HomeMy WebLinkAboutENGINEERINGad
M r... `
lighter than concrete,
saves on labor.
• larger pads to -increase spacing,
,saving time -and -material.
• Matl®frontrecycled materials.
• Easily stackible for larger°pad,,
area and wider pier spacing.
• Multi stack for 5. sq. ft. &.•6 sq.-ft.
Pad Bearing Capacity
ABS Pad
Part#
1000 lbs.
1500 lbs.
2000 lbs.
3000 lbs.
Site
Soil
Soil I
Soil
Soil
16" x 18"- 2 Sq. Ft.
60300
2,000 Ibs.
3,000 Ibs.
4,000 lbs.
6,000 lbs.
288 Sq. In.
16" x 22.5" - 2,5 Sq. R.
60301
2,500 Ibs,
3,750 lbs'.
5,000 lbs.
7,500 lbs.
360 Sq, In.
17" x 2511- 3 Sq. R.
59302
3,000 lbs—
4,500 Ms.
6,000 Ms.
N/A
432 Sq. In.
24" x 24" - 4 Sq. R.
59303
4,000 lbs.
6,000 Ibs.,
8,000 lbs.
N/A
576 Sq. In.
MUM Pad� Layout
32" X 22.5" (See 1 below)
3 X 59301
5,000 Lbs.
7,500 lbs
10,000 I-W.
5 Sq. R. - 720 Sq. In.
34.4 X 26.2 (See2 below)
3 X 59302
6,000 Lbs.
9,000 lbs.,
12,000 Lbs.*
6' Sq. Ft. --864 Sq. In.
I.
-'•Single Stack
-Course
Double Stack
- 'Course
• 'tee
*"Concrete Block-rated'G.8000 lbs. Double block any higher loatls:
1.:7he 32 X 22.5 Pyramid configuration uses 2 -16 X,22:5_pads placed side-byside with ..-.< '• ' �.
1--16 X22.5 pad'on top in the opposite direction.'•
Multi Pad •
2. The 34,4'X 25.4 Pyramid configuration uses 2 —17:2 X 25.2 placed side by side with Layout
1, —17.2 X 25.2 Pad on topan the opposite direction. � ;Cop
Un
0
d
a