HomeMy WebLinkAboutBLOWER DOOR TESTj _ \
15 lightyears, Inc
776 Bennett Drive
Longwood, Florida 32750
June 1, 2018
To: Local Building Department
SCANNED
Ely A 15 lightyears
a.
RE: Blower Door Test & Duct Leakage Test Reports
To whom it may concern,
SEP 2 4 2018
Permitting t)e pertment
St. Lucie
COUntyP pL I
This letter is to request that the attached forms be accepted for compliance of the 2017 Florida Building
Code statute R402.4.1.2 Envelope leakage testing (Blower Door Testing) and R403.3.3 Duct testing.
The attached forms were provided by the Florida Building Commission as the accepted forms to be
submitted. These forms are listed on'the 2017 Florida Building Code, Energy Conservation Technical
Assistance Manual, Document Number: TAM-2017-1.0, released February 02, 2018, pages R-78 through
R-80 (page numbers 159-161).
Web link provided for quick access to the TAM document https://tinyuri.com/2017FBC-TAM
These forms meet all three required Residential Energy Efficiency Compliance Paths listed under R401.2,
Prescriptive, Performance, and Energy Rating Index (ERI) paths.
We are working with building departments across Florida to standardized the form submittal process and
would like your department to allow these forms to meet compliance. If there are any issues with
accepting these forms, please reach out to me directly and I will ensure that we submit any specific form
that you will require. Tim Smith (407)-951-3236 tsmith@151ightyears.com
Respectfully,
2
Timothy�th
15 Lightyears, Chief Operations Officer
Energy Technical Advisor
RESNET Quality Assurance Designee
IECC Residential Energy Inspector/ Plans Examiner
Member, Building Officials Association of Florida Member and Code Development Committee
participating member. Also, representative to the Florida Building Commissions, Energy Technical
Advisory Committee for the BOAF- CDC
1 J
Envelope Leakage Test Report (Blower Door Test)
Residential Prescriptive, Performance or ERI Method Compliance
2017 Florida Building Code, Energy Conservation, 6th Edition
S ;,_b
Jurisdiction: w�
Permit #: Ol
I.
Job Information
Builder: 'P `G. �, /�a�zf Community: (jai Lot:
Address: Jr3S3 Unit:
City: Vc,V;a\ V% r State: ��-, Zip: Tict 5-
Air Leakage Test Results Passing. results must meet either the. Performance,Prescriptive, or ERI Method
OPRESCRIPTIVE METHOD -The building or dwelling unit shall be tested and verified as having an air leakage rate,of'not 'exceeding 7 air
changes per hourat a pressure of 0.2 inch w.g (50 pascals) in"Climate Zones 1 and 2.
FORMANCE'or ERI METHOD -The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding °
the selected'ACH(50) value, as shown on FORM R405-2617 (Performance) or.R406-2017 (ERI), section labeled as Infiltration, `'sub-sectionACH50..
ACH(50) specified onform R405-2017 Energy'Calc"(Performance) or R406-2017 (ERI):
2
11 Z X 60 = 12 ep M— _ Method for 611culating building vok me:
CFM(50) Build'Ing Volume ACH(50) O Retrieved from architectural plans: ..'
ASS (Mechanical Ventilation is not required) code software calculated
PASS (with Mechanical Ventilation)
O Field measured and calculated
FAIL
R402.4.1.2 Testing. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported ata pressure or.0.2 inch'.w.g. (50 Pascals).
Testing shall be conducted by either individuals as defined in"section 553.993(5) or (7), Florida Statues, or individuals licensed, as set forth in Section
489.105(3)(f), (g), or (i) or an approved third party Awr_itten report.of the results of the test be signed by the party conducting the testand
provided to the rode official: Testing shall be performed atany;time after creation of all penetrations of the building thermal envelope.
.During testing:..
1.Exteriorwindows .and doors, fireplace and stove doors shall be'close_d, but not sealed, beyond the intended weatherstripping or other infiltration
control measures.
2.0ampers including exhaust, intake, makeup air, back draft and flue dampersshall be closed, but hot sealed beyond intended infiltration Control
measures.
3.Interior doors, if installed at the time of the test, shall be open.
4.Exterior doors for continuous ventilation systems.ar d heat recovery ventilators shall be closed and sealed.
S.Heating and cooling systems, if installed at the time of the test, shall be turned off.
6.Supply and return registers, if installed at the time of the' test, shall be fully open.
Testing Company
Company Name: 15 Lightyears, Inc Phone: (855)438-1515
1 hereby verify that the above Air Leakage results are in accordance with the 2017 6th Edition Florida Building Code Energy
Conservation requirements according to the compliance method selected above.
Signature of Tester: Date of Test:
Printed Name of Tester: Austin Blankenship
License/Certification #: J87RSA Issuing Authority: RESNET
(Copy of License / Certificate of the tester must be attached)
T J
I
Duct Leakage Test Report
Residential Prescriptive, Performance or ERI Method Compliance
2017 Florida Building Code, Energy Conservation, 6th Edition
i
Jurisdiction: 5Permit#:
- Z1646,�j c�.�
Job Information
Builder: I Community: �w `� f .,d/ Lai Lot: 00-7Z
Address: �-3s� �.`��vyNi Unit:
City:, �•� State: Zip:
Duct Leakage Test Results
System 1
5 C cfm25
System 2
cfm25
System 3
cfm25
Sum of any
additional systems
cfm25
Total of all
systems
`' ` cfm25
U.Performance / ERI Method cfm25 (Out or-Fo, W)
(Copy of License / Certificate of the tester must be attached)
Certificate of Achievement
THIS ACKNOWLEDGES THAT
Au-stin--BI-ankenship
HAS MET THE STANDARD REQUIRED BY RESNET, AS A
CERTIFIED RATING FIELD INSPECTOR
Certification Date: 05/07/2018
Certification Expires: 05/07/2021
RFI # J87RSA
-;�f ' L-Z-
Tim Smith,
RESNET Quality Assurance Designee
15 liqh�tyears
RESNET QA Provider # (1998-199)
V
a