Loading...
HomeMy WebLinkAboutCERTIFICATION & LETTER OF COMPLIANCEt�nS OR AJ�JLITYTiACHME�9TS 1, ,gR OR RE Q QR pE CONTRACTOR COPY COPJTR �--- R Ec—El vE® i MW ENGINEERING JUL 10 , INC. Cncr•i�lfir Cnnn.F.�Fi....`�n-........_... LST.Lucie County, Ft r►�?ititing ---- -�M�� 902 NE 1"Street, Ste 2 CANNED Pompano Beach, FL 33060 Ph: 754-333-0877 �fl0�'6PlP'�9I6�� Engineering Certification and Letter of Completio —� ed L�— d 2© 0 Project: Rockwell Residence ST. LUCIE COUNTY BUILDING DIVISION _ 12198 Riverbend Ln REVIEWED FOR COMPLIANCE Port St Lucie, FL REVIEWI� By DATE c PLANS AND PERMIT MUST BE KEP N JOB Permit # SLC 1804-0200 SITE OR NO INSPECTIONS) WI BE MADE Certification: The (13) exterior I h piers were instal p lp led as specified and In general conformance with the approved permit plans. To the best of my knowledge, belief, and professional judgment, those portions of the project outlined a ove meet the requirements of the plans and specifications and all applicable codes i cluding FBC 5t' Ed. (2014) and FBC 6th Ed. (2017). Push Pier Installation Summary THESE PLANS AND ALL PROPOSEU Wulf ARE SUBJECT TO ANY CORRECTIONS REQUIRED BY FIELD INSPECTORS THAT MAY BE NECESSARY IN ORDER TO '1ppn'�ginee II 9 ALL APPLICABj E CODES. �,vp,R1C E. i No. 53895 :• n , STAVE OF w . i 6-27-2018 I Mark E. Weber, PE 53895. Florida Registered Professional Engineer 4ONCEALED FASTEP AflCONTRI. _ CLIENT KENT ROCKWELL PROJECT NAME ROCKWELL RESIDENCE ADDRESS 12198 RIVERBEND LN. PIERS INSTALLED 13 PIER LOCATION DATE LENGTH (FEET) PIt R CAPACITY (TONS) BRACKET LOAD (TONS AND/OR LIFT) 1 08.14.18 31 10 StabOlzed 2 06.14.18 34 10 Stablized 3 06.14.19 33 10 StabBlzed 4 08.14.18 33 10 StabOtzed 5 06.14.18 34 10 StabBized 6 08.14.18 34 10 StabOized 7 06.14.18 34 10 StabBized 8 06.14.18 34 10 StabOlzed 9 06.14.18 31 10 StabUzed 10 06.15.18 19 10 StabOlzed 11 06.15.18 31 10 StabB¢ed 12 06.15.18 34 10 StabOtzed 13 06.15.18 37 10 StabBized E S Qt1 XI—FACNIAE iTS ,) 30"p'CONTRACTOR COP` 5 5 , - fILE COPY RE:COun-- EngineeringEIVED E UQ Zola cie ,p�Certification and Letter Project: Rockwell Residence 12198 Riverbend Ln Port St Lucie, FL Permit # SLC 1804-02 iww ENGINEERING, INC. {Specialty Foundation, Marine & Aquatic Engineering and Inspection 902 NE 1st Street, Ste 2 Pompano Beach, FL 33060 Ph: 754-333-0877 Completion---,, ST. LUCIE COUNTY BUILDING DIV SION REVIEWED FOR COMPLIANCE REVIEW B1Y "' ��' "` DATE< � rfit PLANS AND PERMIT MUST BE K T N JOB SITE OR NO INSPECTIONS) WItIf BE MADE Certification: The (13) exterior push biers were installed as specified and in general conformance with the approved permit plans. To the best of my knowledge, belief, and professional judgment, those portions of the project outlined above meet the requirements of the plans and specifications and all applicable codes including FBC 5th Ed. (2014) and FBC 6th Ed. (2017). THESE PLANS AND ALL PROPOSED WOF ARE SUBJECT TO ANY CORRECTIONS REQUIRED BY FIELD INSPECTORS THAT MAY BE NECESSARY IN ORDER TO COMPLY WITH ALL APPLICABLE CODES MW Engineering, Inc. E. • � .• C E N,,, No. 53895 i • 0 ; STATE OF , 6-27-2018 Mark E. Weber, PE 53895 Florida Registered Professional En leer Push Pier Installation Summary CLIENT KENT ROCKWELL PROJECT NAME ROCKWELL RESIDENCE ADDRESS 121.98 RIVERBEND LN. PIERS INSTALLED 13 PIER LOCATION DATE LENGTH (FEET) PIER CAPACITY (TONS) BRACKET LOAD (TONS AND/OR LIFT) 1 06.14.18 31 10 Stabilized 2 06.14.18 34 10 Stabilized 3 06.14.18 33 10 Stabilized 4 06.14.10 33 10 Stabilized 5 06.14.18 34 10 Stabilized 6 06.14.18 34 10 Stabilized 7 06.14.18 34 10 Stabilized 8 06.14.18 34 10 Stabilized 9 06.14.18 31 10 Stabilized 10 06.15.18 19 10 Stabilized 11 06.15.18 31 10 Stabilized 12 06.15.18 34 10 Stabilized 13 06.15.18 37 10 Stabilized COiNCEALED FASTENERS OR ATi AC ARE THE RESPONSIBILITY OF' CONTRACTOR OR RECORD