 0 0 0 0 o o Figure 89. Roof mounted junction box I WOUNWIVETIM • 82 Manufacturer's Installation Manual - June 2015 MANUTACTURlD Rl AUTITUItY` PREPARE CLOTHES DRYER V&Irzzj DRYER VENTS Venting exhaust systems. If the home includes a clothes dryer, the components for ventilating the dryer are included Exhaust vents must extend with the home (but not necessarily installed) and a vent opening has been roughed in either to the home's exterior in the wall or floor. (if a dryer is not installed, seal all dryer vent openings). through skirting. Termination of the dryer exhaust under - Run the dryer vent to the outside through the exterior wall or through the floor to a point neath the home can cause beyond the perimeter of the home, using materials approved by the clothes dryer manufac- condensation and moisture turer (see Figure 90). damage to the home. Lint and dust accumulation can ignite, causing a fire. The exhaust system must not contain reverse slope. Vent Below Floor Vent Through Exterior Wall Elbow With Clampto Rigid Duct Vent Cap igid or Flex Duct Clamp to Dryer Exterior Connection Wall Figure 90. Clothes dryer Dryer Vent ventilation ductwork through Cap floor (left) or exterior wall (right) Clampfo Seal Botlorn Vent Cap Board Clamp to Dryer Elbow With Connection Dryer Vent Rigid Duct Cap Support Strap Rigid or Flex Duct Wood Frame Secured to Bottom of RimRateor Install Through Skirting Install the vent as follows: 1. Remove temporary caps. Remove any temporary seals and duct caps from VA , /, the vent rough openings. Avoid damaging structural elements. Do not cut or 2. Install ductwork. Install ductwork using clamps (do not use screws or other otherwise damage structur- fasteners that penetrate into the duct) and support the duct with metal straps al elements such as floor connected to the floor joists or chassis at two feet o.c. or less. Ensure duct joists or wall studs for the connections are internally overlapped to prevent inhibiting the flow of air and installation of the dryer ex - thereby causing lint accumulation. haust system. Gas. Ventilation components 3. Install cap and damper. Install an approved dryer vent cap with damper on that may be included with the exterior termination of the duct. If the vent terminates at skirting, secure the home for an electric the cap to framing or skirting with sheet metal screws and seal edges with dryer may not be accepta- caulk or sealant. If the vent terminates through a wall, apply a bead of sealant ble for gas dryers. Consult to the back of the cap around the opening and secure with sheet metal screws the gas dryer manufacturer to metal, hardboard or fiber cement siding or with wood screws to a mount instructions. block for vinyl siding. 4. Seal opening. Seal openings inside and outside of the home including at the floor, interior walls, siding and skirting (with caulk), and at the bottom board using foam, mastic and/or tape specially made for that purpose. Installing ducts. GAS DRYERS Keep ductwork straight and smooth as possible without If the home was not fitted for a gas dryer, installing one requires substantial alteration excess slack. Slope it to the home. Gas supply piping and adequate venting must be provided as specified by slightly downward towards the dryer manufacturer and installed by a trained professional. Do not cut major struc- the exterior to facilitate tural elements to accommodate a gas dryer. moisture drainage. WOMMMAIN• „�„or�croaec ee�uri�uuv Manufacturer's Installation Manual - June 2015 83 PREPARE SMOKE The home has several factoy installed smoke alarms that are wired to a 120-volt cir- cuit. If the home was designdd for placement on a basement, an additional alarm is provided for installation at a pre -wired location under the home. Connect the basement smoke alarm and test all alarms as follows: 1. Check circuit. Ensure that electrical power to the home is activated and that the smoke alarm circuit is on. 2. Remove batteries�Make sure backup batteries (if any) are removed from all smoke alarms. 3. Test alarms. Press the test button on each alarm sequentially. All alarms should sound simultaneously when the test button on any one smoke alarm is pressed. Replace (with the same brand as those installed elsewhere in the home) any alarms lthat do not sound and retest. 4. Replace batteries. After successful test, replace the backup batteries, dis- carding the protective tabs. PREPARE FIREPLACES Install chimneys, chimney flashing and roofing, fireplace combustion air inlets, and hearths according to the manufacturer's instructions and the procedures described be- low. CHIMNEYS Fireplace and wood stoves may require on -site installation of additional sections of ap- proved chimney pipe, a spark arrestor, and a rain cap assembly. Follow the manufac- turer's instructions and the procedures described below: 1. Remove coverings. Remove protective materials covering the roof flashing and any foreign material from the installed part of the chimney. 2. Install chimnepipe. Assemble and seal the chimney per the fireplace or wood stove manufacturer's installation instructions and if there is a conflict be- tween the instructions and the figure, follow the instructions. To assure suffi- cient draft for ;proper operation, extend the chimney at least three feet above the highest point where it penetrates the roof and at least two feet higher than any surface within 10 feet of the chimney (Figure 92). Use additional sec- tions) of chimney pipe (not provided) if required by, local code or if the site has obstructions within 10 feet of the chimney. 84 Manufacturer's Installation Manual - June 2015 CHAMPION F—R ool Top Asserdy Above nZ Levd —L Less Than 10' I 12'Min. 3. Install shingles. Install shingles up to the edge of the flue cut-out in the roof deck. Secure shingles installed under the roof flashing with asphalt cement. 4. Install flashing. Place flashing over pipe section and shingles and set in as- phalt cement. Secure flashing to roof deck at top two corners with roofing nails. 5. Complete shingles. Cut shingles in successive courses to fit around the pipe and embed them in asphalt cement where they overlap the flashing. Secure shingles with roofing nails through flashing and apply asphalt cement over nail heads. The completed installation should appear as shown in Figure 93, with the lower part of the flange overlapping the lower shingles and the side and upper shingles overlapping the flange. Figure 91. Chimney and combustion air intake duct installation i 1 / A Selecting the appropriate flue. Wood fireplaces use larger diameter flues than gas fireplaces. Make sure flue matches the appliance type. Gas fireplaces cannot burn wood because the flue is too small and smoke will back up into the home. If wood fireplaces are con- verted to gas the flue will be too large resulting in ex- cessive heat loss through the chimney. Figure 92. Chimney clear- ance Manufacturer's Installation Manual - June 2015 85 Push Down Storm Collar Upper and Side Roof Shingles Shingles Overlap Flange and Are Set In Flange Asphalt Cement IFlue Pipe Lower Part of Flange ;" Trim with Sheet Metal Overlaps Lower Shingle Sheers If Difficult ITo Make Flashing Lay FlatIOn Roof COMBUSTION AIR INLETS Combustion air inlets provide combustion air through the floor or an exterior wall to a combustion appliance. If through an exterior wall, site installation is not required. If through the floor, extend thle duct from its point just below the floor to the outside (addi- tional duct material required for this shall be provided with the home). Locate the inlet damper above expected show levels (contact the LAHJ for snow levels). Follow the fireplace manufacturer's instructions (typically in the fireplace/stove or with the chimney parts). HEARTHS If shipped loose, install the fireplace hearth according to the fireplace manufacturer's instructions. PREPARE KITCHEN AND BATH APPLIANCES / FIXTURES Install kitchen and bath appliances according to the manufacturer's instructions and the procedures described fglr each appliance below. COOKING APPLIANCES If the home is provided with a range, cook top and/or grill containing its own exhaust system that penetrates Ithe floor, complete the exhaust system as follows: 1. Remove cove s. Remove the cover on the factory -installed exhaust pipe pro- truding from' b neath the floor near the appliance. 2. Install termination fitting. Secure the provided termination fitting at the outside edge of the'flJoor. 3. Install duct. Use the provided flexible metallic duct to connect the elbow pro- truding from the floor and the termination fitting. Refer to the manufacturer's installation instructions for guidance on supporting the duct and making the connections.] SITE -INSTALLED GAS APPLIANCES Install only appliances with a Btu capacity equivalent to or less than the capacity of the factory -installed piping and at the location of a factory -installed gas riser. REFRIGERATOR Prepare the refrigerator as follows: • Remove straps, blocks, or other securement devices used for shipping and patch any resulting marks on floors or walls. • If the refrigerator has an icemaker, check water lines for leaks upon installa- tion and aI�ew days later to make sure no leaks have developed. SITE -INSTALLED APPLIANCES AND FIXTURES If sinks, tubs, showers or other fixtures or appliances are to be site -installed, follow the manufacturer's installation instructions. Use only products listed for use in manufac- tured homes and follow all applicable local codes. Figure 93. Roof flashing and shingle installation around chimney i , // Installing combustion air inlets. Do not install the combustion air inlet such that material from the hearth can drop beneath the home. ' // Installing exhaust ducts. Route exhaust ducts so they do not terminate be- neath the home. Manufacturer's Installation Manual - June 2015 CHAMPION' INSTALL EXTERIOR LIGHTING Install exterior lighting according to Figure 94 and the following: 1. Remove cover. Remove the screws and cover from electrical junction box. 2. Install flash ring. Place the non-combustible flash ring over the junction box. 3. Connect wires. Connect fixture wires to house wires in the box, black to black, white to white, and equipment ground to equipment ground, using listed wire connectors. Push wires into the box. 4. Connect fixtures. Connect the fixture to the junction box or strap using screws provided with the light fixture. 5. Weatherproof. Weatherproof/caulk around the base of the fixture, leaving a small gap in the caulking on the bottom to permit drainage of water that may accumulate. 6. Complete installation. Install bulb and globe on the fixture and verify proper operation. Wire From Wire Switch (TYO for Ground Codn.4 Junction Boc Wire to Other Fbire INSTALL CEILING FANS/LIGHTS Install ceiling fans no closer than 36 inches to a smoke alarm, measured from the end of the fan blade to the edge of the alarm and with the trailing edges of the blades at least six feet -four inches above the finished floor. Comply with all unit manufacturers' instructions and the requirements below. CEILING FAN/LIGHT MOUNTED TO FACTORY -INSTALLED ELECTRICAL BOX IN CEILING Before installing the unit, make sure that adequate structural bracing is present in the ceiling. If uncertain, check with the manufacturer. Follow the fan or light manufacturer's instructions to connect the unit and complete the wiring. If the instructions are not available, connect the wiring as shown in Figure 95. Ground Wire ��ILW PAIN Ceiling Box,— I n Mounting Limited or Noncombustible Ring (If Required) Lighting installation. A qualified electrician should install lighting. Before con- necting lighting, disconnect power to the lighting circuit. Ground all exterior light fix- tures. Using a non-combustible ring. Install a non- combustible ring completely covering any combustible surfaces the fixtures may be mounted on (e.g. hard- board, clad wood and vinyl siding), or when ceiling ma- terial is exposed between the light fixture canopy and the junction box. Figure 94. Exterior lighting connection V, t b! rz z Installing ceiling fans. A qualified electrician should install lighting and fans. Be- fore connecting the ceiling fan or light, disconnect power to the fan wires. Any unit installed outside of the home (such as in a porch ceiling) shall be listed for wet locations. Figure 95. Wiring for a ceil- ing fan or chain -hung light fixture with a maximum weight of 35 lbs win 1. Viv ME ' • MANerACiURfoBeAVi11U1,Y, Manufacturer's Installation Manual - June 2015 87 TEST ELECTRICAL SYSTEM After completion of all electrical wiring and connections, including crossovers, appli- ances, lights, and ceiling fans, inspect and test the electrical system as follows: 1. Fill water heater. Fill water heater before turning on power to the home or switching on the circuit breaker. 2. Test continuity. Before turning on the electrical power to the home, conduct an electrical continuity test to ensure that exposed metallic parts of the home and the chassis are effectively bonded. 3. Test operation. After turning on the electrical power to the home, conduct operational tests of all devices (except water heaters, electric ranges, electric furnaces, dishwashers, clothes washers/dryers, and portable appliances) to demonstrate that they are connected and in working order. 4. Test polarity. After turning on the electrical power to the home, conduct elec- trical polarity cheeks to determine that connections of electrical equipment in- stalled or complelIed during installation have been made properly. Visual veri- fication is an acceptable electrical polarity check. r ii Choosing ceiling fan junc- tion boxes. Connect ceil- ing fans only to junction boxes listed and marked for ceiling fan application in accordance with Article 314.27(b) of 2005 NEC. Always ground metal junc- tion boxes. Selecting fan weight. Do not use any ceiling fans or light fixtures that exceed the weight rating of the box (35 Ibs unless otherwise noted). Grounding electrical de- vices. Ground fans/lights using a fixture -grounding device or a fixture - grounding wire as specified in the manufacturer's in- structions. Manufacturer's Installation Manual - June 2015 CHAMPION Complete Exterior Work This chapter covers sealing the*bottom board, installing the ground cover and skirting, preparing wind protection shutters, and completing site -built structures. STEP 1. REPAIR AND SEAL BOTTOM BOARD Tears and openings in the bottom board can result from transportation or installation / / activities. Inspect for holes and gaps across the entire bottom board, especially areas A around service penetrations, crossover connections, pipe and duct hangers, foundation ng bottom boards. Acon- Sealing elements, and the perimeter of the floor. Using approved materials appropriate for the s and sealed bottom tinboard type of repair, repair the bottom board wherever tom or loosened as follows: is critical for home per- t. Insulate. Replace any missing insulation prior to closure and repair of the bot- formance, energy efficiency, tom board, paying particular attention to insulation gaps that may have been protection against moisture created at P-traps. problems, prevention of pipe 2. Repair large openings. Repair large openings with a durable patch made of freezing, and protection against bottom board fabric or other compatible material and fastened with vinyl bot- insects and rodents. tom board tape held in place by fasteners installed with a divergent stapler. Bottom board sealing meth - Seal the edges around patches with foam or mastic. For large openings, in- ods. Tapes shall never be used stall a rigid backer board behind the bottom board to provide a fastening sub- alone to repair a bottom board. strate for the patch. Divergent staples or mastic 3. Repair small openings. Repair small gaps and tears with a combination of must be used in tandem with vinyl bottom board tape, patches, mastic, or foam sealant. tape to prevent future tear off. Alternate materials may be used to repair and seal the bottom board provided Fastening vinyl siding. Do not they are appropriate for the type of repair and installed per the manufacturer's install fasteners directly into vi- installation instructions. nyl siding. Allow for siding ther- mal expansion by pre -drilling STEP 2. INSTALL GROUND MOISTURE RETARDER minimum 1/2 inch diameter fas- If the space under the home is to be enclosed with skirting or other materials, a ground tener holes or fastening skirting to a ledger under the home (see moisture retarder of a minimum six mil thick polyethylene sheeting or equivalent must Best Practice tip). be installed covering the ground under the home. Moisture retarders are not required in and regions (less than 15 inches of rainfall annually) with dry soil conditions. If on - grade (surface) footings are used, install the ground moisture retarder prior to placing the footings, or install it around the footings after all other work under the home is com- plete. Install the ground moisture retarder as follows: Avoiding radon. For enclosed perimeter wall 1. Apply sheeting. Unroll the ground moisture overlapping joints in the sheeting a crawlspace foundations in minimum of 12 inches and covering the entire area under the home except for areas where radon is com- areas under recessed entries, decks, and porches. monly found in the soil, 2. Weigh down. To keep the retarder in place, weigh it down with stones, concrete continue the moisture re - tarder up the perimeter wall blocks, or other heavy, durable materials. at least 12 inches, sealing 3. Repair tears. Repair any large voids or tears in the retarder by patching with the edges and between the like material, maintaining a minimum 12 inch overlap, secured with tape or ad- seams with mastic. hesive. Repair small voids and tears with tape, adhesive or per manufacturer's installation instructions. • MAMUMCT.... 6.111U11Y• Manufacturer's Installation Manual - June 2015 99 STEP 3. INSTALL SKIRTING Skirting is any structural or npn-structural perimeter crawispace enclosure. Complete site -built structures (see STEP 5. COMPLETE SITE -BUILT STRUCTURES, p.92) that abut the home (such as porches, attached garages, and steps) prior to installing skirting. TABLE 28. SKIRTING MATERIALS SPECIFICATIONS Component_ Skirting bust be of weather -resistant materials or provided with protection against weather deterioration at least equivalent to that provided by a coat- Skirting ing of zinc on steel of not less than 0.30 oz per sq ft of surface coated. Skirting made from wood or wood products and used within six inches of the ground needs to be made of materials naturally resistant to decay and termite infestation or pressure -treated. @Attaching vinyl siding. install skirting vinyl -sided a homes, screw a treated 2 x 4 on edge to the underside of the floor joists two inches back from the edge of the home. Screw skirting tight to the 2 x 4. OF / / Ventilation openings must be covered for their full height and width with a perforated (1/4 inch maximum opening in any dimension) corrosion and weather -resistant covering that is designed to prevent the entry of rodents. A Vents In areas subject to freezing, the coverings for the ventilation openings must have an operable damper, permitting them to be in the open or closed posi- Avoid backfilling against tion depending on the weather. skirting. Do not backfill against non-structural skirting. To design and install skirting, comply with the skirting manufacturer's instructions (if provided) and the following: 1. Configure skirting l Run the skirting along the perimeter of the home's heated, conditioned space (Figure 96). Do not enclose with skirting areas under recessed entries, porches, o i decks (whether constructed as part of the home or added on site) unless skirting is of the fully vented type and installed so as to allow water to freely flow out fro under under the home. 2. Fasten skirting. Recess the skirting under the siding or trim and attach it to the home in a mannerlthat prevents water from being trapped between the siding or trim and the skirting. For wood, aluminum, or fiberglass skirting, install a skirt rail (lumber strip) under the floor inset at least 1-1/2 inches from the edge of the siding for attachment of skirting. Allow for frost heave when installing skirting in areas the subject to frost. 3. Provide ventilation. Unless the skirting has integral ventilation openings that meet the following ventilation requirements, install equally sized ventilation openings on at least two oppositsides of the foundation. Size ventilation area to equal at least one square foot for each 150 square feet of under -floor area (or for each 1,500 square feet if a ground moisture retarder is installed according to STEP 2. INSTALL GROUND MOISTURE RETARDER, p. 89). Place vents as high above the ground as practical. 4. Install access. �rovide an access opening not less than 18 inches wide and 24 inches high anti located so that any utility connections located under the home are accessible. I 5. Extend vents, drains, and inlets. Run appliance exhaust vents, combustion air in- lets, and air conditioner condensation drains through the skirting to the outside and terminate each as instructed in the sections of this manual corresponding to each appliance. Beam Pocket Detail Figure 96. Perimeter skirt- ------------- ---- ------------------------- - Perimeter Beam Pocket SkirtingI �— —I� width =5" ing at recessed entries, porches, and decks Porch depth = beam depth / Skirting Frame Beam ..-0—. —0 Recessed 90 I - Manufacturer's Installation Manual - June 2015 MANUFACTURED BEAUTIFULLY' STEP 4. ASSEMBLE OPTIONAL WIND PROTECTION SHUTTERS If desired, prepare temporary protective window covers for use during severe wind storms and hurricanes according to Figure 97, Table 29, and the procedure below. 1. Assemble extension framing using two 0.131" x 3'/4" nails at each connection. 2. Assemble shutter panels as shown in Figure 97. 3. Store the shutters such that they are protected from the weather, are not in di- rect contact with the ground, and are easily accessible by the homeowner. To attach shutters to the home: 1. Fasten extension framing to wall framing members with #8 x 3" screws, per Table 29. 2. Fasten assembled panel(s) to extension framing with #8 x 2" screws, per Table 29. Wdth Extension Framing #3 or Stud Grade SPF 2x3 Minimum Cut If Desired Secure OSB or Plywood to Studding Wth #8 x 2" Screws at 6° O.C. 2x4 #2 SPF Studding, Required When Plywood or OSB Used Is 3j" or Less In ThiGmess TABLE 29. SHUTTER CONSTRUCTION SPECIFICATIONS G A J PUI III IULUI UALVI IJIUI 111VIL1I G A •T bLUUU II ILj CIL 10 II IUI ICb U.U. Figure 97. Wind protection shutter construction Of ALq 9� PHILLIP J. 9 fT Nq I A EER s} NO. 4" 32035 A 0 a�°ssional En9'na June 1, 2015 CHAMPION' Manufacturer's Installation Manual - June 2015 91 STEP 5. COMPLETE SITE -BUILT STRUCTURES Install site -built structures such as steps, landings, garages, awnings, carports, breezeways, porches, decksl, railings, sheds, and utility rooms according to manufac- turer's instructions (if any), i � compliance with all local regulations including fire separa- tion and electrical requirements, and according to the following: • Do not obstruct a I of the two required exit doors or egress windows from the home. • Construct site -built structures to be structurally independent unless provided for in the design of the home (instructions will be provided by the manufactur- er). • Do not damage the integrity of the home's structural or weatherproofing sys- tem. Seal any weatherproofing connections between the site -built structure and the home and flash any roof connections. • Utilize only GFCII outlets for site -built structures. • Install and test stroke alarms in any site -built structures according to local code. I • The home's mechanical system has been designed for the home itself and does not consider the heating or cooling of the addition. • The addition must meet all local codes, including site work and fire separation requirements. The manufacturer does not accept any responsibility for the addtion's desig . • The home with an addition must be in conformance with the HUD Manufac- tureed Housing Code, such as exiting, light and vent, etc. The addition must be approved bar the jurisdiction having authority. • Site Work shall be consistent with the objectives of site grading as described in Prepare the Site. • The manufactlurer will not honor the warranty for any problem that relates to the constructii n of the addition (leak problems, etc.) • A dormer roof can be installed on the home to match the pitch of the addi- tions's roof; The shingles below the dormer must be removed and the dormer must be vented properly. The dormer weight shall be no more than 5 psf and distributed u l iformly over the roof trusses of the home. Connections may be made to attach the dormer to the home, but not be used to support the roofs loads of the Pddition. The dormer shall be shingled, flashed and sealed properly to prevent leaks (follow shingle manufacturer's instructions and ARMA guidelines for shingle valley applications). The manufacturer is provid- ing the abode information as an accommodation only and without considera- tion. Accordingly, by this letter the manufacturer extends no warranties or rep- resentationieither expressed or implied with regard to the recommendations here -in. i // Designing site -built struc- tures. All site -built structures must support their own dead, live, and wind loads and muss not transmit any loads to the home's structure. All carports should be freestanding. 92 I Manufacturer's Installation Manual - June 2015 MEN a • MANUFACTURED IEAUTIFULIY- repare Home for Occupancy Follow these steps for final inspection and completion of the home. STEP 1. - VERIFY ALTERNATIVE CONSTRUCTION (AC) INSPECTION (p. 93) STEP 2. COMPLETE INSPECTION CHECKLIST (p. 93) STEP 3. COMPLETE ENERGY STAR CHECKLIST .(p. 93) STEP 4. CLEAN THE HOME (p. 93) STEP 1. VERIFY ALTERNATIVE CONSTRUCTION (AC) INSPECTION This is normally the responsibility of the retailer and the manufacturer, however, the in- stallation is not complete until the alternative construction inspection has been passed and documented. STEP 2. COMPLETE INSPECTION CHECKLIST After all previous steps have been accomplished, inspect the home to verify that it has been completely and properly installed using the checklist starting on p. 94. Correct any deficiencies found, if possible, or if not possible, inform the retailer or man- ufacturer immediately. STEP 3. COMPLETE ENERGY STAR CHECKLIST For ENERGY STAR qualified homes (check with the retailer or manufacturer), this step is to be completed by the manufacturer's designated representative: Ask the retailer or the manufacturer who this is. The manufacturer's representative must complete the Energy Star Site Installation Checklist, obtain signatures on the ENERGY STAR label, and return the completed ENERGY STAR Site Installation Checklist to the manufacturing plant. STEP 4. CLEAN THE HOME Remove and properly dispose of all installation -generated dust, debris, and packaging materials from the home and the surrounding property. Ensure that the home is in "move -in" condition. MANUFACTURED BEAUTIFULLY" Manufacturer's Installation Manual June 2015 93 Complete linstallation Checklist Use this checklist to confirm that the listed aspects of the installation are complete and correct. FOUNDATION ❑ Footings properly sized and constructed for the soil conditions ❑ Pier spacing per data Mate and applicable table and roof load zone El Piers properly constrylcled and vertical ❑ Perimeter blocking installed (if required) ❑ Piers at each side of large sidewall openings ❑ Center line piers inst�lied at columns ❑ Shims in place and ti ht ANCHORS ❑ Approved anchors are used ❑ Anchors are installed at correct angles ❑ Anchor spacing andlinstallation correct ❑ Longitudinal ties installed ❑ Anchor straps are t nsioned UNDER THE HOME ❑ Moisture retarder, inIstalled ❑ The ground is proprly graded to prevent water accumulation ❑ HVAC ducts are supported off the ground and connected tightly to collars at all ern ElFireplace combustion air intake free and unrestricted ❑ No holes or tears i I bottom board ❑ Skirting has been installed per manufacturer's instructions with proper venting and provision for frost 6ave ❑ Dryer vent, range/cook top exhaust, water heater temperature and pressure overfl pipe (when home's set over full basement or enclosed crawl space) and AC con- densate drain installed to perimeter of crawl space EXTERIOR ❑ Shingled roofs are free of visible damage and serious defects and there are no missing or loose shingles ❑ Shingle close -upland ridge cap have been completed per applicable details ❑ All hold down straps on shingled roofs have been removed and staple holes have been properly sealed ❑ Penetrations at roof stacks, vents and chimneys have been properly sealed ❑ Siding and trim is free of gaps, voids, missing fasteners, damage, and serious defects. All seams are sealed and hardboard edges are sealed ❑ Drip edge and flaIscia is properly installed and free of damage and serious defects El Gutters and dov nspouts are installed properly such that water is diverted away from the home ❑ Trees and bus es have been trimmed to prevent brushing against the home in windy conditio s or under snow loads ❑ The HUD labelis exposed, intact and legible i ' /, Limits of the checklist. This checklist is not all-inclusive. Some homes have im- portant features not listed here. Completing this checklist does not guaran- tee that all installation re- quirements have been met. After relocating home. Any home that has been re- installed after its original in- stallation should be in- spected after it is set up, in order to assure that it has not been damaged and is properly installed. 94 Manufacturer's Installation Manual - June 2015 r�NY1KlYt�i1P WM{gis- ❑ The exterior of the home and immediate surroundings is clean, clear of construction materials, dust, and debris INTERIOR ❑ Ceilings, walls, and floor coverings are free from damage and serious defects ❑ Carpeting is properly stretched and seamed ❑ All trim and molding is installed properly and free of damage and defects ❑ All cabinets, countertops, plumbing fixtures, appliances, furnishings, and window coverings are free of damage or serious defects ❑ All cabinet doors and drawers work properly ❑ All interior and exterior doors and windows open, close, and latch properly ❑ One window in each bedroom meets emergency egress requirements, has operating instruction labels on it, and operates properly ❑ All temporary shipping hardware has been removed ❑ Floors are level ❑ The data plate is intact and legible ❑ Smoke alarms have been tested ❑ The interior of the home is clean, clear of materials, dust, and debris WATER AND DRAIN SYSTEMS ❑ Crossover and service connection and splices have been properly made with correct materials ❑ Water and drain lines are insulated or otherwise protected from freezing ❑ Pipe supports are installed and properly spaced ❑ Proper slope has been maintained on all drain lines ❑ All necessary inspections and tests have been performed ❑ All sinks, basins, tubs, and toilets operate properly ❑ All hot and cold water lines are properly connected to fixtures, dispense water as labeled, and operate properly ❑ Tub, tub/shower and shower outlets have been verified to ensure the outlet hot water temperature does not exceed 120°F (49°C) ELECTRICAL SYSTEMS ❑ The panel amperage matches the connection to the home ❑ The home has been properly grounded ❑ The main power supply has been properly connected and tested by a licensed electrician ❑ All electrical crossovers have been connected ❑ All receptacles, switches, and light fixtures operate properly ❑ Ground fault circuit interrupters operate properly ❑ All exterior lights have been properly installed GAS/FUEL OIL SYSTEMS ❑ The gas system pressure test has been conducted ❑ Connections between units are properly made with access as required ❑ The main fuel line has been properly connected and tested by a qualified technician APPLIANCE OPERATING AND VENTING ❑ All appliances are working properly ❑ Appliance venting is in accordance with the manufacturer's instructions ❑ Fresh air intakes are properly installed ❑ Whole house, kitchen, and bath exhaust fan operation are correct ❑ Fireplace chimney stack extension and roof cap have been installed in accordance with the manufacturer's instructions ❑ Air conditioner/heat pump is sized properly IQ,tw,•,,,,. Manufacturer's Installation Manual - June 2015 95 MISCELLANEOUS ❑ Installation/anchoringlcertificates or seals have been issued and installed (if required) ❑ Owner's and operation manuals are available for all appliances ❑ This installation manual is left with home 96 I Manufacturer's Installation Manual - June 2015 tuNW�CIYt(�11t4faYN 3401 W. Corsicana Street Athens, TX 75751 903-677-0108 501 S. Burleson Blvd. Burleson, TX 76028 800-414-2605 1 817-572-1341 6420 West Allison Road Chandler, AZ 85226 877-738-8838 1 520-796-4300 2551 Champion Drive Claysburg, PA 16625 800-932-5121 1 814-239-5121 29' N Smith Avenue Corona, CA 92880 951-734-6610 CORPORATE OFFICE: Champion Home Builders, Inc. 755 West Big Beaver Road Suite 1000 Troy, MI 48084 248.614.8200 www.chompionhomes.com 2073 Evergreen Street Dresden, TN 38225 800-530-7335 1 731-364-4600 101 Garden Spot Road Ephrata, PA 17522-0428 800-733-6267 1 717-733-7941 �- 1915 SE State Road 100 Lake City, FL 32025 800-223-5471 1 386-755-3073 40�5-50 '4.ghway 401 South L:rlgtt2n, NC 27546 800-428-9182 1 910-893-5713 840 Palm Avenue Lindsay, CA 93247 559-562-4951 1 800-451-4951 S P • o MANUFACTURED BEAUTIFULLY' Dutch® Housing111�k HIGHLAND" MANUFACTURING HOMES OF MERITTM HOMES �ieue�-cov.�6irn ATLANTIC® HOMES 951 Route 12 South Sangerfield, NY 13455 800-937-391 1 1 315-841-4 308 Sheridan Drive Topeka, IN 46571 - 800-777-6637 1 260-593- PO Box 190, 1425 Sunnyside Wesier, ID 83672 877-540-4906 1 208-549-1 1660 Rowe Avenue Worthington, MN 56187 507-376-9460 3200 Enterprise Avenue York, NE 68467 800-752-7906 1 402-362- REDMAN X44 HO 14 A7HENS PARK HOMES' FORTUNE® Copyright June 2015 by Chom� All Rights Reserved.