HomeMy WebLinkAboutPROJECT SUMMARYa
,,znuar'e, inc.
SCANNI--U
Prepared by:
John Fee
N Squar'e , Inc.
www.nsquareinc.com
TF Toll Free - (866) 562-1759
O Office11- (239) 514-1173
F Fax -t239)514-2273
LicenseGC045302
Prepared) n:
3-5-18
Prepared for.
S Kent Rockwell
H 7723807424
Job location:
12198 Riverbend Lane
Port St. Lucie, FL 34984
Project Summary
Permanently Stabilize Foundation ...........
Total Investment ........................................... :......
Total Contract Price
Deposit Required - 30% .......................................
..........................
Deposit Paid ......................................................
Amount Due Upon Installation .................. `
i........................................................................ $27,909.58
Customer Consent I
N Square, Inc. is the authorized contractor to perform the specified work in this proposal. N Square, Inc. will not proceed with any
alterations from the above specification unless approval has been received from the customer.
Authorized Signature s-� Date 03/05/201,8
Acceptance of Contract— I am/we are aware f and agree to be I I gaily bound by the terms of this Proposal, the attached Job Detail
sheet(s), Disclosures, and the attached Limited Warranty, (together, the "Contract"). You are authorized to-do the work as specified in the.
Contract. I/we will make the payment set forth in this Contract atithe time it is due. I/we will pay your service charge of 1.5% per month
(18% per annum) if my/our account is 30 days or more past due. I/we hereby consent to the exclusive jurisdiction of the state courts in
and for Collier County, FL and/or the US District Court for the Middle District of FL, waive any other venue to which I/we may be entitled
by'domicile or otherwise, and agree to pay any n cessary attorney'Is fees and costs to collect and enforce this Agreement. Any alteration
from the above specificatio s nd r pond price adjustment (if necessary) will be made only at the Customer's request or approval.
This Proposal may be withd n if o c t ithin 30 days.
Customer Signature I
^oTi►i RgtQ HG>n1'`' Date 63 D$', 19,
N Square, Inc. Job Location
2220 Trade Center Way Naples FL 34109 12198 Riverbend Lane Port St. Lucie FL 34984 Page 1/7
3-5-18
Job Details
r
first
N Square, Inc. Job Location 2220 Trade Center Way Naples FL 34109 Page 2/7
12198 Riverbend Lane Port St_ Lucie FL 34984 3-5-18
Job Details (Continued)
Specifications
Install Push Pier(s) to support the foundation as shown on
field conditions. Proposal assumes footings are no more tt
charges will occur through a change order, unless otherwi
or steel plates may be necessary and handled as a change i
conditions and restoring to original position is not guarant
indicated on job drawing Single soil boring on East coast. C
repairing any damage occurring to a private utility line dur
permit expediter fees. Acquire appropriate permits and pe
for permitting the work in this agreement and does not coi
noted in this agreement.
r
Contractor Will
1.) Notify customer of any overages prior to continuing on jo
2.) Record Benchmarks.
3.) All work will be completed in a workmanlike manner in ac
b drawing using a low profile bracket. Final Location of piers) is subject to
i 2' below grade, 8" from foundation wall or 16" thick, if not additional
noted. If cracked footings are observed during underpinning,additional piers
ler. Attempt to lift foundation. Ability to lift foundation is subject to field
!d. Not responsible for any additional damage. Remove and replace concrete
Aractor to coordinate utilities locating service and take responsibility for
installation. Steel I Beam Black 3 feet long Permit fees, permit plans and
,it plans per local building code. Customer understands the permit plans are
:itute that an engineering inspection has or will occur, unless specifically
Customer Will
1.) Remove and replace any landscaping that is in the work are
2.) Provide proper dedicated electrical outlets for all pumps,di
dedicated 20 amp 2 receptacle outlet is required.for a dehumi
3.) Remove all items from work area prior to installation date.1
pumps,filters,heaters,A/C unit(s) and utility lines in work area
4,).Pay for project upon completion to foreman. Customer a&
change orders not included on.t his contract. For permitted pr
is closed
5.) Notify contractor of any changes to property prior to instal
6.) Make contractor aware of any septic systems,underground
for damaged or effected areas.
ing to the standard practices of the industry.
idifiers and other electrical devices to be installed and or removed. A
mer is responsible for removal and replacement of all pool
to installation date.
dges that the final invoice may be subject to customer approved
the customer can hold a 10% retainage may be held until the permit
date.
systems in work area(s). Contractor not responsible
Additional Notes
This agreement is made under, and for all purposes shall be construed and enforced in accordance with and governed by the laws of the
State of FL, excluding its conflict of laws provisions. By signing this Proposal, the customer agrees that this agreement may be amended
only by a writing signed by each of the parties, may not be assigned by me/us without your consent and contains the entire agreement of
the parties with respect to the transactions contemplated hereby and supersedes all prior written and oral agreements. This proposal
assumes footings, are no more than 2' below grade, 8" from foundation wall or 16" thick if not the case additional charges may occur.
Concrete removal to access the pile/pier location is an additional c��arge unless otherwise noted. N Square inc. reserves the right to
choose the type of pier that is used based on soil conditions noted in the soil boring report at no additional cost to the customer. If the soil
boring report shows any signs of a potential sink hole or if a sinkhoie problem has been identified in the past at the property, N Square inc.
reserves the rights to terminate this contract. Customer agrees that any additional permitting/soil boring costs that are deemed
necessary by the proper building authorities are the responsibility of the customer. Customer also understands the permit plans are for
permitting the work in this agreement, the plans in no way constitute that an engineering inspection has or will occur, unless specifically
noted in this agreement. N Square inc will drive all piers to the loads Istated on the permit plans with no additional depth charges.
Product List
N Square, Inc. Job Location
3/7
2220 Trade Center Way Naples FL 34109 12198 Mverbend Lane Port St. Lucie FL 34984 Page 3-5-1818
Product List .(Continued)
Permanently Stabilize Foundation
3" Push Pier, Low Profile Bracket
................................................................................
Lift Procedure
................................................................................
Concrete Remove & Replace
...............................................................
..............
Soil Boring Zone 1 East Coast
.............:...........................
Utilities Coverage
...................................................
Steel I Beam Black 3 feet, Custom 127
..............................................................................
Permits and permit plans East Coast
N Square, Inc.
2220 Trade Center Way Naples FL 34109
I
I
I
Job Location
12198 Riverbend Lane Port St. Lucie FL 34984
Page 4/7
3-5-18
N
Recommendations to Your Project
Lift Settled Foundation
Divert Roof Water Away from Foundation
Permanently Support Slab
Bid Required
Bid Required
Bid Required
Recommendation Notes
Due to the lack of depth or footing with the foundation in the subject room, steel 1-beams will be needed for each pier. Pier locations
have been flagged by John Fee and are acurate for measurement. Customer has been informed that moving the AC unit will be his
responsibility.
N Square, Inc.
2220 Trade Center Way Naples FL 34109
El Is
{ rsf stogy
Job Location
12198 Riverbend Lane Port St Lucie FL 34984
LI
Page 5/7
3-5-18
Limited Warranty
This Limited Warranty ("Warranty") is made in lieu of and excludes all
to the customer ("Customer'). There are no other verbal or written wa
WARRANTIES OF EXPRESS OR IMPLIED MERCHANTABILITY OR FI
warranties, express or implied, and all other' obligations on the part of N Square, Inc ("Contractor')
es. There are no warranties which extend beyond the description on the face hereof, and NO
S FOR A PARTICULAR PURPOSE.
General Terms - For the applicable time periods indicated below, this Warranty is transferable at no charge to future owners of the structure on which the work specified in this
Contract is completed. This Warranty is in effect if the job specified in this Contract Is completed'and, paid in full and, alternatively, is null and void if full payment Is not received.
Contractor does not warrant products not mentioned below, but some of such products may be covered by a manufacturer's warranty. Exclusions From This Warranty - This
Warranty does not cover and Contractor specifically disclaims liability for: 1jiexterior waterproofing; 2) system damage caused by Customer's negligence, misuse, abuse, or
alteration; 3) dust incidental to installation; 4) damage to personal property of any type; 5) utility line breakage; 6) damage caused by mold; 7) failure or delay in performance or
damage caused by acts of God (flood, fire, storm, methane gas, etc.), acts of civil it or military authority, or any other cause outside of its control; 8) damage done during a lifting
operation; 9) basement water seepage; 10) heave or any damages caused by it; and 11) damage caused by lateral movements and forces of hillside creep, land sliding or slumping
of fill soi Is of deep embankments.
Foundation Piers - Helical & Push Piers, Pin Piles
Items for which the Customer is responsible:
Customer is responsible for any finish carpentry repairs, painting repairs, stuc
piping repairs or any underground utilities repairs, etc that may be necessary
trenching or excavating is required, Contractorwill backfill and tamp dirt to tt
excavated settles. Customer is also responsible for any landscaping, reseeding
private utility lines such as electric lines, cable lines, plumbing lines, satellite di
damages due to breakage of any utility lines if the utilities insurance waiver is
repairs. drywall repairs, concrete slab repairs, flooring repairs, paver repairs, coping repairs, pool
ter Contractor's Foundation Pier work is finished unless stated in writing in the Contract. When
best of its ability, however, Customer may need to add additional soil at a later date if the area
and resodding unless stated in writing in the Contract. Customer is responsible for marking any
i cables, propane lines, sprinkler system lines, etc. Customer assumes all responsibility for
;ned, though Contractor will do its best to avoid such damage.
Foundation Piers Warranty:
Contractor warrants that the foundation piers will stabilize the existing foundation against further appreciable vertical settlement in the areas were work was performed for
seventy five (75) years from the date of installation, or else the Contractorwill provide the labor and materials, at no cost to the Customer, to correct the problem with the
foundation piers. Contractordoes notwarrant lifting, leveling, to close cracks, to render doors and windows operational or to move walls back to their original position, but will
do its best to achieve positive results in this regard. Customer should also knowthat the possibility of further damages exists during a lifting operation, and that Contractor is
not responsible for such issues. Customer is responsible for any finish carpentrylrepairs, painting repairs, stucco repairs, drywall repairs; concrete slab repairs, Flooring repairs,
paver repairs, coping repairs, pool piping repairs or any underground utilities repairs, etc.thatmaybe.necessaryafterContractor'sfoundationpierworkisfinishedunlessstated
in writing in the Contract.
Items For Which Customer Is Responsible - Customer is responsible for:1) making full payment to the crew leader upon completion of the work: 2) preparing the work area for
installation; 3) any finish carpentry, painting, paneling, landscaping, etc that may be necessary after Contractor's work is finished: 4) marking any private lines such as satellite
cables, propane lines, sprinkler system lines, etc.; 5) maintaining positive drainageiiawayfrom the repaired wall(s); 6) keeping gutters clean and in good working order; 7) directing
downspouts a sufficient distance away from the repaired wall(s); 8) maintaining proper expansionjoints in concrete slabs that are adjacent to the repaired wall(s); and 9) any
items mentioned in this Contract under "Customer Will" or "Additional Notes."
Crawl Space
Items for which the Customer is responsible:
Customer is responsible for periodic inspections of installed equipment and for ma ntenance of equipment per manufacturer's recommendations. Customer is responsible for
any flooding in the crawl space either from a storm event or a rise of the water table inside the crawl space. Customer is responsible for any finish carpentry repairs, painting
repairs, stucco repairs, drywall repairs, concrete slab repairs, flooring repairs, or aniy underground utilities repairs, etc. that may be necessary after Contractor's Crawl Space
work is finished unless stated in writing in the Contract. I
Clean Space
Contractor warrants the "Clean Space Encapsulation System" will isolate the home �rom the earth in the areas in which the system is installed for a period of twenty-five (25)
years from the date of installation, or else the Contractor will provide the labor and materials, at no cost to the Customer, to correct the problem with the "Clean Space"
installation. The Clean Space Encapsulation system will lower the humidity level in the air, reducing moisture needed for mold growth, however the encapsulation system does
not claim to be a mold mitigation system. For maximum benefit the entire crawl space must be encapsulated. Wet crawl spaces require a drainage system and a sump system to
remedy the problem with water below the Clean Space liner. THIS WARRANTY DOES NOT COVER, AND THE CONTRACTOR SPECIFICALLY DISCLAIMS LIABILITY FOR
WATER DAMAGE TO FLOOR COVERINGS,FURNITURE, STORED ITEMS, FINISH9'DWALLS AND OTHER OBJECTS INSIDE THE CRAWL SPACE Contractor will not be
responsible for any damages caused by mold, to include but not limited to property damage, personal injury, loss of income, emotional distress, death, loss of use, loss of value,
and adverse health effects, or any other effects.
Concrete Repairs-Crawispace
Contractor warrants the concrete repairs in the areas were work was performed for a period of ten (10) years from the date of installation, or else the Contractorwill provide
the labor and materials, at no cost to the Customer, to correct the problem with the concrete repair.
Wood Framing Repairs
The proposed work includes the installation of framing members in the crawlspace. (i.e. joist repairs, ledger installation, beam repair) The new framing
members are for the repairs to the existing framing inside of a crawlspace. The installation of the crawlspace framing members will not change the attitude (i.e. level) of the
existing floor framing structure unless stated in writing in the job proposal. Contractor, warrants the wood framing repairs in the areas were work was performed for a period of
ten (10) years from the date of installation, or else the Contractor will provide the laboll and materials, at no cost to the Customer, to correct the problem with the wood framing
repair.
Pass-Thru Warranties
N Square, Inc. Job Location � Page 6/7
2220 Trade Center Way Naples FL 34109 12198 Riverbe�d Lane Port St. Lucie FL 34984 3-5-18