Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENTNO�le�aaio�g DeVe9op n iiSu80diusg & Code ®Vi�6egi'�a Fort Pierce, FL e 7/2.462-2172 Fax 7 C ER-TRFRUTG OF ` EW CONSIr 'lucirnam SO PERMIT # : l gd'1� C?3 6Z JOB ADDRI 13UILDER/CONTRACTOR: / VICT-A-BUG PEST CONTROL CONTRACTOR: E----- PEST CONTROL LICENSE # o JB1757'5 We, the undersigned, hereby certify that we have p subterranean termites in accordance with the stand Square feet if area treated: —31 Percentage of solution: Date of Treatment: Footing ist Treatment Re -Treat Services n Division n-TF. TREATMENT ITE & PEST CONTROL INC. - ' •etreated the above described construction for irds of the National Pest Control Association. I Chemicals used: DOMINIO��N��2L Total gallons used: —Time of Treatment: __LSla Ist Treatment Re -Treat Pools Driveway - Ist Treatment 1st Treatment _Re -Treat Re Treat perimeter for al Inspection Other ' Iet Treatment le on thejob Re -Treat ure of Exterminator Date Note: There must be a completed form for each each ins treatment or re -treatment inspection or the scheduled Inspeco n,W//ta / fall and a re lnspectlon site to be picked up by the Inspector at time of each �n p fee charged. piociccz.6 Certlflcate of Protective Treatmenn Certificatefor s as each on of required protective treatment lsites. A tCompleted board shall be provided to receive duplicate Treatme Permit files, The Treatment providing a copy for the person the permit Issued to and another copy for the but/ding Certificate shall provide the en n entratlannalnd numbety of the �ofga/loos usedn odestabllsh a ate of the tverifiable reicord of Ion, area treatedll , chemical used, per protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treament she be completed prior to final bullding app Ir to be St �aacae ®aarut<4y a'eqanuree if®o' the �naU °°�pG the it®e�$e�aen seed ¢B�ge� ,applications. placed ®aa the electrical pea nel look cover, poegoo�g 9 7/24/2014 I I I