Loading...
HomeMy WebLinkAboutPAD BEARING CAPACITYWilli i .Lighter than+concrete, saves on labor. Larger pads to:ncrease spacing,'.: saving time and material. • Made from ,recycled materials. + Easily stackable for larger -pad, area and wider pier spacing. • Multi stack for 5 :sq. ft. & I's4fi-A Pad Bearing, Capacity ABS Pad Part# loon lbs. '1600lbs, 2000 lbs. 3000 lbs. Size toll soil Soil Soil 16" x 1'811- 2 Sq. Ft. 59300 2,000 lbs. 3,000 lbs. 4,000 lbs. 6,000 lbs. 288 Sq. in. 16" x 22,5" - 2.5'Sq. Ft 50301 2,500 Ibs, 3,750 Ibs. 5,000 lbs. 7,500 lbs.. 360 Sq. In. 17" x 2511- 3 Sq. R. 59302 3,000 Ms. 4,500 lbs. 6,000 lbs. N/A. 432 Sq. In. 24" x 2411. - 4 Sq: Ft. 59303 4,000 lbs. 6,000 lbs. 8,000 lbs. N/A 676 Sq. In. Muffftd Leyouf 32" X 22V1(See 1:below) 3 X 59301 5,000 Lbs. 7,500 lbs. 10,000 LbV 5 Sq. Ft - 720 Sq. In. 34.4 X 25.2 (See 2 below) 3X 59302 6,000 Lbs. 9,000 lbs, 12,000 Lbs 6 Sq. Ft. - 864 Sq. In. F f * Concrete Block rated 43l�B000 ibs. Double bloak'any higher loads. L �: - ' •�� �: t. The 32 X 22.5 Pyramid configuration uses 2 -1Ii Xy22:5-pads placed -side by side with 1-16 X 22.5 pad on top in the opposite direction. t I Multi Pad 2. The 34.4 X 25.4 Pyramid configuration uses 2-17.2`X eed side by side with Layout .1-17.2 X 25.2 Pad on top in the opposite direction. ., ar- TIE DOWN ENGINEERING o 255 Villanova Drive SW • Atlanta, GA 30336 TIE www.tiedown.com (404) 344-0000 Fax (404) 349-040i IENGMEERINGAOWN