HomeMy WebLinkAboutINSTALLATION SPECIFICATIONSManufactured Hon
(Most be completed and
AG
Applicant '�liae , TAC
Address �Oi� o 1,Ak -mij P�.AI lafi�,
Manufacturers Name
RoofZone
No. of Sections I_ Width I_(y_
r Installation Standard Used (check) Msnufacturm
607-TI 6
ie Installation Specifications
,jsubmitted with your application)
Permit # la3 4 O I b
Lz -
U5-1 ' Oe-v-ce-v �FI 314Q
Zone
20 I qo ff
15C-1
Site Preparation
Debris and Organic Removal -*
Water Drainage: Natural Swale Pad Other
Foundation
Load bearing soil density _ Or assum
Footing type: Poured in place A
Mainrall frame block: Size ff V24 Placement o.c.
Perimeter blocking: Size . fo Number
Ridge beam support: Number Size
Center line blocking: Number Size
Special supports required (fireplace, bay window) Yes
Mating of Units: Mating gasket AA TyF
Fasteners: Roof Type
Endwall Type
Floors Type
Anchors: Type 6,000 3,150 _
I3eight of Unit (top of foundation to frame): _
Angie of straps ap Ver -CtA. t
Number of frame ties O Spacing
Number of over -roof ties (if required)
Number of sidewall anchors Zone II _
Number of centerline anchors_:w_ Number
Vents required for underpinning (1 sfl 150 sf floor area
Prepared by:
1,000 psf
Location
Location
Location
No S
used AA
Zone III jdj
'stabilizers
No. I_
Page #
Page #
Page #
Page #
Page #
Page #
Page #
Page #
Page #
Page #
Page #
Page #
Page #
Page #
Page #
Page #
Page #
Page #
Page #
Page #
File opy
Date:
Revised 7/22/2014
PROPERTY LOCATION:
❑ Assumed 1,000 P.S.F. soil bearing (If not assume
enter results in box below
TEST RESULTS
TQst Location #1 Test Location #2
sf 5`G� sf
X X
• Test the perimeter of the home at xix (6) location
V I e Take the reading at the depth of the footer
. 3((gKs-
Test Location #3
So 0 psf
X
® Using 500 LB increment, take the lowest reading and round down to that increment. I
Test Location #1 Test Location #2 Test Location #3
S0-C) Psf ,C5, 00 psf psf
X X X
ISoil bearing capacity used to determine pier layo%t: 15y V psf. Date Test Taken: 3 -/q- / ? I
ANCHORING SYSTEM TO BE USED
15C (Anchored in accordance with Chapter 15C of Mobile/Manufacture Home Installations Standards)
Bracing System (Installation Standards for Model Required)
L-
rA�1k
15k�--w c d-e•.,,,1;$-nrdA — hereby c
Installer Name Printed
Subscribed and sworn to before me this
that the above is true and accurate.
day of
Installer Signature
20_ Q . W Is ( ) Is not
My commission expires:
File Co
1 Of 1 E?:Nary Public Stete of Flo'Jatoria LawsCommission GGires 03/15/2022