HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENTJ"ti St. Lucie County .u�pections
SCANNED BY 2300 Virginia Avenue
ST t ip. rA8 Ft. Pierce, FL 34982
� P (772) 462-2172
OR1�
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
I
PERMIT # e> fib- C2A-Q' JOB ADDRESS f
BUILDERt�
PEST CONTROL CONTRACTOR HANNAN PEST MANAGEMENT
PEST CONTROL LICENSE#
NOTE
We, the undersigned, hereby certify that we have pretreated the above -described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet of area treated: 2�56Q Chemicals used:
Percentage of solution:
Date of treatment:
i'
❑ Footing i
❑ 1 st Treatment
❑ Re -treat
lab
1 st Treatment
Re -treat
❑ Driveway
❑ 1st Treatment
❑ Re -treat
❑ Pools
❑ 1 st Treatment
❑ Re -treat
❑ Other
❑ 1 st Treatment
❑ Re -treat
Total gallons used: Zy�p
Time of treatment:
FBC104.2.6 Certificate of Protective Treatment for prevention of termites.
Aweather resistant jobsite posting board shall be provided to receive
duplicate Treatment Certificates as each required protective treatment is
completed, providing a copy for the person the permit is issued to and
another copyfor the building permit files. The Treatment Certificate shall
provide the product used, identity of the applicator, time and date of the
treatment, site location, area treated, chemical used, percent concentration
and number of gallons used, to establish a verifiable record ofprotective
treatment. If the soil chemical barrier method for termite protection is used,
final exterior treatment shall be completed prior to final building approval.
St. Lucie County requires for the final inspection for CO, a Permanent
Sticker to be placed on the electrical panel box cover, listing all the
treatments and dates of applications.
❑ Perimeter for Final Inspection
Signature of exterminator
There must be a completed form for each required treatment or re -treatment and this form must be on
the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will
Ifail and a re -inspection fee charged.