Loading...
HomeMy WebLinkAboutPRODUCT APPROVALkW 9�1 'n rs Florida r d t,yN, ProfessionalRegulation�ed ¢ SCIS Home i Login ( User Registration Hot Topic { SubmitSurcha tri iblications { FBC Staff { BCIS Site Maps ` Links { Search Product Approval USER: Public User Product Approval Menu > Search Criteria Code Version Application Type Category Application Status Quality Assurance Entity Product Model, Number or Name Approved for use in HVHZ Impact Resistant Other Search Results - Aoolications > Application List Refine Search FL# 16027 Product Manufacturer ALL Subcategory ALL Compliance Method ALL Quality Assurance Entity Contract Expired ALL Product Description ALL Approved for use outside HVHZ ALL Design Pressure ALL FL# Type Manufac%urer Validated By Status FL16027-R2 Revision Tri-Built Materials Group, LLC Category: Roofing Subcategory: Modified BitumQn. Roof System John W. Knezevich, PE (954) 772-6224 Approved History +Approved by DBPR. Approvals by DBPR shaill be reviewed and ratified by the POC and/or the Commission it The State of Florida is an AAJEEO Under Florida law, email addresses are p mail to this entity.. Instead, contact the c (1), Florida Statutes,; effective October i ema➢s provided may be used for official c please provide the Department with an 2601 Blair Stone Road, Tallahassee FL 32399 Phone: 850-487-1824 loyer. Copyright 2001-2013 State of Florida.:: Privacy Statement :: Accessibility Statement :: Refund Statement records. If you do not want your e-mail address released in response to a public -records request, do not send electronic by phone or by traditional mail. If you have any questions, please contact 850.487.1395. •Pursuant to Section 455.275 2, licensees licensed under Chapter 455, F.S. must provide the Department with an email address if they have one. The iunlcation with the Iicensee..However email addresses are public record. If youdo -not wish to supply a personal address, I address which can be made available to the public. To determine if you are a licensee under Chapter 455, F.S., please click here Product Approval Accepts: Credit Card Safe THESE PLANS AND ALL PROPOSED WORK ARE SUBJECT TO ANY CORRECTIONS . REQUIRE® BY FIELD INSPECTORS THAT �; ;'- MAY SR NECESIRARY iN,OAQER T® 3 ®��iPLi� \l TRINITY I ERD REPORT TRI-BUILT Materials Group, LLC PO Box 70 Rutherford, NJ 07070 (800) 516-1495 EXTERIOR RESEARCH & DESIGN, I.I.C. Certificate of Authorization #9503 353 Christian Street Oxford, CT 06478 (203) 262-9245 Evaluation Report A42970.10.12-112 FL16027-R2 Date of Issuance:10/23/2012 Revision 2: 09/25/2017 SCOPE: J This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of construction materials in the State of Florida. The documentation submitted has been reviewed by Robert Nieminen, P.E. for use of the product under the Florida Building Code. The product described herein has been evaluated for compliance with the 6 h Edition (2017) Florida Building Code sections noted herein.. DESCRIPTION: TRI-BUILT'Modified Bitumen Roof Systems LABELING: Labeling shall be in accordance) with the requirements the Accredited Quality Assurance Agency noted herein. CONTINUED COMPLIANCE: This Evaluation Rep, Quality Assurance documentation changes, this Evaluation Report by the named cliel changes or the referenced Quality Assurane Evaluation Report relative to updated Code ADVERTISEMENT: The Evaluation Report num advertising literature. If any portion of the INSPECTION: Upon request, a copy of this eni its distributors and shall be available for ins This Evaluation Report consists of pages 1 Prepared by: Robert J.M. Nieminen, P.E. Florida Registration No. 59166, Florida-0CA CERTIFICATION OF INDEPENDENCE: 1. Exterior Research & Design, LLC. d/b/a Trinity I in any company manufacturing or distributing p 2. Exterior Research & Design, LLC. d/b/a Trinit distributing products it evaluates. 3. Robert Nieminen, P.E. does not have nor will ai which the evaluation reports are, being issued. 4. Robert Nieminen, P.E. does not have, nor will a product. 5. This is a building code evaluation. NeitherTrii project on which this Evaluation Report, or pre specifically for that purpose. t is valid until such time as the named product(s) changes, the referenced r provisions of the Code that relate to the product change. Acceptance of constitutes agreement to notify Robert Nieminen, P.E. if the product documentation changes. Trinity) ERD requires a complete review of this Rquirements with each Code Cycle. er preceded by the words "Trinity I ERD Evaluated" may be displayed in /aluation Report is displayed, then it shall be done in its entirety. -e Evaluation Report shall be provided to the user by the manufacturer or action at the job site at the request of the Building Official. 4, plus a 26-page Appendix. STAM The facsimile seal appearing was authorized by Robert Nieminen, P.E. on 09/25/2017. This does not serve as an electronically signed document. ID does not have, nor does it intend to acquire or will it acquire, a financial interest ducts it evaluates. I ERD is not owned, operated or controlled by any company manufacturing or a financial interest in any company manufacturing or distributing products for a financial interest in any other entity involved in the approval process of the I ERD nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any Is versions thereof, is/was used for permitting or design guidance unless retained ROOFING. SYSTEMS EVALUATION: 1. SCOPE: Product Category: Roofing Sub -Category: Modifii Compliance Statement: TRI-BUILT LLC, have demonstrated compliance through testing in accordance with t and Limitations / Conditions of Use s 2. STANDARDS: r)0 �l TRINIIYJERD I Bitumen Roof Systems lodified Bitumen Roof Systems, as produced by TRI-BUILT Materials Group, with the following sections of the a Edition (2017) Florida Building Code following Standards. Compliance is subject to the Installation Requirements : forth herein. Section Pro a Standard Year 1504.3.1 Wind FM 4474 2011 1504.7 Impact FM 4470 2012 1507.11.2 Physical Properties ASTM D6163 2008 1507:11.2 Physical Properties ASTM D6164 2011 1507.11.2 Physical Properties ASTM D6222 2011 3. REFERENCES: gniity Examination Reference Date ERD (TST6049) Physical Properties P10490.10.08-2 10/30/2008 ERD (TST6049) FM 4470/4474 P13760.09.09 09/10/2009 ERD (TST6049) FM 4470/4474 P13770.09.09 09/10/2009 ERD (TST6049) FM 4470/4474 P30540.11.09-R1 11/30/2009 ERD (TST6049) FM 4470/4474 P30550.12.09 12/02/2009 ERD (TST6049) Physical Properties P33960.12.10 12/30/2010 ERD (TST6049) FM 4470/4474 P33970:03.11 03/15/2011 ERD (TST6049) Physical Properties P37590.03.13-3A 03/06/2013 ERD (TST6049) FM 4470/4474 P39680.03.13 03/04/2013 ERD (TST6049) Physical Properties P37590.03.13-1-R1 06/26/2013 ERD (TST6049) Physical Properties P37590.03.13-2-R1 07/01/2013 ERD (TST6049). Physical Properties P37590.07.13-2 07/01/2013 ERD (TST6049) Physical Properties P37590:03.13-5-R1 07/01/2013 ERD (TST6049) Physical Properties P3759M7.13-1 07/02/2013 ERD (TST6049) Physical Properties P45940.09.13 09/04/2013 ERD (TST6049) Physical Properties P44370.10.13 10/04/2013 FM Approvals (TST1867) FM 4470 2W7A7.AM 08/04/1994 FM Approvals (TST1867) FM 4470 0D3A3.AM 04/04/1997 FM Approvals (TST1867) FM 4470 2DOAO.AM 12/23/1998 FM Approvals (TST1867.) FM 4470 2D5A9.AM 06/22/1999 FM Approvals (TST1867) FM 4470 3006646 01/04/2000 FM Approvals (TST1867) FM 4470 3001334 01/25/2000 FM Approvals (TST1867) FM 4470 3001334 02/15/2000 FM Approvals (TST1867) FM 4470 3000857 01/12/2000 FM Approvals (TST1867) FM 4470 3004091 01/12/2000 FM Approvals (TST1867) FM 4470 3006115 05/02/2001 FM Approvals (TST1867) FM 4470 3012321 07/29/2002 FM Approvals (TST1867) FM 4470 3014692 08/05/2003 FM Approvals (TST1867) FM 4470 3014751 08/27/2003 FM Approvals (TST1867) FM 4470 3007170 01/13/2004 FM Approvals (TST1867) FM 4470 3019317 06/30/2004 FM Approvals (TST1867) FM 4470 3020703 07/30/2004 FM Approvals (TST1867.) FM 4470/4474 3018332 01/31/2006 FM Approvals (TST1867), FM 4470/4474 3023368 03/20/2006 FM Approvals (TST1867) FM 4470/4474 3024594 05/23/2006 Exterior Research and Design, I.I.C. Evaluation Report A42970.10.12-RZ Certiflcate of Authorization #9503 0 EDITION (2017) FBC NON-HVHZ EVALUATION FL16027-R2 TRI-BUILT Modified Bitumen Roof Systems; (800) 516-1485 Revision 2: 09/25/2017 Page 2 of 4 EntitV FM Approvals (TST1867) FM Approvals (TST1867) FM Approvals (TST1867) PRI (TST5878) PRI(TST5878) PRI(TST5878) PRI(TST5878) Miami -Dade (CER1592) Miami -Dade (CER1592) UL LLC (QUA9625) UL LLC (QUA9625) UL LLC (QUA9625) 4. PRODUCT DESCRIPTION: FM 4470/4474 FM 4470/4474 FM 4470/4474 Physical 'properties Physical Properties Physical Properties Physical broperties HVHZ C Impliance Proposall for Review Quality. Control Quality Control Quality Control M,1� '\J TRINITY I ERD Reference 3023458 3030668 3032172 PUSA-062-02-01 PUSA-061-02-02 PUSA-064-02-02 PUSA-062-02-02 Various NOAs 10-0823 ML Agreement ML Correlation, R27202 Service Confirmation, R14571 Date 07/18/2006 09/12/2007 06/12/2009 12/04/2007 01/28/2008 02/27/2008 12/04/2008 Various 10/12/2010 02/27/2012 08/20/2012 Exp.10/06/2018 This Evaluation Report covers TRI-BUILT Modified Bitumen Roof Systems installed in accordance with TRI-BUILT Materials Group, LLC published installation instructions and the Limitations / Conditions of Use herein. The following membranes make up the subject systems. Table 1 Rolf -Goods for TRI-BUILT Modified' -Bitumen Roof Systems . 1, ;_ .. Type Product Specification Reference Grade Type SBS Membranes TriBuilt SA SBS Base ASTM D6163, Table 2 S I TriBuilt SBS Granular ASTM D6164 G I TriBuilt 5A 59S Cap ASTM D6164 G I APP Membranes TnBuilt APP Smooth ASTM D6222 S I iBuilt APP Granular ASTM D6222 G RnBuiltSA APP Cap ASTM D6222 G 1 S. LIMITATIONS: 5.1 This is a building code eval ation. Neither Trinity) ERD nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design. guida�nce unless retained specifically for that purpose. 5.2 This Evaluation Report is not for use in FBC HVHZ jurisdictions. 5.3 Refer to a current Approved Roofing Materials Directory for fire ratings of this product. 5.4 For steel deck installations, foam plastic insulation shall be separated from the building interior in accordance with FBC 2603.4 unless the exIceptions stated in FBC 2603.4.1 and 2603.6 apply. 5.5 The roof system. evaluation herein pertains to above -deck roof components. Roof decks and structural members shall be in accordance with FBC requirements to the satisfaction of the Authority Having Jurisdiction. Load resistance of the roof deck shall be documented through proper codified and/or FBC Approval documentation. 5.6 For recover installations; the existing roof shall be examined in accordance with FBC 1511. 5.7 For mechanically attached insulation or membrane or strip -bonded insulation, the maximum design pressure for the selected assembly shall meet or exceed the Zone 1 design pressure determined in accordance with FBC Chapter 16. Zones 2 and. 3 shall employ an attachment density designed by a qualified design professional to resist the elevated pressure criteria. Commonly used methods are ANSI/SPRI WD1, FM Loss Prevention Data Sheet 1-19, Roofing Application Standard RAS 117 and Roofing Application Standard RAS 137. Assemblies marked with an asterisk* carry the limitations set forth in Section 2.2.10.1 of FM Loss Prevention Data Sheet 1-29'(January 2016) for Zone 2/3 enhancements. Exterior Research and Design, LLC: Evaluation Report A42970.10.12-RZ Certificate of Authorization #9503 6n' EDITION (2017) FBC NON-HVHZ EVALUATION FL16027-R2 TRI-BUIL7 Modified Bitumen Roof Systems, (800) 516-1485 Revision 2: 09/25/2017 Page 3 of 4 5.8 For assemblies with all comp assembly shall meet or excee rational analysis is permitted 5.9 For mechanically attached ins existing deck for withdrawal r to the minimum requirement FX-1 or Testing Application. S 5.10 For bonded insulation or me.9 existing deck or existing roof 1 any surface conditions exist t with ANSI/SPRI IA-1, ASTM E 124 shall be conducted on mD 5.11 For bonded insulation or mE system shall be capable of r Authority Having Jurisdiction, Loss Prevention Data Sheet 1 5.12 Metal edge attachment (exce FBC Chapter 16 and tested for RAS 111, except the basic 1609.3(3). 5.13 All products in the roof assem 6. INSTALLATION: F)o \JTPJNITYIERD Dnents fully bonded in place, the maximum design pressure for the selected d critical design pressure determined in accordance with FBC Chapter 16. No or these systems. ulation or membrane over existing roof decks, fasteners shall be tested in the asistance. A qualified design professional shall review the data for comparison s for the system. Testing and analysis shall be in accordance with ANSI/SPRI andard TAS 105. ibrane over existing substrates in a re -roof (tear off) or recover installation, the urface shall be.examined for compatibility with the adhesive to be installed. If hat bring system performance into question, field uplift testing in accordance 107, FM Loss Prevention Data Sheet 1-52 or Testing Application Standard TAS ck-ups of the proposed new roof assembly. !mbrane over existing substrates in a recover installation, the existing roof :sisting project design pressures on its own merit to the satisfaction of the as documented through field uplift testing in accordance with ASTM E907, FM •52 or Testing Application Standard TAS 224. pt gutters), shall be designed and installed for wind loads in accordance with hresistance in accordance with ANSI/SPRI ES-1 or Roofing Application Standard rind speed shall be determined from FBC Figure 1609.3(1), 1609.3(2) or shall have quality assurance in accordance with FAC Rule 61G20-3. 6.1 TRI-BUILT Modified Bitumen Roof Systems shall be installed in accordance with TRI-BUILT Materials Group, LLC published installation instructions, subject to the Limitations / Conditions of Use noted below. 6.2 System attachment requirements for wind load resistance are set forth in Appendix 1. "MDP" = Maximum Design Pressure is the result of testing for wind load resistance based on allowable wind loads, and reflects the ultimate passing pressure divided by 2 (the 2 to 1 margin of safety per FBC 1504.9 has already been applied). Refer to FBC 1609 fo 1 determination of design wind loads. 7. BUILDING PERMIT REQUIREMENTS:. As required by the Building Official this product. 8. MANUFACTURING PLANTS: Contact .the noted QA agency for requirements. 9. QUALITY ASSURANCE ENTITY., UL LLC— QUA9625; (314) 578-3406, k.c - THE 26-PAGES THAT Exterior Research and Design, I.I.C. Certificate ofAuthorization #9503 TRI-BUILT Having Jurisdiction in. order to properly evaluate the installation of information on product locations covered for F.A.C. Rule 61G20-3 QA us.ul.com PART OF THIS EVALUATION REPORT - Evaluation Report A42970.10.12-R2 (2017) FBC NON-HVHZ EVALUATION FL16027-R2 W Bitumen Roof Systems; (800) 516-1485 Revision 2: 09/25/2017 Page 4 of 4 `J TRINITY ERD JIPPENpIX l: ATTACHMENT REQUIREMENTS FOR WINb UPLIFT RESISTANCE Table Deck Application Type Description Page SA-1 Wood New or Reroof (Tear -Off) A-2 Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover 4 IA-2 Wood New, Reroof (Tear -Off) or -Recover A-2 Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover 5 18 Wood' New,.Reroof{Tear-Off) or Recover B Mech. Attached Base insulation, Bonded Top Insulation, Bonded Roof Cover 5 1C Wood New, Reroof (Tear -Off) or Recover C Mech. Attached Insulation, Bonded Roof Cover .6 1D Wood New, Reroof (Tear=Off) or Recover D Prelim. Attachedlnsulation, Mech. Attached Base Sheet, Bonded Roof Cover 6 1E-1 Wood New or Reroof (Tear -Off) E Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover 7 1E-2 Wood New, Reroof.(Tear-Off) or Recover E Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover 8 -_.._ __ New or_Reroof...(Tear-Off)-_.__. -___.� F' 4 w Non-lnsulated,:Bonded,Roof Cover-, 2A Steel or Structural concrete New, Reroof (Tear -Off) or Recover B Mech. Attached Base Insulation, Bonded Top Insulation, Bonded Roof Cover 9 2B Steel or Structural concrete New, Reroof (Tear -Off) or Recover C Mech. Attached Insulation, Bonded Roof Cover 9 2C Steel or Structural concrete New, Reroof (Tear -Off) or Recover_ D Prelim.Attached-Insulation,.Mech. Attached.BaseSheet,-Bonded•Roof Cover 0- 3A Structural concrete New or Reroof (Tear -Off) A-1 Bonded Insulation, Bonded Roof Cover 11-14 3B Structural concrete New or Reroof (Tear -Off) F Non -Insulated, Bonded Roof Cover 14 4A LWIC New or Reroof (Tear -Off) A-1 Bonded Insulation, Bonded Roof Cover 15-16 4B LWIC New or Reroof (Tear -Oft) A-2 Mech: Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover 16 4C LWIC New or Reroof (Tear -Off) E Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover 17-19 SA CWF New or Reroof (Tear -Off) A-1 Bonded Insulation, Bonded Roof Cover 20 5B CWF New, Reroof (Tear -Off) or Recover A-2 Mech., Attached Anchor Sheet,.Bonded Insulation, Bonded Roof Cover 21 5C CWF New, Reroof (Tear -Off) or Recover B Mech. Attached Base Insulation, Bonded Top Insulation, Bonded Roof Cover 22 51) CWF New, Reroof (Tear -Off) or Recover C Mech. Attached Insulation, Bonded Roof Cover 22 SE CWF New, Reroof (Tear -Off) or Recover E Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover 22 6A Gypsum New or Reroof (Tear -Off) A-1 Bonded Insulation, Bonded Roof Cover 23 68 Gypsum New, Reroof (Tear -Off) or Recover A-2 Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover 24 6C Gypsum New, Reroof (Tear -Off) or Recover C Mech. Attached Insulation, Bonded Roof Cover 24 6D Gypsum New, Reroof (Tear -Off) or Recover E Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover 24 7A Various Recover A-1 Bonded Insulation, Bonded Roof Cover 25-26 78 Various Recover F Non -Insulated, Bonded Base Sheet, Bonded Roof Cover 26 The following notes apply to the systems outlined herein: 1. The roof system'evaluation herein pertains to above -deck roof components. Roof decks and structural members shall be in accordance with FBC requirements to the satisfaction of the Authority Having Jurisdiction. Load resistance of the roof deck shall be documented through proper codified and/or FBC Approval documentation. 2. Insulation / base sheet fasteners shall be of sufficient length for the following deck engagement: ➢ Wood: Minimum 0.75-inch penetration. ➢ Steel: Minimum 0.75-Inch penetration and engage the top flute of the steel deck. D Structural concrete: Minimum 1-inch embedment into pilot hole in accordance with fastener manufacturer's published Installation instructions. 3. Unless otherwise noted, insulation may be any one layer or combination of polyisocyanurate, polystyrene, wood fiberboard, perlite, gypsum -based roof board or mineral -wool roof board that meets the QA requirements of F.A.C. Rule 61G2D-3 and is documented as meeting FBC 1505.1 and, for foam plastic, FBC Chapter 26, when installed with the roof cover. Exterior Research and Design, I.I.C. d/b/a Trfnityl ERD Evaluation Report A42970.10.12-R2 for FL16027-R2 Certificate of Authorization 49503 6' EDITION (2017) FBC NON.HVHZ EVALUATION Revision 2: 09/25/2017 Prepared by: Robert Nieminen, PE-59166 TRI-BUILT Modified Bitumen Roof Systems; (800) 516-1485 Appendix 1, Page 1 of 26 TRINITY I ERD Minimum 200 psi, minimum 2-inch thick lightweight Insulating concrete may be substituted for rigid Insulation board for System Type D (mechanically attached base sheet, bonded roof cover), whereby the base sheet fasteners are installed through the LWIC to engage the structural steel or concrete deck. The structural deck shall be of equal or greaterconfiguration to the steel and concrete deck listings. Roof decks and structural members shall be in accordance with FBC requirements to the satisfaction of the Authority Having Jurisdiction. Load resistance of the roof deck shall be documented through proper codified and/or FBC Approval documentation. S. Preliminary insulation attachment for System.Type D: Unless otherwise noted, refer to Section 2.2.10.1.3 of FM Loss Prevention Data Sheet 1-29 (January 2016). 6. Unless otherwise noted, Insulation adhesive application rates are as follows. Ribbon or bead width -is at the time of application; the ribbons/beads shall expand as noted in the manufacturer's published instructions. ➢ HA (HA): Full coverage at25-30 Ibs/square. ➢ Dow INSTA STIK Quik Set Insulation Adhesive (D-15): Continuous 0.75 to 1-inch wide ribbons,12-inch o.c. ➢ Millennium One Step Foamable Adhesive (M-OSFA): Continuous 0.25 to 0.5-inch wide.ribbons,l2-inch o.c. ➢ OMG'OlyBond 500 (08500): Continuous0.75 to 1-Inch wide ribbons, 12-inch o.c. (PaceCart or SpotShot). Note: OlyBond Green may be used where OlyBond 500 Is referenced. OlyBond Classic (OB Classic): Full coverage at 1 gal/square. ➢ ICP Adhesive & Sealants CR-20: Continuous 2.5-3.5-inch wide ribbons,12-inch o.c. ➢ Note: When multiple loyers(s) of insulation and/or coverboard are Installed In ribbon -applied adhesive, adhesive ribbons shall be staggered from layer -to -layer a distance of one-half the ribbon spacing. ➢ Note: The maximum edge distance from the adhesive ribbon to the edge of thelnsulatioahoard-sholl.be_not.less-than-one-half-the-specified ribbons -spacing. Unless otherwise noted, all insulations are flat stock or taper board.of the minimum thickness noted. Tapered polyisocyanurate at the following thickness limitations may be substituted with the following Maximum Design Pressure(MDP) limitations. In no case shall these values be used 'to'increase' the MDP listings In the tables; rather If MOP listing below meets or exceeds that listed fora particular system In the tables, then the thinner board listed below maybe used as a drop -in for the equivalent thicker material listed in the table: Millennium One Step Foamable Adhesive (M-OSFA): MDP -157.5 psf (Min. 0.5-Inch thick) OMG OlyBond 500 (OB500): MDP -45.0 psf (Min. 0.5-Inch thick Multi -Max FA-3) ➢ OMG OlyBond 500 (013500): MDP -187.5 psf (Min. 0.5-Inch thick ISO 95+ GQ OMG OlyBond 500 (OB500): MDP -315.0 psf (Min. 0.5-inch thick ENRGY 3) ➢ OMG OlyBond 500 (OB500): MDP -487.5 psf .(Min. 0.5-InchthIck.ACFoam II) ➢ ICP Adhesive &Sealants ClIwW: MDP -117.5 psf (Mln.1.0-inchthick) 8. Bonded polylsocyanurate Insulation boards shall be maximum 4 x 4 ft. 9. For mechanically attached components or partially bonded insulation, the maximum design pressure for the selected assembly shall meet or exceed the Zone 1 design pressure determined in accordance with FBC Chapter 16, and Zones 2 and 3 shall employ an attachment density designed by a qualified design professional to resist the elevated pressure criteria. Commonly used methods are ANSI/SPRI WDl, FM Loss Prevention Data Sheet 1-29, Roofing Application Standard RAS 117 and Roofing Application Standard RAS 137. Assemblies marked with an asterisk* carry the limitations set forth In Section 2.2.10.1 of FM Loss Prevention Data Sheet 1-29 (January 2016) forZone 2/3 enhancements. 10. For fully bonded assemblies, the maximum design pressure for the selected. assembly shall meet or exceed critical design pressure determined in accordance with FBC Chapter 16, and no rational analysis is permitted. 11. For mechanically attached components over existing decks, fasteners shall be tested in the existing deck for withdrawal resistance. A qualified design professional shall review the data for comparison to the minimum requirements for the system. Testing and analysis shall be In accordance.with ANSI%SPRI FX-1 or Testing Application Standard TAS 105. 12. For existing substrates in a bonded recover or re -roof Installation, the existing roof surface or existing roof deck shall be examined for compatibility and bond performance with the selected adhesive, and the existing roof system (for recover) shall be capable of resisting project design pressures on Its own merit to the satisfaction of the Authority Having Jurisdiction, as documented through field uplift testing in accordance with ANSI/SPRI IA-1, ASTM E907, FM Loss Prevention Data Sheet 1-52 or Testing Application Standard TAS 124. 13. For Recover Applications using System Type D, the insulation is optional; however, the existing roof system shall be suitable for a recover application. 14. Lightweight Insulating Concrete (LWC) shall be cast in accordance with FBC Section 1917 to the satisfaction of the Authority Having Jurisdiction. For systems where specific LWC is referenced, refer to current LWC Product Approval for specific deck construction and limitations. For systems where specific LWC is not referenced, the minimum design mix shall be 300 psi. In all cases, the minimum top -coat thickness is 2-inches. For LWC over structural concrete, reference is made to FBC Section 1917.4.1, Point 1. Exterior Research and Design, U.C. d/b/a Trinity) ERD Evaluation Report A42970.10.12-112 for FL36027-112 Certificate of Authorization #9503 6TM EDITION (2017) FBC NON-HVHZ EVALUATION Revision 2: 09/25/2017 Prepared by: Robert Nieminen, PE-59166 TRI-BUILT Modified Bitumen Roof Systems; (900) 516-1485 Appendix 1, Page 2 of 26 JTRINITY ERD 15. Unless otherwise noted, refer to the following references for bonded base, ply or cap sheet applications. TABLE 1 TRI BUILT RooF CovERs Reference Layer Material Application BP -AA Base Ply FBC Approved ASTM D4601, Type 11 HA at 20-40 Ibs/square Ply FBC Approved ASTM D2178, Type IV or VI (Base and Ply sheets,.Asphalt-Applied) SBS-AA Cap Ply TriBuIltSBS Granular HA at20.40lbs/square (SBS, Asphalt -Applied). SBS-TA (SBS, Torch -Applied) Cap Ply TriBuiltS85 Granular Torch -Applied SBS-SA Base Ply TriBuilt SA SBS Base (SBS, Self -Adhering) Self -Adhering Cap Ply TriBuilt SA SBS Cap APP-TA Base Ply or Ply I TrlBUIIt APP Smooth Torch -Applied -Cap Ply TriBuilt APP Smooth, TriBuilt Granular APP,-Torch-A lied - ( pp }— APP-SA Cap Ply TriBuilt SA APP Cap Self -Adhering (APP, Self -Adhering) 16. Vapor barrier options for use over structural concrete deck followed by adhered insulation carry the following Maximum Design Pressure (MDP) limitations. The lesser of the MDP listings below vs, those in Table 3A applies: •VAPORBARRIER,DPTIONS;STRUCTURAL;;CONCRETEDECRpADHEREDINSUWTIONPEnTABLE3A:, Option # Primer Vapor Barrier Insulation Adhesive MDP (psf) Type Attach VB-1. ASTM D41 TriBullt SASBS Base Self -Adhering Inta-Stik or CR-20,12-Inch o.c. -60.0 VB-2'. ASTM D41 TriBuilt SA SBS Cap Self -Adhering Insta-Stik,12-inch o.c. -75.0 VB-3. ASTM D41 TriBuilt SA SBS Cap Self -Adhering Millennium One Step Foamable Adhesive,12-inch o.c. -157.5 VB-4. ASTM D41 'TdBuilt SA SBS Cap Self -Adhering CR-20,12-inch o.c. -270.0 VB-S. ASTM D41 TriBuilt SA SBS Base Self -Adhering Millennium One Step Foamable-Adhesive, Millennium PG-1 Pump Grade Adhesive, OlyBond 500 or CR-20, 12-inch o.c. -290.0 17. Dens Deck shall be field -primed with PG100 prior to self -adhering membrane application. Refer to tables herein for other priming requirements. 18. "MDP" = Maximum Design Pressure is the result of testing for wind load resistance based on allowable wind loads. Refer to FBC 1609 for determination of design wind loads. Exterior Research and Design, I.I.C. d/b/a Trinity) ERD Evaluation Report A42970.10.12-R2 for FL16027-RZ Certificate of Authorization 99503 6"' EDITION (2017) FBC NON-HVH2 EVALUATION Revision 2: 09/25/2017 Prepared by: Robert Nieminen, PE-59166 TRI-BUILT Modified Bitumen Roof Systems; (800) 516-1485 Appendix 1, Page 3 of 26 �.1 I RINITY I ERD - � ` . � ' � r � T LE lE-2 WOOD DECKS=NEW CONSTRUCTION, REROOF (TeAR OFF) oR RecoveR r - ` SYSTEM TYPE E, 'NON^INSULATED, MECHANICALLY ATTACHED BASE SHEET, BONDED.RQ F COVER System Base Sheet Roof Cover (Note 15) MDP No. Deck,(Note 1) (Psfl Base Fasteners Attach Base Ply Cap Ply Min.19/32-inch Polyglass Elastobase, Polyglass Elastobase OMG Flat Bottom. Plates (square) with 12-inch o.c. in 4-Inch lap and 12-inch (Optional) One or W-1 plywood at max. CertalnTeed , PolyPolyglass G2 Base, Roofgrip #1.4, Dekfast Hex with Dekfast #14 o.c. in two, equally spaced, staggered more BP -AA or SBS-AA, SBS- -52.5 24inch spans Glasbase firestone MB Base„JM Perma- or TruFast MP-3 with TruFast HD center rows APP-TA TA, APP-TA ply 28,.Tamko Glass Base or GAFGLAS #75 Min. 19/32-inch Polygiass Elastobase or Polyglass Dekfast Hex with Dekfast #14 or TruFast MP -One 12-inch o.c. In lap and 12-inch or more SBS- SBS-SAAPP- , W-2 plywood at max. Elastobase Poly with poly top surface 3 with TruFast HD o.c. in two, equally spaced, staggered SA SA; SBS-TA or -$2.5 * 24inch spans center rows APP-TA Min.19/32-Inch Polyglass Elastobase or Polyglass OMG Flat Bottom Plates (square) with 12-Inch o.c: In 4-Inch lap and 12-inch (Optional) One or SBS-AA, SBS- W-3— -plywood atmax Elastobase Poly Roofgrip #12 -o:c-.In-two,-equallyspaced� staggered— -more BP-AA-or— TA, APP TA --60:0— 24=inch spans center rows APP-TA Min. 19/32-Inch Polyglass Elastobase or Polyglass OM6 Flat Bottom Plates (square) with 12-Inch o.c.'in 4-Inch. lap and 12-inch One or more SBS-SA, APP- W-4 plywood at max. Elastobase Poly with poly top surface Roofgrip 012 o.c. In two, equally spaced, staggered SA SA, SBS-TA or -60.0 24-inch spans center rows APP=TA' •" TABLE iF :WOOD DECKS NEW CONSTRUCTION oR RERQOF (TFeiR-OFF) r SYSTEM TYPE F. NOWINSULATED, BONDED ;ROOF COVER System Deck Primer Roof Cover (Note 15) MDP Joint Treatment Base Ply Ply CapTly: No. (PA �^ z_ Min .15/32=Inch plywood> t {Optional),ASTM.D41 None i SBS-SA,, $(Optonal) SB5 SA Sri t ._SBS SA .APP SA;:S85 TA. --- '� _90d0�,� - ;at max 24inch spans Y.- v�T APP TA_,, ? orAPP TA i W-6 Min.15/32=Inch plywood (Optional) ASTM D41 Plywood joints are covered with 4-inch wide strips ofTriBUiit SA Tri Built SA SBS Base (Optional) SBS=SA'or •SBS-SA, APP-SA, SBS­TA -97.5 at max. 24inch spans SBS Base, rolled into place to create continuous,bond. APP-TA orAPP-TA Exterior Research and Design, I.I.C. d/b/a Trinity) ERD Evaluation Report A42970.10.12-R2 for FL16027-112 Certificate of Authorization #9503 6T" EDITION (2017) FBC NON-HVHZ EVALUATION Revision 2: 09/25/2017 Prepared by: Robert Nieminen, PE-59166 TRI-BUILT Modified Bitumen Roof Systems; (800) 516-1485 Appendix 1, Page 8 of 26