HomeMy WebLinkAboutPRODUCT APPROVAL ROOFING UNDERLAYMENTSFlorida Building Code Online
e
BCIS Home 1 Login i- User Registration S Hot 1,
b
d
a
Product Approval
r
USER, Public User
Product Approval Menu > Product orAoolitaUon Sear
FL #
Application Type
Code Version
Application Status
Comments
Archived
Product Manufacturer
Address/Phone/Email
Authorized Signature
Technical Representative
Address/Phone/Email
Quality Assurance Representative
Address/Phone/Email
Category
Subcategory
Compliance Method
1 Florida Engineer or Architect Name who d
the Evaluation Report
{ Florida Ucense
i Quality Assurance Entity
i
i
Quality Assurance Contract Expiration Dal
Validated By
Certificate.of Independence
Referenced Standard and Year (of
Equivalence of Product Standards
Certified By
Sections from the Code
SCANNED
By"a
CiB Iwiprfilvltv '
Submit Surcharge ' Stats & Facts Publications FBC Staff• SCIS Site Map 1, Unks j Search.
h > Aoolication List > Application Detail
FL16048-116 THESE PLANS AND ALL PROPOSED WORK
2017
Revision
eviion' ARE SUBJECT TO ANY CORRECTIONS
Approved REQUIRED BY FIELD INSPECTORS THAT.
�1MY Bri NECE6 °CRY IN 9RDER� TO :w
�i`fH nI�W�PI�, CODES:;
Tri-Built Materials Group, LLC
PO Box 70
Rutherford, NJ 07070
(800) 516-1485
david.rujz@tribuiltmg.com
David Ruiz
david.rulz@tribuiltmg.com
David Ruiz
250 Route 17 North
East Rutherford, NJ'07073
(201)842-2449
david.rulz@tribuiltmaterialsgroup.com
Roofing
Underlayments
Evaluation. Report from a Florida Registered Architect or a_ Licensed
Florida Professional Engineer
IJ Evaluation Report - Hardcopy Received
Robert Nieminen
PE-59166
UL LLC
07/18/2020
John W. Knezevich, PE.
'IV: Validation Checklist - Hardcopy Received
FL16048 R6 COI 2017 01 COT Nieminen odf
Standard
Year
ASTM D1970
2015
ASTM G155
2005
FM 4474
2011
FRSA/TRI April 2012 (04-12)
2012
UL 1897
2012
https://www.floridabuilding.org/pr/pr_app
1/12/2018
i
Florida Building Code Online
Page 2 of 2
Product Approval Method
Date Submitted
Date "Validated
Date Pending FBC Approval
Date Approved
Summary of Products
Method 1 Option D
09/25/2017
10/01/2017
16/03/2017
12/12/2017
FL #
Model, Number
or Name
Description
16048.1
TRI-BUILT Roof
Underlayments
Self -adhering,. modified bitumen roof underlayments
Limits of Use
Installation Instructions
Approved for use,in HVHZ: No
FL16048 R6 II 2017 09 FINAL ER TRI-
Approved'for use outside HVHZ: Yes'
BUILT UNDERLAYMENTS F1_16048-116 odf
Impact Resistant: N/A
Verified. By: Robert Nieminen PE-59166
Design Pressure: +N/A/-1S0
Created by Independent Third "Party: Yes
Otheir:1.) The design pressure noted
herein pertains to use
Evaluation. Reports
of foam -on the systems overtop the self
-adhering
FL16048 R6 AE 2017 09 FINAL ER TRI-
underlayment for one particular application.
See. ER Section
BUILT UNDERLAYMENTS FL16048-R6 odf
5.6.4 for details. 2.) Refer to ER Section
5 for other Limits of
Created by Independent Third Party: Yes
Use.
Back, Next
C tic 1 2601 Blair Stone Road Tallahassee FL 32399 Phone. 850-487=4824
The State of Florida is an
AA/EEO employ ea I`- -oht 2007-2013 State or Florida :: Privacy Statement•: Accessibility Statement :: Refund Statement
Under Florida law, email addresses are, public rdIIords. If you do not want your a-mall"address released In response to a public -records request, do not send
electronic mall to this entity. instead, contact the officeby phone or by traditional mail. IP"y6u have any questions, please contact 8S0.487.139S. *Pursuant to
Section 455.275(1), Florida Statutes, effectiveIIctober 1, 2012,"licensees licensed" under Chapter 455, F.S. must provide the Department with an email address if
they have one. The emails provided may be used for official communication with the licensee. However email addresses are public record. If you do not wish to
supply a -personal address, please provide the'Department with an email address which can be made avaliable to. the public. To determine if you are a licensee under
Chapter 455j.S.,. please dick here.
Prod�iucctt Approval Accepts:
®®a'cRE
Credit
Safe
securiI:ymEr R.ICS
https://www.floridabuildm org/pr/pr_app dtl.aspx?param=wGFVXQwtDgtFPmdYiND... 1/12/2018
NITY f ERD
TRI-BUILT Materials Group, LLC
PO Box.70
Rutherford, NJ 07010
(800) 516-1485
EXTERIOR RESEARCH & DESIGN, LLC.
Certificate of Authorization #9503
353 CHRISTIAN STREET, UNIT#13
OXFORD, CT 06478
'(203) 262-9245
Evaluation Report A42966.10.12-R6
FL16048-R6
Date of Issuance:10/25/2012
Revision 6: 09/25/2017
SCOPE:
This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of
construction materials in the State of Florida. The documentation submitted has been reviewed by Robert Nieminen,
P.E. for use of the product under the Florida Building Code' and Florida Building Code, Residential Volume. The
products described herein. have been evaluated for compliance with the 6th Edition (2017) Florida Building Code
sections notedherein.
DESCRIPTION: TRI-BUILT Roof Underlayments
LABELING: Labeling shall be in accordance vvitl the requirements the Accredited Quality Assurance: Agency noted
herein:
CONTINUED COMPLIANCE: This Evaluation Report 1
Quality Assurance documentation changes, or
this Evaluation Report by the named client c
changes or the referenced Quality Assurance di
Evaluation Report relative to updated Code regi
ADVERTISEMENT: The Evaluation Report number
advertising literature. If any portion of the Eval
INSPECTION: Upon request, a copy of this entire I
its distributors and shall .be available for inspect
This Evaluation Report consists of pages l throu
Prepared by
Robert J.M. Nieminen, P.E.
Florida Registration No. 59166, Florida DCA ANE1983
CERTIFICATION OF INDEPENDENCE:
1. Trinity]ERD does not have, nor does it intend to
distributing. products it evaluates.
2. Trinity] ERD is not'owned, operated or controlled bi
3. Robert-Nieminen, P.E. does not have nor will acqui
which the evaluation reports are being issued..
4. Robert Nieminen, .P.E. does nothave, nor will acqu
product.
S. This is a building code evaluation. Neither Trinity
project on which this Evaluation Report, or previot
specifically for that purpose.
valid until such time as the named product(s) changes, the referenced
ovisions of the Code that relate to the product change. Acceptance of
nstitutes 'agreement to notify Robert Nieminen, P.E. if the product
cumeritation changes. Trinity) ERD requires a complete review of this
irements with each Code Cycle.
3receded by the words "TrinityI ERD Evaluated" may be displayed in
ation Report is displayed, then it shall be done in its entirety.
valuation Report shall be provided to the user by the manufacturer or
)n at the job site at the request of the Building Official.
:h 6.
The Facsimile seal appearingwas authorized by RobertNieminen,
P.E.on09/25/2017. This does not serve as an'electronically signed
document.
acquire or will it acquire, a financial interest in any company manufacturing or
any company manufacturing or distributing products it evaluates.
e, a financial interest in any company manufacturing.or distributing products for
re, a financial interest in any other entity involved in the approval process of the
ERD nor Robert Nieminen, R.E. are, in any way, the Designer of Record for any
i versions thereof, is/was used for permitting or design guidance unless retained
C)o
--,l TRINITYIERD
ROOFING COMPONENT EVALUATION:.
1.
SCOPE:
Product Category: Roofing
Sub -Category: Underlayment
Compliance Statement: TRI-BUILT Roofj Underlayments, as produced by TRI-BUILT Materials Group, LLC, have
demonstrated compliance with the followig sections of the 6th Edition (2017) Florida Building Code through testing
in accordance with the following Standards). Compliance is subject to the Installation Requirements and Limitations /
Conditions of Use set forth herein.
2. STANDARDS:
Section
1504.3.1
1504.3.1
1504.6
1507.2.4 /1507.1.1,1507.2.9:2
1507.3:3.
3.
REFERENCES:
Wind
Wind
Accelerated Weathering
Physical Properties
Physical Properties
Entity
Exami
ERD (TST6049)
Physical
PFiysical
Physical
Physical
Physical
Physical
Physical
Physical
Physical
Physical
4. PRODUCT DESCRIPTION:
4.1 Tri-Built Sand-11 SA Shingle Ur
modified bitumen roof underlay
4.2 Tri-Built S/A HT TU Underlaym
bitumen roof underlayment; me
4.3 Tri-Built Smooth HT S/A 'Une
modified bitumen roof underlay
5. LIMITATIONS:
5.1 This is a building code evaluati
Designer of Record for any proj
used for permitting or design gu'
5.2 This Evaluation Report is not for
5.3 Fire Classification is not part c
Directory for fire ratingsof this r
es
Weathering
Standard
es
Weathering
Standard
Year
FM 4474
2011
OL 1897
2012
ASTM G155
2005
ASTM D1970
2015
FRSA/TRI April 2012 (04-12)
2012
Reference
Date
S40540.02.13-1
02/19/2013
S40540.11.13
11/19/2013
S40540.03.14
03/26/2014
S44870.04.14-2
04/02/2014
S44870:04.14-3
04/02/2014
S44870.04A4-1
04/10/2014
S44870.04.14-4
04/10/2014
S43530.02.14-1-R1
05/14/2014
543530.05.14
05/28/2014
540540.10.14
10/31/2014
SC7645.02.15
02/13/2015
SC8520.04.15
05/27/2015
SC1.4045.05.17-R1
06/07/2017
Multiple-Listing'R16814
12/10/2015
Service Confirmation
Exp. 07/18/2020
•layment is a self -adhering, glass -mat reinforced, sand -surfaced, SBS
it, with a 36-inch sheet width; meets ASTM D1970.
is a self -adhering, non -woven polyester fabric surfaced, SBS modified
ASTM D1970 and FRSA/TRl April 2012.
3yment is a self -adhering, glass -mat reinforced, film -surfaced, SBS
it; meets ASTM D1970.
. Neither Trinifty IERD nor Robert Nieminen, P.E. are, in any way, the
t on which this Evaluation Report; or previous versions thereof, is/was
ince unless retained specifically for that purpose.
e in FBC HVHZ jurisdictions.
this. Evaluation Report; refer to current Approved Roofing Materials
duct.
Exterior Research and Design, LLC. Evaluation Report A4296010.12-R6
certificate ojAuthorization #95o3 6T"'EDITION (2017) FBC NON-HVHZ EVALUATION FL16048-R6
TRI-BUILT Roof Underlayments; (860) 516-1485 Revision 6:09/25/2017
Page 2 of 6
5.4 TRI-BUILT Roof Underlaymei
specifically referenced within
Authority Having. J urisdiction f
prepared roof covering.
5.5 Allowable Roof Covers:
\! TRINITY I ERD
may be used with any prepared roof cover where the product is
3C approval documents. If not listed, a request may be made to the
approval based on this evaluation combined with supporting data for the
I TABLE A. ROOF COVER,OPT IONS
Underlayment
Asphalt
Shingles
NaI1-Un Tile
Foam -Ole
Ti
Metal
Wood Shakes
Slate
&Shinglesn
Tri-Built Sand-R SA Shingle
Underlayment
Yes
No
No
No
Yes
Yes
Tri-Built S/A HT TU
Yes
Underlayment
Yes
Yes
See5.5.1
Yes
Yes
Yes
Tri-Built Smo`gth Hf 5/A?
Underla merit
k_ Y
Yes.- .,
No
No
��:y ;
Yes
5.5.1 "Foam -On Tile" is limited to use of the following Approved the adhesives / underlavment rnmhinntinne
UBLE 1A:;ALLoWABLE
TILE ADHESIVE:/ UNDERLAYMENT COMBINATIONS)
Adhesive
Florida
Product Approval
Underlayments
ICP Adhesives Polyset° AH-160
I
FL6332
Tri-BuiltS/A HT TU Underlayment
DowTileBond'"
I
FL22525
Tri-Built S/A HT TU Underlayment
5.6 Allowable Substrates:
5.6.1 Direct -Bond to Deck:
Tri-Built Sand-R SA Shingle Unc
Underlayment applied to:
➢ Plywood; ASTM D41 prime(
primed Southern Yellow Pin
While not required over plywoo
recommends priming the deck
TRI-BUILT Materials Group; LLB
OSB prior to installation of the s
5.6.2 Bond -to -Insulation:
Tri-Built S/A HT TU Underlayment or Tri-Built Smooth HT S/A
plywood; OSB; ASTM D41 primed OSB; Southern Yellow Pine; ASTM D41
ASTM D41 primed structural concrete.
OSB or Southern Yellow Pine substrates, TRI-BUILT Materials Group, LLC
the final roof cover is not slated for installation. within 24 hours. Note:
requires tongue -and -groove board decking be covered with plywood or
f-adhering underlavment.
Tri-Bu(It Sand-R SA Shingle Underlayment, Tri-Built S/A HT TU Underlayment, or Tri-Built Smooth HT S/A
Underlayment applied to:
➢ Dens Deck Prime; SECUROCK Gypsum -Fiber Roof Board.
For installation under mechanically attached prepared roof coverings, insulation shall be attached per
minimum requirements of the prepared roof covering manufacturer's Product Approval. For installations
under foam -on tile systems (TrI�i-Built S/A HT TU Underlayment only), insulation attachment shall be
designed by a qualified design p1-ofessional and installed based on testing of the insulation/underlayment
system in accordance with FIVI 4474, Appendix D orTAS 114, Appendix J.
1 Refer to Tile Manufacturer's or Adhesive
Exterior Research and Design, I.I.C.
Certificate afAuthorizotion #9503
Manufactturer's Florida Product Approval for Overturning Moment Resistance Performance.
6' EDITION (2017) FBC NON-HVHZ EVALUATION Evaluation Report A42960.10.12-R6FL16048-R6
TRI-BUILT Roof Underlayments; (800) 516-1485 Revision 6: 09/25/2017
Page 3 of 6
5.6.3
5.6.4
#1
#2
#3
Tri-Built Sand-R SA Shingle Unc
Underlayment applied to:
ASTM D226, Type I or II felt.
J1 KINIIY I ERD
Tri-Built S/A HT TU Underlayment or Tri-Built Smooth HT S/A
For installations under mechanically attached prepared roof coverings, base layer shall be attached per
minimum codified requirements. For installations under foam -on tile systems (Tri-Built S/A HT TU
Underlayment only), base layer shall be attached per minimum requirements of FRSA/TRI April 2012 (04-
12).
does not address wind uplift re
the underlayment forms part c
underlayment systems that are
applications. Maximum Desif
allowable wind loads, and refle
per FBC 1504.9 has already beE
FBC 1609 for determination of c
w-anuuum uebig'ii rte55ure=-4
Deck: Min. 15/32
HavingJurisc
Primer: (Optional) A!
Underlayment: Tri-Built S/A
Deck: Structural c(
Jurisdiction.
Primer: Soprema Ela,
Underlayment: Tri-Built S/A
Deck: Min.15/32-in
requirements
Deck Preparation: Plywood shal
adhesion. All
splinters and i
Primer: (Optional) RE!
Underlayment: Tri-Built S/A
roller and/or
#4 Maximum Desi n Pressure = =61[
Deck: Min. 19/32-i
Having Jurisd
Base Sheet: Soprema Sop
and tin caps I
equally space
Underlayment: Tri-Built S/A
ant Systems in Foam -On Tile Applications: FRSA/TRI April 2012 (04-12)
stance of all underlayment systems beneath foam -on tile systems, where
the load -path. The following wind uplift limitations -apply to direct -deck
of addressed in FRSA/TRI April 2012 (04-12) and are used in foam -on file
Pressure is the result of testing, for wind load resistance based on
s the ultimate passing pressure divided by 2 (the 2 to 1 margin of safety
applied). Refer to FRSA/TRI April 2012 (04-12), Appendix A, Table 1A or
!sign wind pressures.
plywood to meet project requirements to satisfaction of Authority
in.
D41 or RESISTO EXTERIOR PRIMER
.0 Underlayment, self -adhered:
to meet project requirements to satisfaction of Authority Having
:ol 600c
TU Underlayment, self -adhered.
:h APA-rated BCX plywood (may be installed C-side up) to meet project
:o satisfaction of Authority Having Jurisdiction.
be thoroughly cleaned to remove dust and debris that may inhibit
sheathing fasteners shall be driven flush with the. surface. All sharp
rood projections shall be removed/sanded.
STO EXTERIOR PRIMER
IT TU Underlayment, self -adhered, shall be thoroughly roll using hand
veighted roller to ensure there are no voids, and ensure there are no
at side and end -laps.
plywood to meet project requirements to satisfaction of Authority
i-G or Modified Sopra-G mechanically attached with nails (FBC 1517.5.1)
BC 1517.5.2) spaced 6-inch o.c. at the 4-inch laps and 6-inch o.c. in three,
rows.in the center of the sheet.
r TU Underlayment, self -adhered.
Exterior Research and Design, LLC: Evaluation Report A42960.10.12-R6
Certificate of Authorization #9503 6' EDITION (2017) F13C NON-HVHZ EVALUATION FL16048-R6
TRI-BUILT Roof Underlayments; (800) 516-1485 Revision 6: 09/25/2017
Page 4 of 6
Q'TRINITYIERD
5.6.4.1 For mechanically attached Base Sheet, the maximum design pressure for the selected assembly shall meet
or exceed that required unifier FRSA/TRI April 2012 (04-12), Appendix A, Table 14.
Alternatively, the maximum design pressure for the selected assembly shall meet or exceed the Zone 1
design pressure determined in accordance with FBC 1609. In this case, Zones 2 and 3 shall employ an
attachment density designed byl a qualified design professional to resist the elevated pressure criteria.
Commonly used methods are ANSI/SPRI WD1, FM Loss Prevention Data Sheet 1-29 and Roofing
Application Standard RAS 117. Assemblies marked with an asterisk* carry the limitations set forth in
Section 2.2.10.1 of FM Loss Prevention Data Sheet 1-29 (January 2016) for Zone 2/$ enhancements.
5.7 Exposure Limitations•
Tri-Built Sand-R SA Shingle Underlayment or Tri-Built Smooth HT S/A Underlayment shall not be left
exposed for longer than 30-days after installation
Tri-Built S/A HT TU Underlayment shall not be left exposed for longer than 180-days after installation.
5.8 Tile Slippage Limitations (TAS 103 1 er FRSA/TRI April 2012 (04 12))
When loading roof tiles on the unIderlayment in direct -deck tile assemblies, the maximum roof slope shall
be as follows. These slope limitations can only be exceeded by using battens during loading of the roof
tiles.
TABLE 2: TILE SLIPPAGE I.IMmT TIbNS FOR DIRECT_ -DECK TILEINSTALLATIONS
Underlayment Ti fie Profile Staging Method Maximum
Slope
Flat Max. 10-tile stack 6:12
Lugged Max.10-tile stack 5:12
Max.10-tile stack (bottom 2-tile stack
shall be inverted, followed by 8 tiles high 6:12
on slope, as shown below)
Tri-BuiltS/A HTTU
Underlayment
Lugged
r.
Exterior Research and Design, LLC. Evaluation Report A42960.10.12-R6
Certificate of Authorliation #9503 6T" EDITION (2017) FBC NON-HVHZ EVALUATION FL16048-R6
TRI-BUILT Roof Underlayments; (800) 516-1485 Revision 6: 09/25/2017
Page 5 of 6
i
TRINITY I ERD
S. INSTALLATION:
6.1 TRI-BUILT Roof Underlayments shall be installed in accordance with TRI-BUILT Materials Group, LLC
published installation requirements subject to the Limitations set forth in Section 5 herein and the
specifics noted below.
6.2 Re -fasten any loose decking panels, and check for protruding nail heads. Sweep the substrate thoroughly
to remove any dust and debris prjor to application, and prime the substrate (if applicable).
6.3 Tri-Built Sand-R SA Shingle Underlayment Tri-Built S/A HT TU Underlavment or Tri-Built Smooth HT S/A
Underlaxi ent;
6.3.1 Shall be installed in compliance with the requirements for ASTM D1970 underlayment in FBC Table
1507.1.1 for the type of prepare roof covering to be installed.
6.3.2 Non -Tile apmlications: I
While priming is optional, TRI-BUILT Materials Group, LLC recommends priming.the deck if the final roof
cover is not slated for installation within 24 hours.
Apply sheet parallel to the roof edge. Roll out approximately 10 ft of membrane and peel back the first 3
ft of release film.
Adhere the exposed part to the substrate and unroll the remaining membrane as far as possible.
Once the, entire length of membrane is in place, peel -off the release film diagonally while holding the
membrane tight. Firmly roll, broom or hand -press the membrane into place to achieve a bond.
Horizontal seams should be miniImurn 3-inches, configured to shed water. Vertical seams should be 6-
inches and staggered not less than 2-ft from vertical seams in the course below, sealed. in accordance with
TRI-BUILT Materials Group, LLC requirements.
When installing at slopes above 8:12, TRI-BUILT Materials Group, LLC recommends back -nailing in the
overlap area at the top of the sheet at 12-inch o.c.
For Valleys and Ridges: Cut underlayment into 4 to 6 foot lengths. Peel the release paper and center sheet
over valley or ridge. Drape and press sheet into place, working from the center of the valley or ridge in
each direction. For valleys, apply the sheet starting at the lowest point and work upward.
6.3.3 Tile ADDlications (Tri-Built S/A HT Tll IJndarlavmant nnh,l-
Reference is made to FRSA/TRI�April 2012 (04-12) Installation Manual and Table 1 herein, using the
instructions noted above as a gui eline.
For foam -on tile applications; reference is made to. Section S.6:4 herein for wind resistance limitations that
fall outside the scope of FRSA/TRI April 2012.(04-12).
Tile shall be loaded and staged in a manner that prevents tile slippage and/or damage to the
underlayment. See Table 2 herein, and TRI-BUILT Materials Group, LLC published requirements for tile
staging.
7. BUILDING PERMIT REQUIREMENTS:
As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of
this product.
8. MANUFACTURING PLANTS:
Gulfport, MS
9. QUALITY ASSURANCE ENTITY:
UL, LLC—QUA9625; (314) 578-3406; k.chailcellor@us.ul.com
I
- END OF EVALUATION REPORT -
Exterior Research and Design, U.C. Evaluation Report A42960.10.12-R6
Certificate of Authorization #9503 6' EDITIONI (2017) FBC NON-HVHZ EVALUATION FL16048-RG
TRI-BUILT Roof Underlayrnents; (800) 516-1485 Revision 6: 09/25/2017
Page 6 of 6