Subsoil Investigation Report
Prepared by:
wderal
t
E TESTING INC. www. fed-eng.c�rre
Client: Mel-Ry Construction, Inc.
'rf
Contact: Mack Mattos
Address: 10967 S. Ocean Drive
Jensen Beach, FL 34957
Project: Proposed Single Family Home.
Address 2044 Nettles Blvd.
Jensen Beach, FL 34957
Date: . Wednesday, January 1.7, 2018
FILE COPY
Materials Testing j Inspections I Environmental
TESTING INC.
ho OWN FL 33089
Client .Information --------
Project Information ------
General Soil Descriptions
Foundation Recomrnendati
Soil Parameters ---------
Excavations ---------------
Settlement -----------------
.Grading--------------------
Appendices
Soil Boring Log(s)
Project Location
Soil Boring Location(§)
Soil Classifications
Sampling Procedures
Limitations of Liability
Phone 954-784-2941
800-848-1919
Fax 954-784-7875
able of Contents
'------------- --------------- .---------------------- pg. 1
_-------------------------- ---<------------------------- pg. 1
----- - -- .------------. ----------- ------------------- 1
I pg
is----------- ---------------------------------------------- pg. 2
---------------------- ---- --------------------------------- pg. 3
-------------------------------------- ---------------------- pg. 3
-------------------- --------------------------------------- - pg. 4
------------------------------------------------------------- pg. 4
------- =--------------- =---- ------- =---=-------------------- pg. 5
I
I
For Your Information
Our findings in this report are based on soil conditions encountered in the test bore -locations only, proposed structure to
be built, (if available, at this stage), Florida Building Code requirements and standard engineering practices. If your report
is preliminary (i;e. vacant land or building to be°demolished) additional borings are required within the foot print of the
proposed structure once the location & lay6dt of the proposed structure is known.
Please_ read, this report, in its entirety and follow all recommendations. Failure to do so may result in the :permitting
agency (Building Department, etc.) withholding ;the Certificate of Occupancy. This will cause delays and additional
costs: The Permitting Agency will require aI final certification or signing off of the project prior to issuing the Certificate
of Occupancy. All of our recommendations need to be .followed to receive A .final certification from F.E.T., including
densities on each lift, demucking verification,piling inspection, etc., whichever recommendation applies to your project.
I
Please schedule us.at least 24 Hours .in advance , for all "tests and inspections. If you choose to use anotherEngineering
Firm, you must verify they, will provide you with the proper certification. in writing, as outlined in our report, Our firm
will only provide a certification letter if it has verified all work as ,recommended in our report.
i
I
I
i
�f
Construction Material
American Concrete
Miami Dade
Florida Department
Engineering Council
I Institute
I
County
of Transportation
M4TG
Wednesday, January 1:7,2018
Mel-Ry Construction, Inc.
1.0967 S. Ocean Drive
Jensen Beach, FL 34957
Attn.: Mack Mattos
RE: $ubsoil-Investigation
Proposed Single Family Home
2044 Nettles Blvd.
Jensen Beach, FL 34957
Dear Sirs:
Phone 954-784-2941
800448-1919
Fax 954-784-7875
Job Order -Number 18SBO30
Pursuant to yourrequest, Federal Engineering & Testing, Inc. has completed a subsoil investigation on 01/16/2018 at the
above referenced site. The purpose of but 'investigation was to verify subsoil conditions relative to foundation
preparation and.design.
A total of one (1) SPT boring was performed according. to ASTM D4586. drilled down to a depth of fifteen feet (15) and
one (1) DCP boring was performed according to ASTM D=6951 drilled down to.a depth of.fifteen feet (15) below the
existing ground surface. (See `attached field sketch. for locations). The following is a general description of soil stratas for
the subject site:
'Depth,
_
Descnpnon-of Soil's
0"
6"
Topsoil °& Vegetation
6"
Y
.Light Brol�n Sand
3"
5'
`Gray Sand 1with-`Shell Fragments
5'
8'
Pale'Brown;Sand with Shell Fragments
8'
12'
Pale Brown Sand
12'
15'
Gray Sand
i
I
Groundwater table elevation was measured,mmediately at the, completion of each boring and was found at an average
depth of three (3) feet below existing ground surface. Fluctuation in water level should be anticipated. due to seasonal
variations and run off as well as varying ground elevation, construction dewatering and pumping activities in the area.
Site contractor•must familiarize himself with site, -conditions in the event groundwater controls and dewatering is needed.
Surface flooding may result under hurricane conditions and should be taken into consideration in the design of the
project. The contractor shall make sure that Groundwater levels on adjacent properties are not affected by the contractors
dewatering activities. Specialty groundwater; contractors shall'be consulted for all work below the groundwater level.
Wednesday, January 17,2018
2044 Nettles Blvd.
Jensen Beach, FL 34957
Paget
EH6iNEERINO
_ The boring log(s), attached present a' detailed description of the soils encountered at each location. The soil 'stratification
shown on the boring log(s) is based on the examination of the recovered soil samples and interpretation of the driller's
field log(s). It indicates only the approximate boundaries between soil types. The actual transitions between adjacent
soil types may be gradual.
From a geotechnical engineering perspective, the site is suitable for the construction of the proposed structure, provided
that the surface; sand layers are compacted in place and proof rolled. Localized -areas of loose materials, if present, will
become evident during site clearing, grabbing and proof.rolling, and mustbe removed prior'to filling operations.
Based on our understanding of the proposed structure and the information obtained from our field boring log(s); we
recommend the following procedures for foundation design:.
1) Strip the entire footings and building (construction areas ;plus five (5) feet past the outer perimeter of topsoil and
ground vegetation ,(when encountered) down to clean granular material. Any underground structures, utility
lines, root systems and drainage trenches, etc. must be removed in their entirety from beneath the proposed
construction areas. The city arboris i should be contacted prior :to any land clearing to verify compliance with
any local codes.
2) Saturate and compact all construction areaswith a heavy self.propelled vibratory roller to a minimum of 95% of
the ASTM D-1557 modified proctor method. Make a minimum of ten (10) passes with the roller in each
direction.
i
3) Cale should. be taken when using vibration in case. of existing structures in the vicinity of the construction area.
If vibration :cannot, be used for compaction; static compaction may be applied. However, ;in this case, the
compacted layer should, not exceed 6 inches in. thickness.
4) Backfill construction areas to prop r elevation if needed. using,a clean granular material placed in lifts not to
exceed twelve (12) inches in thickness and compacted as:per item 2.
5) Representative samples of the on -site and proposed All material should be collected and tested to deiennine the
classification and compaction characteristics.
6) All construction fill material above -the water table :shall be clean granular soil, free of organics or other
deleterious material, and shall contain no more than twelve (12) percent fines passing a U.S. Standard No. 200
sieve (0.075mm) and have a Unified Soil Classificaiion-.(USCS) designation of GP, GW, GP -GM, OW -GM, SP
or SW: No,particle size greater than three (3) inches shall be used in the top 12 inches of the building pad..
7) Fill Material below the water table shall be washed free draining gravel such as FDOT No..57 stone or
equivalent to- about 12 'inches above the water table unless, dewatering is used. 'When dewatering is used, fill
material shall be clean granular soil, free of'organics or other deleterious material, and shall contain no more
than twelve (12) percent fines passing a U.S. Standard No.. 20.0 sieve.(0.075mm).
Wednesday, January 17; 20,l&
2044 Nettles Blvd.
Jensen .Beach, FL 34957
Page 3
EN6INEERINCa
8) Verify all.:densificatiion procedures br taking an adequate number. of field density tests in each layer of
compacted. material. Density tests shall be performed ,on they slab areas,. footing areas, interior bearing wall
i
footings :and column pad. footings. I his must be scheduled immediately. after Tamp .and Spray and/or
Compaction, but before'Reinforcing -Steel Placement. If reinforcing steel is already in -place, it must be removed
from all areas to be tested prior to performing densities.
9) After the 'installation of any plumbing and electrical piping; we recommend that the disturbed area be
recompacted and additional densities tests be.performed"to verify�proper compaction of the disturbed; areas.
10) All ,of the above Geotechiiieal worl� shall be performed 'under the supervision of Federal Engineering &
Testing's geotecluucalengineer or his representative to verify compliance with our specifications and the
Florida. Building Code. Please call us at 954-784-2941 for scheduling.
11) In the event of existing structures, exit' ting footings or proposed drainage, lines, provisions shall be made by the
structural engineer and site'contractoto, protect all footings from undermining and exposure. The geotechnical
engineer shall be notified of these conditions to evaluate the applicability of his recommendations..
The above foundation recommendations being achieved and verified; it ' is our opinion that the proposed structure be
designed for a shallow 'foundation systemviih a permissible soil bearing pressure not to exceed 2500 RS.F. Building
pad certification requires 'satisfactory completion and verification of all the above foundation recommendations.'
Slabs placed upon compacted fill may be designed'using a.modulus of subgrade reaction value. of 200 pci. The .following
soil parameters shall be used for retaining wall designs:
Soilunit. weight. moist ---- =------ ----------------------------- =-- ----- = =-----=----------------
..Soil unit weight buoyant--------,-------------------------------=------=-------------------------
- Angle of internal friction-
- Active Earth pressure coc
Passive Earth pressure co.
- Angle of wall friction for
- Angle of wall friction for
- Angle of wall friction for
(Ka)------------------------------------------------------
(Kp)---------------------------------------------==-----
/ brick walls------------------------------------- --•.
steel---------=------=----------=--------------=---------
110 pef
48' pcf
300
0.33
3.0
300
20°
15°
Excavations shall not extend within one (1) 'foot of the angle of repose next to existing. footings or structures unless
underpinned. Trenching shall be in compliance with the Florida Building Code, OSHA and Trench Safety Act
requirements. Shorings shall be designed and inspected by Florida licensed professional engineer.
Provisions shall be made by the architect, Ilengineer of record and .contractor to address differential settlements when
tying in new to existing structures. Mixing of different foundation types shall not be used unless provided with
expansion j oints to address 'differential -settl ment:
Wednesday,January 77,:2UJ8
2944 Nettles Blvd.:
Jensen Beach, FL 34957
Page 4
Detailed settlement analysis was beyond the
exploration with our experience with .struciun
these settlements is 0.5 to 1 inch. Due to the
should occur a:s .the loads are applied and shoul
All outside ground surfaces must be sloped ai
waters shall be discharged away from, all build
lines are properly functioning with no leaks in
Regardless of the thoroughness of a genteel
different from -those of the test, ocations; thel
condition between the bore test holes..A site 1
time the soil borings were performed. Once p.'
& Testing, Inc. shall be provided a copy o;
portrayal of subsurface conditions, the site cc
Federal Engineering & Testing Inc., shall be
In accepting this report the client understands
and is. not to be -used for excavating, b.aekfill
with the job site conditions.
"I
�NGINEERINa
scope of this report. Comparing the field test data obtained in this
similar to those proposed for this project, the estimated magnitude of
granular nature ,of the subsurface materials; the foundation, settlements
be virtually negligible by, the end of the building shell completion.
from the structure to avoid water accumulation'and ponding. All rain
foundations. Verify all water, sewer, plumbing, sprinkler and drainage
vicinity of the foundation.
deal exploration, there is always the possibility that conditions, may be
;fore, -Federal Engineering & Testing, Inc. does not guarantee any subsoil
an showing the location of the proposed structure was .iiot provided at the
ns and specifications have been finalized and drawn,. Federal Engineering
'the finalized plans and specifications for review. For a -more accurate
itractor should perform test pits. If different conditions are encountered,
otiied to review the findings and make any recommendations as needed.
hat alI data from the soil borings is intended for foundation. analysis only
rig �or pricing estimates: The site contractor must familiarize themselves
i
Environmental analysis. of the soil materials :is not part of the scope of services. If environmental analysis of the soils is
required, we can provide a proposal .for performing an environmental analysis of the soil materials. For Environmental
due diligence, a Phase I and/or Phase 11 Environmental Site Assessment is recommended.
i
I
As a mutual protection to clients, 'the public and ourselves, all reports are, submitted as the confidential property of
clients; and authorization for publication of"si atements; conclusions or extracts from or regarding our reports is reserved
pending our written approval,:
Federal Engineering & Testing, Inc.:apprec ates the opportunity to be of service to you at this phase of your project.
Please feel free, to contact us if we may be offurther service to you.
I
Sincerely, �� ,o�� yj
P
Keith LeBlanc, P. v
Federal Enginee i sting®F
Florida Reg. No. 5`e�� . •;o
Certificate of Authony'a��•' t�
ONAL
Iliiltl- �
i
I
Wednesday, January 17,29,18
2044 Nettles Blvd.
Jensen Beach, FL34957
Page 5
Appendices
A
A
Ph®ne 9'54-784 2941
'800-848-1919
ed., r a
a TESTING INC. Fax.954-784-7875
0 SW'13th Ave Pomp no [leach, FL'33069 I fed-eng.COM
SPT. Test Boring: Report
client: 16Iel,Ay Construction, Inc'. Date, of Test: January 1.6, 2018
Project: 'Proposed Single.FamilyHom6 Hole.No.: - B4
Address: 2644 Nettles Blvd. Location: See Attached Drawing
Jehsen,Beach, FL,34957
Depth.:(FT)
Soil Descriptions
-Hammer Blows
"N"
1
0" - 6"
Topsoil. & 'Vegetation
3
.2
6
2
6" - 3'
Light Brown Sod
3
4
3
2 5,
3' - 5'
Gray Sand with Shell Fragments
14
4
(
I
9
15
5
12 1`1
24
6
5' - 8'
Pale Brown and with Shell Fragments,
13
1-8.
7
22 20,
43
8
23
1
9
24 20
8' = 0'
Pale Brown Sand
41
21
19
11
A, A
A
12
A
A
13
A A
12'-- 15'
Gray'Sand
A
14 _
I
A
A
15
20 19
'1':6
1'7
18,
19
20
21
22
23'
24
23
,26
_
27
28
I
29
3.0
Water Level:
C
i
2' 10"
I
A =Auger
I
Below Land Surface
i
Arm
Phone 054-784-2941
800-848-1919
& T�.��� moo. Fax 954-784-7875
60 SW 13th Ave Pompano Beach, Fl. 33069 i fed-eng.com
. 1
Test Boring Report
Client: Mel-Ry Construction, Inc. Date of Test: January 1.6, 2018
Project: Proposed Single Family Home Hole No.: B-2
Address: 2044 Nettles Blvd. Location: See Attached. Drawing
Jensen Beach, FL 34957
Depth (PT)
I
Soil Descriptions
Hammer Blows
"N"
1
0" - 4"
Toosoil &Vegetation
5
3
2
4" - 1'6"'
1'6"-4'
Light Brown Sand
Gray Sand
4
8
7
3
9 7
14
4
7
8
5
10 9
19
6
4' - 9'
Pale Brown Sand with Shell Fragments
10
12
7
.11 12
25
8,
13
12
9
11 9
19
10
10
'10
1.1
14 10
21
12
9'- 15'
Pale Browri Sand
11
16
13
17 13,
27
14
14
13
1.5
12 14
16
17
1'8
19
•20
21
22
23
24
25
26
27
28
I
29
30
Water Level: 4'6" Below Land Surface
I
I
A Auger
r
„�.
a,�
v •V
ROM f.9
i'M ,
� ,�i � • Pej
�1
V
Soil Boring Location Map
Federal Engineering & Testing Inc. 250 SW 13th AVE Pompano Beach, FL 33069 (954) 784-2941
Client: Mel-Ry Construction, Inc. Project: Proposed Single Family Home
Test: Subsoil Investigation Project Address: 2044 Nettles Blvd.
(site map is not to scale): Jensen Beach, FL 34957
Classifications
Correlation of-Peiietrgiti6"n,Resist*anceWith Relative Density and Consistency
Sands,
Dynamic Cone Penetrometer
Penetrometer Resistance
I Standard Penetration
Hammer Blows.
Relative Density
0-10'
"1,
0-4
Very Loose
11-25
5-40
Loose.
26-45
11-20
Firm
45-75
21-30
Very Firm
76,-120
Dense
> 120
>� 5.0
Very Dense
Clay
Dynamic Cone Penetrometer
I Standard- enetration
Relative Density
Penetrometer Resistance
Hammer Blows
0-6
0-2
Very Soft
7-15
3 5
Soft
16-30
6-10
Firm
e
'31 _ 45
11-15
stiff
46-90
.16 - 30
Very Stiff
91-1.50
31, - 50
Hard
Soft
Rock core crumbles when handled
Medium
Can break core with your hands
Moderately Hard"
Thin edges of rock core can- be broken with fingers
Hard
Thin edges of rock core cannot be broken with fingers
Very.Hard
Rock core tings,wh6n struck with-abammer n:J
Sand';Quantity
'
Modifiers,
'Very Slight Trace
0.12%
Slight Trace
2i, 5f%
Trace
5 J M%
.Little Trace
IOIL 1.5 %
Some
15,i- 30, %
With
>! 30,6
'S' 14, Quantity' Modifiers
S ligWy Silty/Clayey
0- 5: %
Silty / Clayey
51-3.0%
Vel y :Silty / Clayey
30 - %%
- Particle- Size
Boulder
> 12 in
'Cobble
3 -12 in
Gravel
4.76 min -'3,in,
Sand
0.074 mm --4.76 imn
'Silt
0.005 mm. - 0 , 074 mm.
Clay
< 0.005 mm.
&. Sampling Procedures
The soil borings. were installed inaccordance with Standard Penetration Tests procedures as set forth in ASTM D71586.
Representative samples were collected utilizing spilt -barrel techniques in accordance with the procedures set forth in
"Penetration Tests and Spilt -Barrel Sampling of Soil in ASTM D-1586. The following field tests, measurements and
laboratory analysis were performed/collected during the installation of each soil boring.
Penetration Tests
During the sampling procedures, Standard Penetration Tests were -performed. at five (5) foot intervals to obtain the
-standard penetration value (N) of the subsurface soil. The standard penetration value (N) is identified as the number of
blows of a 140-pound hammer falling thirty (30) inches, required to advance the spilt -barrel sampler one. (1) foot into the
subsurface soil. The sampler was lower into the bottom of the previously cleaned drill hole and advanced by blows from
the hammer. The number of'blows was recorded for each of the three (3) successive increments of six (6) inches
penetration. The "N" value is obtained by adding the second and third incremental numbers.
j
Water Level Measurements
Water Level depths were obtained during the test boring operations. In -relatively pervious soils, such:as sandy soils, the
indicated depths are usually reliable groundwater levels. Seasonal variations, tidal conditions, temperature, land -use and
recent rainfall conditions may influence the depths to groundwater levels.
I
Soil Properties % Classification I
All samples collected were classified in accordance with the Unified Soil Classification System criteria to determined
soil material properties and compared with published literature of the USDA Soil Conservation Suivey.
I
Ground Surface Elevations I
Ground surface elevations have not been provided for the proposed boring locations. Therefore, all references to depth
of the various strata and materials encountered were from existing grade. at the time of the drilling operations.
ENGINEERING
tations of Liability
Warranty
We warrant that the services performed by Federal Engineering and Testing,
Inc. (F.E.T.) are conducted in a manner consistent with the level lofskill.and
care ordinarily exercised by members of the profession currently practicing
under similar conditions. No other -warranties, expressed or implied, are
made. While the services of F.E.T. are an integral and valuable part of the
design and construction process, we do not warrant, guarantee, or insure the
quality or completeness of services or satisfactory performancel provided by
other members of the construction process and/or the construction plans and
specifications which we have not. prepared, nor the ultimate performance of
building site materials. As mutual protection to clients, the public and
ourselves, all•reports are submitted as the confidential property of clients, and
authorization for publication of statements, conclusions or extracts from or
regarding our reports is reserved pending our written approval. Reports are
not intended for 3rd party use.
Subsurface Exploration
Subsurface exploration is normally accomplished by test borings. The soil
boring log includes sampling information, description ofI .the materials
recovered, approximate depths of boundaries between soil and;rock strata and
groundwater data. The log represents conditions specifically at the location
and time the boring was made. The boundaries between different soil strata
are indicated at specific depths; however, these depths are in fact approximate
and dependent upon the, frequency of sampling. The transitions between soil
stratum are often gradual. Water level readings are madeiat the,time the
boring was performed and can change with time; precipitation, canal levels,
local well drawdown, and other factors. Regardless of the thoroughness of a
Geotechnical exploration there. is -always a possibility that conditions may, be
'different from those of the test locations; therefore F.E.T. does not guarantee
any subsoil condition surrounding the bore test holes. Forla more. accurate
portrayal of subsurface conditions, the site contractor •should •perform tests
-pits. If different conditions are encountered, F,E.T. shall beinotified•to review
the findings -and make any recommendations as needed. 1
Laboratory and Field Tests
Tests are performed in accordance with specific ASTM Standards unless
otherwise indicated. All criteria included in a given,ASTM Standard are not
always required and performed. Each test report indicates the measurements
and detenninations actually made.
Ownership of Tests/Reports;
All test results and/or reports -prepared by F.E.T. pursuantto this agreement
'and/or Addendum(s) thereto, shall remain the property, of F.E.T. until all
monies due and owing to F.E.T. under this Agreement and/or-Addendum(s)
thereto, are paid in full.
i
Analysis and Recommendations
The, Geotechnical'report is prepared primarily to aid in the desigm.of site work
and structural foundations, Although the information in,the report is expected
to be sufficient for these purposes, it is not intended todetenmine the cost of
construction or to stand alone as construction specifications.
Analysis amid Recommendations cont..
In accepting this report the client understands that all data from the soil boring
is intended for foundation analysis only and is not to be used for excavating,
backfilling or pricing estimates. In accepting this,report the client understands
that all data from the soil boring is intended for foundation analysis only and
is not to be used for excavating, backfrlling or pricing estimates. The .site
contractor must fan-dliarize themselves with the job site conditions. Soil
boring(s) on unmarked vacant property or existing structure(s) to be
demolished is considered preliminary with further borings) to be performed
after proposed building pad is staked out: Report recommendations are based
primarily on data from test borings made at the locations showh on the test
boring reports. Soil variations may exist between borings and may not
become evident until cons{ruction. If variations are then noted, F.E.T. must
be contacted so that field conditions can be examined and recommendations
revised if necessary. The Geotechnical report states our understanding as to
the location, dimensions, and structural features proposed of the site. Any
significant,changes in the nature, design, or location of the'site improvements
must be communicated to F.E.T. so that the Geotechnical analysis,
conclusions, and recommendations can be appropriately adjusted.
Construction Observations
Construction observation and testing is an important element of Geotechnical
services. The Geotechnical Engineer's Field Representative (Field Rep.) is the
"owner's representative" observing the work of the contractor, perforn»ng
tests, and reporting data from such tests and observations. The Geotechnical
Engineer's Field Representative does not direct the contractor's construction
means, methods, operations, or personnel. The Field Rep. does not interfere
with the relationship'between the owner and the contractor, and except as an
observer, does not become a substitute owner on site. The Field Rep. is only
collecting data for our Engineer to review. The Field Rep, is responsible'for
his/her safety only, but has no. responsibility for the safety of other personnel
and/or the general public at the site. If the Field Rep. does not feel that the
site is offering a safe environment for him/her, the Field Rep. will stop his/her
observation/ testing until he/she deems the site is safe. The Field Rep. is an
important member of a team whose responsibility is to observe the test and
work being done and report to the client whether that work is being carried
out in general conformance with the plans and specifications.
Limitations of Report
Federal Engineering & Testing, Inc. shall have no liability, in contract, tort or
otherwise, for any inaccuracy, defect, or omission in interpreting this report
and shall not in any event have any liability for lost profits or any other
indirect, special, incidental, consequential, exemplary or punitive damages. In
the event of future conflict between owners and contractors the following
applies: F.E.T.(s) legal and/or company representation and preparation for
representation fees will be billed on an hourly rate, i.e. deposition, expert
witness, etc. F.E.T. has no obligation to amend its conclusions or
recommendations after the date of this report. Any alterations or changes in
the location of the project should be brought to our attention at the earliest
convenience for,review and applicability of this report.
ederal
7
� TESTING INC.,
roano Beach, FL 33069
Partial List of Services
Phone 954-784-2941
800-848-1919
Fax 954-784-7875
Soil /Aggregate Tests
Field 1n�pectionl*vices
.Asphalt Services
.Soil Borings
Fill & Quality Control Inspections
Backscatter Density Tests
Density Compaction Tests
Demuckng Inspections
Extractions & Gradations
Grain Size Analysis
Building inspections
Marshall Limits
Moisture Contents
Pile Driving Inspections
Bulk Specific Gravity
Soil Classifications
Pile Load Tests
Cores for Thickness Determination
Limerock Bearing Ratios
Steel Inspection
Asphalt Pavement Monitoring
Florida Bearing Values
Threshoid. Inspection
Asphalt Assessment
Specific Gravity
Bolt Inspection
Carbonate Analysis
Weld Inspection
Concrete Tests
Hydraulic Conductivity
Vibration. Monitoring
Concrete Strength" Testing
Organic,Contents
I
Slump Tests
L.A. Abrasion
Geotechnical Engineering
Windsor Probe Testing
FDOT Inspections
p
Foundation Engineering
Foundation Design & Recommendation
Schmidt Hammer Testing
Core Testing
QG Management
Subsoil Investigation
Air Content
Earthwork Inspections
P
Pile Load. Calculations
Concrete Unit Weight
QC Concrete Inspections
piling Installation Monitoring
Flexual Strength Testing.,
QC Asphalt Inspections
Environmental Engineering Services
Phase I Site Assessments
Phase Ili"Site Assessments
Lead Base Paint -Surveys
Site Inspections
Phase I Follow upon Contaminated Sites
Report and Analysis.
Research of Property Records
Installation of Monitoring Wells
Air Monitoring
Soil and Ground WaterAnalysis
TAS 105 Field Fastener Withdrawal Test
TAS 106 Tile Uplift Test
TAS 124 Bell Chamber] Bonded Pull Test
TAS 126 Moisture Survey
Windload Calculation
Drainage Calculations
Lightweight Concrete placement Inspection
Roof Assessment / Evaluation
Cap Sheet Inspection
Fastener Spacing Inspection
Tile/ Shingle/ Standing Seam Inspection
Base Sheet Installation Inspection
Insurance Mitigation
Retrofit Mitigation? Certification
Roof Drainage Calculations
Construction Material
Engineering Council
srican Concrete
i Institute
I
i,imm DADE
Miami Dade
County
0111
Florida Department
of Transportation