Loading...
HomeMy WebLinkAboutPENETROMER TEST RESULTSPROPERTY LOCATION: U ` .1-7 11 13 Assumed 1,000 F.S.F. soil bearing (If not Tost Location #1 sf X • Test the perimeter of the ce- ad enter results in box below. TEST RESULTS Location #2 Test Location #3 0 e) vsf SCE sf X X at xix (6) location ® Take the reading at the depth lof the footer ® Using 500 I.B increment, takg the lowest reading and round down to that increment. Test Location #1 Test Location #2 Test Location #3 Sow psf 11 ,r5 0o psf ISod psf X X X Soil bearing capacity used to determine pier layout: 15,6 U ps£ Date Test Taken: 3 -/q- ANCHORINIG SYSTEM TO BE USED 15C (Anchored in accordance with Chapt i 15C of Mobile/Manufacture Home Installations Standards) Bracing System (Installation Standards for Model Required) kk I. t5-An(j c d.�/A hereby cbrtify that the above is true and accurate. Installer Name Printed Q� �c Installer signature Subscribed and sworn to before me this IK I day of 20�� . personally know to me. Identified by: I • My commission expires: W is ( ) Is not I 1 of 1 �p�'"°�'ar�, Notary Public State of Florida Victoria Laws roc My Commission GG 197151 opA¢• Expires 0 /15/2022 'File COPY..